To the Top

CPMM_Contraceptive prevalence: Any modern method (Percentage)

Choose variables

Mark your selections and choose between table on screen and file format. Marking tips
Mandatory
Field for searching for a specific value in the list box. This is examples of values you can search for.Albania , Andorra , Argentina ,

Selected 0 of total 65

Mandatory
Field for searching for a specific value in the list box. This is examples of values you can search for.1970 , 1971 , 1972 ,

Selected 1 of total 53

Number of selected data cells are:
(maximum number allowed is 500,000)
Number of selected cells exceeds the maximum allowed 500,000

Obs:

Source(s )used: United Nations, Department of Economic and Social Affairs, Population Division (2022). Estimates and Projections of Family Planning Indicators 2022. New York: United Nations. Donwloaded from https://www.un.org/development/desa/pd/data/family-planning-indicators on 18/01/2023 Citation Guidelines:
All data are free for scientific use only. For any other use, please contact the data producer directly to obtain authorization. Please cite the database as follows:
Generations and Gender Programme (Year). Generations and Gender Contextual Database. Netherlands Interdisciplinary Demographic Institute (distributor).
Retrieved from: https://www.ggp-i.org/data/ggp-contextual-database/ on Day/Month/Year
If the data downloaded from the GGP Contextual Database comes only from one source (e.g. Eurostat), you might cite it as follows:
Original Source [e.g. Eurostat, © European Union, 1995-2019] (Data obtained through the Generations and Gender Contextual Database. Netherlands Interdisciplinary Demographic Institute (distributor). Retrieved from: https://www.ggp-i.org/data/ggp-contextual-database/ on Day/Month/Year)
Please also check the original source for further information on the use of the data and proper citation. Indicator (long name): Contraceptive prevalence: Any modern method (Percentage) Indicator (short name): CPMM Definition: Percentage of married or in-union women of reproductive age (15-49 years) who are currently, or whose sexual partner is currently using, any modern method of contraception. Source of variable definition: Source(s)used: United Nations, Department of Economic and Social Affairs, Population Division (2022). Estimates and Projections of Family Planning Indicators 2022. New York: United Nations. Downloaded from https://www.un.org/development/desa/pd/data/family-planning-indicators on 18/01/2023 Comments: Data are model-based estimates pertaining to married or in-union women for years 1970-2022. Data are median values and were obtained either through interpolation or projection. The estimation method (either interpolation or projection) is given in the footnotes. Footnotes also contain the 80 percent uncertainty intervals and the 95 percent uncertainty intervals, for each year. A Bayesian hierarchical model combined with country-specific time trends was used to generate the estimates, projections and uncertainty assessments.
The model-based estimates and projections were derived from survey-based estimates by country, as compiled in: United Nations, Department of Economic and Social Affairs, Population Division (2022) World Contraceptive Use 2022. New York: United Nations.
In the survey-based estimates, contraceptive methods include: 1) modern methods - i.e., female & male sterilizations, IUD, implant, injectable, pill, male and female condoms, vaginal barrier methods, lactational amenorrhea method (LAM), emergency contraception, and other modern methods not reported separately -, and 2) traditional methods - i.e., rhythm, withdrawal and other traditional methods not reported separately. For the categories 'other methods not reported separately', please see the notes on residuals for each type of contraceptive methods in the original publication.
The model-based estimates account for differences by data source in the characteristics of the sample population and in the contraceptive methods included in survey-based estimates of prevalence.
For further details, see the documentation accompanying the dataset available from: https://www.un.org/development/desa/pd/sites/www.un.org.development.desa.pd/files/undesa_pd_2022_wcu_fp-indicators_documentation.pdf (last accessed on 18/1/2023).
Reference areas: Click here to download the list of reference areas and the respective geographical codes.

Country: Albania , Year: 1970

Estimation Method: Projection. Uncertainty (80%) bounds are between 1.1 and 18. Uncertainty (95%) bounds are between 2.2 and 26.4.

Country: Albania , Year: 1971

Estimation Method: Projection. Uncertainty (80%) bounds are between 1.1 and 18.1. Uncertainty (95%) bounds are between 2.3 and 26.5.

Country: Albania , Year: 1972

Estimation Method: Projection. Uncertainty (80%) bounds are between 1.2 and 18.3. Uncertainty (95%) bounds are between 2.4 and 26.5.

Country: Albania , Year: 1973

Estimation Method: Projection. Uncertainty (80%) bounds are between 1.3 and 18.5. Uncertainty (95%) bounds are between 2.6 and 26.6.

Country: Albania , Year: 1974

Estimation Method: Projection. Uncertainty (80%) bounds are between 1.4 and 18.6. Uncertainty (95%) bounds are between 2.7 and 26.4.

Country: Albania , Year: 1975

Estimation Method: Projection. Uncertainty (80%) bounds are between 1.5 and 18.7. Uncertainty (95%) bounds are between 2.8 and 26.8.

Country: Albania , Year: 1976

Estimation Method: Projection. Uncertainty (80%) bounds are between 1.6 and 18.9. Uncertainty (95%) bounds are between 3 and 26.8.

Country: Albania , Year: 1977

Estimation Method: Projection. Uncertainty (80%) bounds are between 1.7 and 18.9. Uncertainty (95%) bounds are between 3.2 and 26.9.

Country: Albania , Year: 1978

Estimation Method: Projection. Uncertainty (80%) bounds are between 1.8 and 19. Uncertainty (95%) bounds are between 3.3 and 26.7.

Country: Albania , Year: 1979

Estimation Method: Projection. Uncertainty (80%) bounds are between 1.9 and 19.2. Uncertainty (95%) bounds are between 3.5 and 26.9.

Country: Albania , Year: 1980

Estimation Method: Projection. Uncertainty (80%) bounds are between 2.1 and 19.3. Uncertainty (95%) bounds are between 3.7 and 26.7.

Country: Albania , Year: 1981

Estimation Method: Projection. Uncertainty (80%) bounds are between 2.2 and 19.5. Uncertainty (95%) bounds are between 3.9 and 26.9.

Country: Albania , Year: 1982

Estimation Method: Projection. Uncertainty (80%) bounds are between 2.4 and 19.7. Uncertainty (95%) bounds are between 4.1 and 26.8.

Country: Albania , Year: 1983

Estimation Method: Projection. Uncertainty (80%) bounds are between 2.5 and 19.8. Uncertainty (95%) bounds are between 4.3 and 26.8.

Country: Albania , Year: 1984

Estimation Method: Projection. Uncertainty (80%) bounds are between 2.7 and 19.8. Uncertainty (95%) bounds are between 4.5 and 26.7.

Country: Albania , Year: 1985

Estimation Method: Projection. Uncertainty (80%) bounds are between 2.9 and 19.9. Uncertainty (95%) bounds are between 4.8 and 26.8.

Country: Albania , Year: 1986

Estimation Method: Projection. Uncertainty (80%) bounds are between 3.1 and 20. Uncertainty (95%) bounds are between 5 and 26.4.

Country: Albania , Year: 1987

Estimation Method: Projection. Uncertainty (80%) bounds are between 3.4 and 20. Uncertainty (95%) bounds are between 5.2 and 26.4.

Country: Albania , Year: 1988

Estimation Method: Projection. Uncertainty (80%) bounds are between 3.6 and 19.9. Uncertainty (95%) bounds are between 5.5 and 26.

Country: Albania , Year: 1989

Estimation Method: Projection. Uncertainty (80%) bounds are between 3.9 and 20. Uncertainty (95%) bounds are between 5.7 and 25.9.

Country: Albania , Year: 1990

Estimation Method: Projection. Uncertainty (80%) bounds are between 4.1 and 19.8. Uncertainty (95%) bounds are between 6 and 25.8.

Country: Albania , Year: 1991

Estimation Method: Projection. Uncertainty (80%) bounds are between 4.4 and 19.8. Uncertainty (95%) bounds are between 6.2 and 25.2.

Country: Albania , Year: 1992

Estimation Method: Projection. Uncertainty (80%) bounds are between 4.7 and 19.7. Uncertainty (95%) bounds are between 6.5 and 24.7.

Country: Albania , Year: 1993

Estimation Method: Projection. Uncertainty (80%) bounds are between 5 and 19.5. Uncertainty (95%) bounds are between 6.9 and 24.2.

Country: Albania , Year: 1994

Estimation Method: Projection. Uncertainty (80%) bounds are between 5.4 and 19.3. Uncertainty (95%) bounds are between 7.3 and 24.

Country: Albania , Year: 1995

Estimation Method: Projection. Uncertainty (80%) bounds are between 5.7 and 19.1. Uncertainty (95%) bounds are between 7.6 and 23.4.

Country: Albania , Year: 1996

Estimation Method: Projection. Uncertainty (80%) bounds are between 6.2 and 18.8. Uncertainty (95%) bounds are between 8 and 22.8.

Country: Albania , Year: 1997

Estimation Method: Projection. Uncertainty (80%) bounds are between 6.7 and 18.5. Uncertainty (95%) bounds are between 8.5 and 22.1.

Country: Albania , Year: 1998

Estimation Method: Projection. Uncertainty (80%) bounds are between 7.3 and 18. Uncertainty (95%) bounds are between 8.9 and 21.3.

Country: Albania , Year: 1999

Estimation Method: Projection. Uncertainty (80%) bounds are between 7.9 and 17.7. Uncertainty (95%) bounds are between 9.5 and 20.4.

Country: Albania , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 8.7 and 17.2. Uncertainty (95%) bounds are between 10.1 and 19.5.

Country: Albania , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 8.6 and 16.9. Uncertainty (95%) bounds are between 10.1 and 19.1.

Country: Albania , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 8.9 and 16.5. Uncertainty (95%) bounds are between 10.2 and 18.6.

Country: Albania , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 9.3 and 17.3. Uncertainty (95%) bounds are between 10.6 and 19.5.

Country: Albania , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 9.8 and 17.9. Uncertainty (95%) bounds are between 11.2 and 20.

Country: Albania , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 10.5 and 18.3. Uncertainty (95%) bounds are between 12 and 20.3.

Country: Albania , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 10 and 17.5. Uncertainty (95%) bounds are between 11.3 and 19.5.

Country: Albania , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 9.7 and 16.4. Uncertainty (95%) bounds are between 10.9 and 18.

Country: Albania , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 9.7 and 14.8. Uncertainty (95%) bounds are between 10.7 and 16.1.

Country: Albania , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 9 and 13.7. Uncertainty (95%) bounds are between 9.9 and 14.8.

Country: Albania , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 7.3 and 12.8. Uncertainty (95%) bounds are between 8.3 and 14.3.

Country: Albania , Year: 2011

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 6 and 11.7. Uncertainty (95%) bounds are between 7 and 13.3.

Country: Albania , Year: 2012

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 5.1 and 10.5. Uncertainty (95%) bounds are between 6 and 12.1.

Country: Albania , Year: 2013

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 4.4 and 9.3. Uncertainty (95%) bounds are between 5.2 and 10.6.

Country: Albania , Year: 2014

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 3.8 and 8. Uncertainty (95%) bounds are between 4.5 and 9.2.

Country: Albania , Year: 2015

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 3.4 and 6.8. Uncertainty (95%) bounds are between 4 and 7.8.

Country: Albania , Year: 2016

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 3.2 and 5.7. Uncertainty (95%) bounds are between 3.6 and 6.5.

Country: Albania , Year: 2017

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 3.1 and 4.7. Uncertainty (95%) bounds are between 3.4 and 5.1.

Country: Albania , Year: 2018

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 2.9 and 4.9. Uncertainty (95%) bounds are between 3.3 and 5.4.

Country: Albania , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 2.8 and 5.6. Uncertainty (95%) bounds are between 3.3 and 6.4.

Country: Albania , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 2.8 and 6.4. Uncertainty (95%) bounds are between 3.3 and 7.5.

Country: Albania , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 2.8 and 7.1. Uncertainty (95%) bounds are between 3.4 and 8.6.

Country: Albania , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 2.8 and 8. Uncertainty (95%) bounds are between 3.5 and 9.8.

Country: Argentina , Year: 1970

Estimation Method: Projection. Uncertainty (80%) bounds are between 1.9 and 56. Uncertainty (95%) bounds are between 5.5 and 68.4.

Country: Argentina , Year: 1971

Estimation Method: Projection. Uncertainty (80%) bounds are between 2.2 and 56.7. Uncertainty (95%) bounds are between 6.2 and 68.7.

Country: Argentina , Year: 1972

Estimation Method: Projection. Uncertainty (80%) bounds are between 2.6 and 57.2. Uncertainty (95%) bounds are between 6.9 and 68.9.

Country: Argentina , Year: 1973

Estimation Method: Projection. Uncertainty (80%) bounds are between 3 and 57.7. Uncertainty (95%) bounds are between 7.7 and 68.9.

Country: Argentina , Year: 1974

Estimation Method: Projection. Uncertainty (80%) bounds are between 3.6 and 58.1. Uncertainty (95%) bounds are between 8.5 and 69.

Country: Argentina , Year: 1975

Estimation Method: Projection. Uncertainty (80%) bounds are between 4.2 and 58.6. Uncertainty (95%) bounds are between 9.4 and 69.1.

Country: Argentina , Year: 1976

Estimation Method: Projection. Uncertainty (80%) bounds are between 4.8 and 59.1. Uncertainty (95%) bounds are between 10.4 and 69.3.

Country: Argentina , Year: 1977

Estimation Method: Projection. Uncertainty (80%) bounds are between 5.6 and 59.5. Uncertainty (95%) bounds are between 11.6 and 69.5.

Country: Argentina , Year: 1978

Estimation Method: Projection. Uncertainty (80%) bounds are between 6.4 and 60. Uncertainty (95%) bounds are between 12.8 and 69.7.

Country: Argentina , Year: 1979

Estimation Method: Projection. Uncertainty (80%) bounds are between 7.4 and 60.4. Uncertainty (95%) bounds are between 14.1 and 69.9.

Country: Argentina , Year: 1980

Estimation Method: Projection. Uncertainty (80%) bounds are between 8.5 and 60.7. Uncertainty (95%) bounds are between 15.5 and 69.8.

Country: Argentina , Year: 1981

Estimation Method: Projection. Uncertainty (80%) bounds are between 9.7 and 60.9. Uncertainty (95%) bounds are between 17 and 70.

Country: Argentina , Year: 1982

Estimation Method: Projection. Uncertainty (80%) bounds are between 10.9 and 61.4. Uncertainty (95%) bounds are between 18.5 and 70.

Country: Argentina , Year: 1983

Estimation Method: Projection. Uncertainty (80%) bounds are between 12.2 and 61.7. Uncertainty (95%) bounds are between 20 and 70.

Country: Argentina , Year: 1984

Estimation Method: Projection. Uncertainty (80%) bounds are between 13.8 and 61.9. Uncertainty (95%) bounds are between 21.7 and 69.9.

Country: Argentina , Year: 1985

Estimation Method: Projection. Uncertainty (80%) bounds are between 15.4 and 62.2. Uncertainty (95%) bounds are between 23.6 and 69.8.

Country: Argentina , Year: 1986

Estimation Method: Projection. Uncertainty (80%) bounds are between 17.2 and 62.2. Uncertainty (95%) bounds are between 25.2 and 69.7.

Country: Argentina , Year: 1987

Estimation Method: Projection. Uncertainty (80%) bounds are between 19.1 and 62.5. Uncertainty (95%) bounds are between 27.2 and 69.5.

Country: Argentina , Year: 1988

Estimation Method: Projection. Uncertainty (80%) bounds are between 21.2 and 62.6. Uncertainty (95%) bounds are between 29.1 and 69.4.

Country: Argentina , Year: 1989

Estimation Method: Projection. Uncertainty (80%) bounds are between 23.1 and 62.9. Uncertainty (95%) bounds are between 30.8 and 69.3.

Country: Argentina , Year: 1990

Estimation Method: Projection. Uncertainty (80%) bounds are between 25.4 and 62.9. Uncertainty (95%) bounds are between 32.8 and 69.2.

Country: Argentina , Year: 1991

Estimation Method: Projection. Uncertainty (80%) bounds are between 27.4 and 63.1. Uncertainty (95%) bounds are between 34.7 and 69.1.

Country: Argentina , Year: 1992

Estimation Method: Projection. Uncertainty (80%) bounds are between 29.3 and 63.3. Uncertainty (95%) bounds are between 36.6 and 69.

Country: Argentina , Year: 1993

Estimation Method: Projection. Uncertainty (80%) bounds are between 31 and 63.6. Uncertainty (95%) bounds are between 38.5 and 68.9.

Country: Argentina , Year: 1994

Estimation Method: Projection. Uncertainty (80%) bounds are between 33.1 and 64. Uncertainty (95%) bounds are between 40.2 and 68.9.

Country: Argentina , Year: 1995

Estimation Method: Projection. Uncertainty (80%) bounds are between 35.1 and 64.2. Uncertainty (95%) bounds are between 42 and 68.9.

Country: Argentina , Year: 1996

Estimation Method: Projection. Uncertainty (80%) bounds are between 37.2 and 64.5. Uncertainty (95%) bounds are between 43.8 and 69.

Country: Argentina , Year: 1997

Estimation Method: Projection. Uncertainty (80%) bounds are between 39.2 and 64.7. Uncertainty (95%) bounds are between 45.5 and 68.8.

Country: Argentina , Year: 1998

Estimation Method: Projection. Uncertainty (80%) bounds are between 41.2 and 64.9. Uncertainty (95%) bounds are between 47.4 and 68.7.

Country: Argentina , Year: 1999

Estimation Method: Projection. Uncertainty (80%) bounds are between 43 and 65.2. Uncertainty (95%) bounds are between 49.2 and 68.4.

Country: Argentina , Year: 2000

Estimation Method: Projection. Uncertainty (80%) bounds are between 44.9 and 65.5. Uncertainty (95%) bounds are between 51.1 and 68.3.

Country: Argentina , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47 and 66.3. Uncertainty (95%) bounds are between 53.1 and 68.6.

Country: Argentina , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.4 and 67.7. Uncertainty (95%) bounds are between 55.6 and 69.8.

Country: Argentina , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.1 and 69.2. Uncertainty (95%) bounds are between 57.9 and 71.1.

Country: Argentina , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.2 and 70.4. Uncertainty (95%) bounds are between 59.8 and 72.1.

Country: Argentina , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.4 and 71.1. Uncertainty (95%) bounds are between 60.5 and 73.

Country: Argentina , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.1 and 71.5. Uncertainty (95%) bounds are between 60.7 and 73.5.

Country: Argentina , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.3 and 71.5. Uncertainty (95%) bounds are between 60.6 and 73.7.

Country: Argentina , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.5 and 71.3. Uncertainty (95%) bounds are between 60.3 and 73.7.

Country: Argentina , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.5 and 71. Uncertainty (95%) bounds are between 60.2 and 73.4.

Country: Argentina , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.7 and 70.6. Uncertainty (95%) bounds are between 60 and 72.9.

Country: Argentina , Year: 2011

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.1 and 70.3. Uncertainty (95%) bounds are between 60.2 and 72.7.

Country: Argentina , Year: 2012

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.6 and 70.3. Uncertainty (95%) bounds are between 60.6 and 72.6.

Country: Argentina , Year: 2013

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.1 and 70.6. Uncertainty (95%) bounds are between 61 and 72.8.

Country: Argentina , Year: 2014

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.1 and 71. Uncertainty (95%) bounds are between 61 and 73.3.

Country: Argentina , Year: 2015

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.9 and 71.4. Uncertainty (95%) bounds are between 61 and 73.9.

Country: Argentina , Year: 2016

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.8 and 71.8. Uncertainty (95%) bounds are between 61 and 74.3.

Country: Argentina , Year: 2017

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.7 and 72. Uncertainty (95%) bounds are between 60.9 and 74.6.

Country: Argentina , Year: 2018

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.8 and 72.3. Uncertainty (95%) bounds are between 61 and 74.9.

Country: Argentina , Year: 2019

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.9 and 72.5. Uncertainty (95%) bounds are between 61.1 and 75.1.

Country: Argentina , Year: 2020

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.5 and 73. Uncertainty (95%) bounds are between 61 and 75.8.

Country: Argentina , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 56.9 and 73.6. Uncertainty (95%) bounds are between 60.6 and 76.6.

Country: Argentina , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 56.1 and 74.3. Uncertainty (95%) bounds are between 60.3 and 77.5.

Country: Armenia , Year: 1970

Estimation Method: Projection. Uncertainty (80%) bounds are between 3.8 and 34.2. Uncertainty (95%) bounds are between 6.8 and 44.4.

Country: Armenia , Year: 1971

Estimation Method: Projection. Uncertainty (80%) bounds are between 4.1 and 34.1. Uncertainty (95%) bounds are between 7.3 and 44.3.

Country: Armenia , Year: 1972

Estimation Method: Projection. Uncertainty (80%) bounds are between 4.4 and 34.2. Uncertainty (95%) bounds are between 7.7 and 44.

Country: Armenia , Year: 1973

Estimation Method: Projection. Uncertainty (80%) bounds are between 4.8 and 34.3. Uncertainty (95%) bounds are between 8.2 and 43.8.

Country: Armenia , Year: 1974

Estimation Method: Projection. Uncertainty (80%) bounds are between 5.2 and 34.2. Uncertainty (95%) bounds are between 8.6 and 43.5.

Country: Armenia , Year: 1975

Estimation Method: Projection. Uncertainty (80%) bounds are between 5.6 and 34.2. Uncertainty (95%) bounds are between 9 and 43.1.

Country: Armenia , Year: 1976

Estimation Method: Projection. Uncertainty (80%) bounds are between 6.1 and 34.1. Uncertainty (95%) bounds are between 9.5 and 42.9.

Country: Armenia , Year: 1977

Estimation Method: Projection. Uncertainty (80%) bounds are between 6.5 and 34.1. Uncertainty (95%) bounds are between 10 and 42.6.

Country: Armenia , Year: 1978

Estimation Method: Projection. Uncertainty (80%) bounds are between 7.1 and 34. Uncertainty (95%) bounds are between 10.5 and 42.1.

Country: Armenia , Year: 1979

Estimation Method: Projection. Uncertainty (80%) bounds are between 7.6 and 33.8. Uncertainty (95%) bounds are between 11.1 and 41.7.

Country: Armenia , Year: 1980

Estimation Method: Projection. Uncertainty (80%) bounds are between 8.1 and 33.7. Uncertainty (95%) bounds are between 11.6 and 41.1.

Country: Armenia , Year: 1981

Estimation Method: Projection. Uncertainty (80%) bounds are between 8.7 and 33.5. Uncertainty (95%) bounds are between 12.1 and 40.7.

Country: Armenia , Year: 1982

Estimation Method: Projection. Uncertainty (80%) bounds are between 9.2 and 33.5. Uncertainty (95%) bounds are between 12.8 and 40.2.

Country: Armenia , Year: 1983

Estimation Method: Projection. Uncertainty (80%) bounds are between 10 and 33.2. Uncertainty (95%) bounds are between 13.3 and 39.6.

Country: Armenia , Year: 1984

Estimation Method: Projection. Uncertainty (80%) bounds are between 10.6 and 32.9. Uncertainty (95%) bounds are between 14 and 39.1.

Country: Armenia , Year: 1985

Estimation Method: Projection. Uncertainty (80%) bounds are between 11.3 and 32.6. Uncertainty (95%) bounds are between 14.6 and 38.4.

Country: Armenia , Year: 1986

Estimation Method: Projection. Uncertainty (80%) bounds are between 12.1 and 32.3. Uncertainty (95%) bounds are between 15.2 and 37.7.

Country: Armenia , Year: 1987

Estimation Method: Projection. Uncertainty (80%) bounds are between 12.8 and 32.1. Uncertainty (95%) bounds are between 16 and 37.4.

Country: Armenia , Year: 1988

Estimation Method: Projection. Uncertainty (80%) bounds are between 13.6 and 31.7. Uncertainty (95%) bounds are between 16.5 and 36.5.

Country: Armenia , Year: 1989

Estimation Method: Projection. Uncertainty (80%) bounds are between 14.3 and 31.3. Uncertainty (95%) bounds are between 17.3 and 35.7.

Country: Armenia , Year: 1990

Estimation Method: Projection. Uncertainty (80%) bounds are between 15.2 and 31. Uncertainty (95%) bounds are between 18 and 35.1.

Country: Armenia , Year: 1991

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 16 and 30.5. Uncertainty (95%) bounds are between 18.7 and 34.3.

Country: Armenia , Year: 1992

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 16 and 30.7. Uncertainty (95%) bounds are between 18.8 and 34.4.

Country: Armenia , Year: 1993

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 16.1 and 30.8. Uncertainty (95%) bounds are between 18.8 and 34.3.

Country: Armenia , Year: 1994

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 16.2 and 30.7. Uncertainty (95%) bounds are between 18.9 and 34.1.

Country: Armenia , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 16.4 and 30.4. Uncertainty (95%) bounds are between 19 and 33.8.

Country: Armenia , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 16.7 and 30.1. Uncertainty (95%) bounds are between 19.2 and 33.3.

Country: Armenia , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 17.2 and 29.5. Uncertainty (95%) bounds are between 19.5 and 32.3.

Country: Armenia , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 17.8 and 28.8. Uncertainty (95%) bounds are between 20 and 31.2.

Country: Armenia , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 18.9 and 27.6. Uncertainty (95%) bounds are between 20.6 and 29.5.

Country: Armenia , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 20.3 and 26.1. Uncertainty (95%) bounds are between 21.5 and 27.3.

Country: Armenia , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 18.4 and 26.3. Uncertainty (95%) bounds are between 20 and 28.1.

Country: Armenia , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 17.2 and 25.9. Uncertainty (95%) bounds are between 18.9 and 27.9.

Country: Armenia , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 16.6 and 25.1. Uncertainty (95%) bounds are between 18.3 and 27.1.

Country: Armenia , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 16.6 and 23.9. Uncertainty (95%) bounds are between 18 and 25.6.

Country: Armenia , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 17.4 and 22.4. Uncertainty (95%) bounds are between 18.3 and 23.6.

Country: Armenia , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 16.9 and 24.3. Uncertainty (95%) bounds are between 18.4 and 26.

Country: Armenia , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 17.4 and 25.9. Uncertainty (95%) bounds are between 19 and 27.8.

Country: Armenia , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 18.3 and 27.2. Uncertainty (95%) bounds are between 20.1 and 29.3.

Country: Armenia , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 19.7 and 28.2. Uncertainty (95%) bounds are between 21.5 and 30.

Country: Armenia , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 22.1 and 28.4. Uncertainty (95%) bounds are between 23.4 and 29.8.

Country: Armenia , Year: 2011

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 21.1 and 29.9. Uncertainty (95%) bounds are between 22.9 and 31.8.

Country: Armenia , Year: 2012

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 20.7 and 30.8. Uncertainty (95%) bounds are between 22.8 and 32.9.

Country: Armenia , Year: 2013

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 20.8 and 31.3. Uncertainty (95%) bounds are between 23 and 33.6.

Country: Armenia , Year: 2014

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 21.4 and 31.4. Uncertainty (95%) bounds are between 23.4 and 33.5.

Country: Armenia , Year: 2015

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 22.5 and 31.1. Uncertainty (95%) bounds are between 24.3 and 32.8.

Country: Armenia , Year: 2016

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 23.7 and 30.8. Uncertainty (95%) bounds are between 25.3 and 32.3.

Country: Armenia , Year: 2017

Estimation Method: Projection. Uncertainty (80%) bounds are between 22.4 and 32.8. Uncertainty (95%) bounds are between 24.6 and 34.9.

Country: Armenia , Year: 2018

Estimation Method: Projection. Uncertainty (80%) bounds are between 21.6 and 34.4. Uncertainty (95%) bounds are between 24.3 and 37.2.

Country: Armenia , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 21.1 and 36.1. Uncertainty (95%) bounds are between 24 and 39.4.

Country: Armenia , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 20.6 and 37.6. Uncertainty (95%) bounds are between 23.9 and 41.4.

Country: Armenia , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 20.3 and 39. Uncertainty (95%) bounds are between 23.8 and 43.3.

Country: Armenia , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 20 and 40.3. Uncertainty (95%) bounds are between 23.9 and 45.

Country: Australia , Year: 1970

Estimation Method: Projection. Uncertainty (80%) bounds are between 43.1 and 78. Uncertainty (95%) bounds are between 51.9 and 82.7.

Country: Australia , Year: 1971

Estimation Method: Projection. Uncertainty (80%) bounds are between 44.3 and 77.9. Uncertainty (95%) bounds are between 52.9 and 82.6.

Country: Australia , Year: 1972

Estimation Method: Projection. Uncertainty (80%) bounds are between 45.7 and 77.8. Uncertainty (95%) bounds are between 53.6 and 82.3.

Country: Australia , Year: 1973

Estimation Method: Projection. Uncertainty (80%) bounds are between 46.9 and 77.7. Uncertainty (95%) bounds are between 54.4 and 82.

Country: Australia , Year: 1974

Estimation Method: Projection. Uncertainty (80%) bounds are between 48.1 and 77.7. Uncertainty (95%) bounds are between 55.2 and 81.9.

Country: Australia , Year: 1975

Estimation Method: Projection. Uncertainty (80%) bounds are between 49.2 and 77.4. Uncertainty (95%) bounds are between 56.2 and 81.4.

Country: Australia , Year: 1976

Estimation Method: Projection. Uncertainty (80%) bounds are between 50.5 and 77.3. Uncertainty (95%) bounds are between 57.2 and 81.2.

Country: Australia , Year: 1977

Estimation Method: Projection. Uncertainty (80%) bounds are between 51.6 and 77.1. Uncertainty (95%) bounds are between 58.1 and 80.8.

Country: Australia , Year: 1978

Estimation Method: Projection. Uncertainty (80%) bounds are between 52.9 and 76.8. Uncertainty (95%) bounds are between 59.1 and 80.4.

Country: Australia , Year: 1979

Estimation Method: Projection. Uncertainty (80%) bounds are between 54.4 and 76.6. Uncertainty (95%) bounds are between 60 and 80.

Country: Australia , Year: 1980

Estimation Method: Projection. Uncertainty (80%) bounds are between 55.7 and 76.4. Uncertainty (95%) bounds are between 61 and 79.5.

Country: Australia , Year: 1981

Estimation Method: Projection. Uncertainty (80%) bounds are between 57.4 and 76. Uncertainty (95%) bounds are between 61.9 and 78.9.

Country: Australia , Year: 1982

Estimation Method: Projection. Uncertainty (80%) bounds are between 58.9 and 75.5. Uncertainty (95%) bounds are between 62.8 and 78.3.

Country: Australia , Year: 1983

Estimation Method: Projection. Uncertainty (80%) bounds are between 60.2 and 75.1. Uncertainty (95%) bounds are between 63.8 and 77.6.

Country: Australia , Year: 1984

Estimation Method: Projection. Uncertainty (80%) bounds are between 61.5 and 74.5. Uncertainty (95%) bounds are between 64.8 and 76.8.

Country: Australia , Year: 1985

Estimation Method: Projection. Uncertainty (80%) bounds are between 62.6 and 73.9. Uncertainty (95%) bounds are between 65.5 and 75.8.

Country: Australia , Year: 1986

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.2 and 73.2. Uncertainty (95%) bounds are between 65.9 and 74.8.

Country: Australia , Year: 1987

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.4 and 72.9. Uncertainty (95%) bounds are between 65.2 and 74.6.

Country: Australia , Year: 1988

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.2 and 72.4. Uncertainty (95%) bounds are between 64.2 and 74.3.

Country: Australia , Year: 1989

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.2 and 71.9. Uncertainty (95%) bounds are between 63.1 and 73.9.

Country: Australia , Year: 1990

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.1 and 71.3. Uncertainty (95%) bounds are between 62 and 73.4.

Country: Australia , Year: 1991

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.8 and 70.7. Uncertainty (95%) bounds are between 60.9 and 73.

Country: Australia , Year: 1992

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.5 and 70.1. Uncertainty (95%) bounds are between 59.8 and 72.4.

Country: Australia , Year: 1993

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.6 and 69.4. Uncertainty (95%) bounds are between 58.9 and 71.8.

Country: Australia , Year: 1994

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.8 and 68.7. Uncertainty (95%) bounds are between 58.2 and 71.2.

Country: Australia , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.2 and 68.3. Uncertainty (95%) bounds are between 57.8 and 70.8.

Country: Australia , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.8 and 68.4. Uncertainty (95%) bounds are between 57.3 and 70.9.

Country: Australia , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.5 and 68.6. Uncertainty (95%) bounds are between 57.2 and 71.2.

Country: Australia , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.6 and 68.8. Uncertainty (95%) bounds are between 57.3 and 71.6.

Country: Australia , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.9 and 69. Uncertainty (95%) bounds are between 57.6 and 71.6.

Country: Australia , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.2 and 69. Uncertainty (95%) bounds are between 57.9 and 71.5.

Country: Australia , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.6 and 68.7. Uncertainty (95%) bounds are between 58.3 and 71.

Country: Australia , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.7 and 68. Uncertainty (95%) bounds are between 58.1 and 70.4.

Country: Australia , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.8 and 67.2. Uncertainty (95%) bounds are between 57.9 and 69.3.

Country: Australia , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.8 and 66.1. Uncertainty (95%) bounds are between 57.8 and 68.

Country: Australia , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.7 and 65.1. Uncertainty (95%) bounds are between 57.7 and 66.8.

Country: Australia , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.2 and 64.4. Uncertainty (95%) bounds are between 57.1 and 66.

Country: Australia , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.7 and 63.9. Uncertainty (95%) bounds are between 56.7 and 65.5.

Country: Australia , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.7 and 63.6. Uncertainty (95%) bounds are between 56.6 and 65.1.

Country: Australia , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.1 and 64. Uncertainty (95%) bounds are between 56.9 and 65.5.

Country: Australia , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.7 and 64.7. Uncertainty (95%) bounds are between 57.6 and 66.3.

Country: Australia , Year: 2011

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.5 and 65.4. Uncertainty (95%) bounds are between 58.4 and 66.9.

Country: Australia , Year: 2012

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.8 and 66. Uncertainty (95%) bounds are between 58.8 and 67.6.

Country: Australia , Year: 2013

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.9 and 66.5. Uncertainty (95%) bounds are between 58.8 and 68.2.

Country: Australia , Year: 2014

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.1 and 66.6. Uncertainty (95%) bounds are between 59 and 68.4.

Country: Australia , Year: 2015

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.2 and 66.8. Uncertainty (95%) bounds are between 59.1 and 68.5.

Country: Australia , Year: 2016

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.5 and 67.3. Uncertainty (95%) bounds are between 58.6 and 69.3.

Country: Australia , Year: 2017

Estimation Method: Projection. Uncertainty (80%) bounds are between 54.5 and 68.2. Uncertainty (95%) bounds are between 57.9 and 70.6.

Country: Australia , Year: 2018

Estimation Method: Projection. Uncertainty (80%) bounds are between 53.3 and 69.2. Uncertainty (95%) bounds are between 57 and 71.9.

Country: Australia , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 52.2 and 69.9. Uncertainty (95%) bounds are between 56.2 and 73.

Country: Australia , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 51.1 and 70.7. Uncertainty (95%) bounds are between 55.5 and 74.

Country: Australia , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 50.1 and 71.4. Uncertainty (95%) bounds are between 54.7 and 75.

Country: Australia , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 49 and 72.1. Uncertainty (95%) bounds are between 54.2 and 75.8.

Country: Austria , Year: 1970

Estimation Method: Projection. Uncertainty (80%) bounds are between 2.4 and 52.9. Uncertainty (95%) bounds are between 7.6 and 65.3.

Country: Austria , Year: 1971

Estimation Method: Projection. Uncertainty (80%) bounds are between 2.9 and 54. Uncertainty (95%) bounds are between 8.7 and 65.5.

Country: Austria , Year: 1972

Estimation Method: Projection. Uncertainty (80%) bounds are between 3.5 and 55. Uncertainty (95%) bounds are between 9.9 and 66.1.

Country: Austria , Year: 1973

Estimation Method: Projection. Uncertainty (80%) bounds are between 4.2 and 55.8. Uncertainty (95%) bounds are between 11.2 and 66.5.

Country: Austria , Year: 1974

Estimation Method: Projection. Uncertainty (80%) bounds are between 5 and 56.5. Uncertainty (95%) bounds are between 12.5 and 66.5.

Country: Austria , Year: 1975

Estimation Method: Projection. Uncertainty (80%) bounds are between 5.9 and 57.2. Uncertainty (95%) bounds are between 14 and 66.9.

Country: Austria , Year: 1976

Estimation Method: Projection. Uncertainty (80%) bounds are between 6.9 and 58. Uncertainty (95%) bounds are between 15.8 and 67.

Country: Austria , Year: 1977

Estimation Method: Projection. Uncertainty (80%) bounds are between 8.3 and 58.6. Uncertainty (95%) bounds are between 17.5 and 67.3.

Country: Austria , Year: 1978

Estimation Method: Projection. Uncertainty (80%) bounds are between 9.9 and 59.2. Uncertainty (95%) bounds are between 19.4 and 67.8.

Country: Austria , Year: 1979

Estimation Method: Projection. Uncertainty (80%) bounds are between 11.5 and 59.8. Uncertainty (95%) bounds are between 21.4 and 67.9.

Country: Austria , Year: 1980

Estimation Method: Projection. Uncertainty (80%) bounds are between 13.2 and 60.3. Uncertainty (95%) bounds are between 23.3 and 68.

Country: Austria , Year: 1981

Estimation Method: Projection. Uncertainty (80%) bounds are between 15.4 and 60.9. Uncertainty (95%) bounds are between 25.3 and 68.

Country: Austria , Year: 1982

Estimation Method: Projection. Uncertainty (80%) bounds are between 17.4 and 61.2. Uncertainty (95%) bounds are between 27.3 and 68.1.

Country: Austria , Year: 1983

Estimation Method: Projection. Uncertainty (80%) bounds are between 20 and 61.5. Uncertainty (95%) bounds are between 29.5 and 68.2.

Country: Austria , Year: 1984

Estimation Method: Projection. Uncertainty (80%) bounds are between 22.3 and 61.8. Uncertainty (95%) bounds are between 31.5 and 68.1.

Country: Austria , Year: 1985

Estimation Method: Projection. Uncertainty (80%) bounds are between 24.9 and 62. Uncertainty (95%) bounds are between 33.6 and 68.1.

Country: Austria , Year: 1986

Estimation Method: Projection. Uncertainty (80%) bounds are between 27.6 and 62.2. Uncertainty (95%) bounds are between 35.9 and 68.

Country: Austria , Year: 1987

Estimation Method: Projection. Uncertainty (80%) bounds are between 30.4 and 62.4. Uncertainty (95%) bounds are between 37.8 and 67.5.

Country: Austria , Year: 1988

Estimation Method: Projection. Uncertainty (80%) bounds are between 32.6 and 62.5. Uncertainty (95%) bounds are between 39.8 and 67.3.

Country: Austria , Year: 1989

Estimation Method: Projection. Uncertainty (80%) bounds are between 35.1 and 62.4. Uncertainty (95%) bounds are between 41.5 and 66.7.

Country: Austria , Year: 1990

Estimation Method: Projection. Uncertainty (80%) bounds are between 37.1 and 62.2. Uncertainty (95%) bounds are between 43.3 and 66.3.

Country: Austria , Year: 1991

Estimation Method: Projection. Uncertainty (80%) bounds are between 39 and 62. Uncertainty (95%) bounds are between 44.6 and 65.8.

Country: Austria , Year: 1992

Estimation Method: Projection. Uncertainty (80%) bounds are between 40.2 and 61.6. Uncertainty (95%) bounds are between 45.3 and 65.2.

Country: Austria , Year: 1993

Estimation Method: Projection. Uncertainty (80%) bounds are between 41.4 and 61.2. Uncertainty (95%) bounds are between 45.8 and 64.8.

Country: Austria , Year: 1994

Estimation Method: Projection. Uncertainty (80%) bounds are between 42.3 and 60.7. Uncertainty (95%) bounds are between 46.3 and 64.2.

Country: Austria , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43.2 and 60.5. Uncertainty (95%) bounds are between 46.9 and 63.9.

Country: Austria , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43.9 and 60.5. Uncertainty (95%) bounds are between 47.4 and 64.

Country: Austria , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.3 and 61.4. Uncertainty (95%) bounds are between 47.9 and 64.8.

Country: Austria , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.7 and 62.4. Uncertainty (95%) bounds are between 48.6 and 65.9.

Country: Austria , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 45.4 and 63.5. Uncertainty (95%) bounds are between 49.3 and 67.1.

Country: Austria , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.2 and 64.6. Uncertainty (95%) bounds are between 50.2 and 68.1.

Country: Austria , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47 and 65.7. Uncertainty (95%) bounds are between 51.1 and 69.1.

Country: Austria , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48 and 66.5. Uncertainty (95%) bounds are between 52.1 and 69.9.

Country: Austria , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.1 and 67.4. Uncertainty (95%) bounds are between 53.2 and 70.6.

Country: Austria , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.4 and 68.1. Uncertainty (95%) bounds are between 54.3 and 71.2.

Country: Austria , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.7 and 68.8. Uncertainty (95%) bounds are between 55.6 and 71.8.

Country: Austria , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.3 and 69.4. Uncertainty (95%) bounds are between 56.9 and 72.3.

Country: Austria , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.8 and 69.9. Uncertainty (95%) bounds are between 58.3 and 72.6.

Country: Austria , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.5 and 70.4. Uncertainty (95%) bounds are between 59.7 and 72.8.

Country: Austria , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.8 and 71. Uncertainty (95%) bounds are between 60.8 and 73.3.

Country: Austria , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.8 and 71.5. Uncertainty (95%) bounds are between 61.7 and 73.7.

Country: Austria , Year: 2011

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.6 and 71.9. Uncertainty (95%) bounds are between 62.5 and 74.

Country: Austria , Year: 2012

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.1 and 72. Uncertainty (95%) bounds are between 62.8 and 74.1.

Country: Austria , Year: 2013

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.4 and 71.8. Uncertainty (95%) bounds are between 62.2 and 74.

Country: Austria , Year: 2014

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.5 and 71.7. Uncertainty (95%) bounds are between 61.5 and 74.

Country: Austria , Year: 2015

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58 and 71.7. Uncertainty (95%) bounds are between 61.1 and 74.2.

Country: Austria , Year: 2016

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.1 and 72.5. Uncertainty (95%) bounds are between 61.3 and 75.1.

Country: Austria , Year: 2017

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.6 and 73.3. Uncertainty (95%) bounds are between 62 and 76.1.

Country: Austria , Year: 2018

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.3 and 74.2. Uncertainty (95%) bounds are between 62.8 and 76.9.

Country: Austria , Year: 2019

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.9 and 74.9. Uncertainty (95%) bounds are between 63.4 and 77.7.

Country: Austria , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 59.9 and 75.7. Uncertainty (95%) bounds are between 63.4 and 78.6.

Country: Austria , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 59.2 and 76.5. Uncertainty (95%) bounds are between 63.1 and 79.5.

Country: Austria , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 58.3 and 77.2. Uncertainty (95%) bounds are between 62.8 and 80.3.

Country: Azerbaijan , Year: 1970

Estimation Method: Projection. Uncertainty (80%) bounds are between 1.6 and 26.2. Uncertainty (95%) bounds are between 3.2 and 36.5.

Country: Azerbaijan , Year: 1971

Estimation Method: Projection. Uncertainty (80%) bounds are between 1.7 and 26.3. Uncertainty (95%) bounds are between 3.4 and 36.3.

Country: Azerbaijan , Year: 1972

Estimation Method: Projection. Uncertainty (80%) bounds are between 1.8 and 26.3. Uncertainty (95%) bounds are between 3.6 and 36.3.

Country: Azerbaijan , Year: 1973

Estimation Method: Projection. Uncertainty (80%) bounds are between 2 and 26.1. Uncertainty (95%) bounds are between 3.9 and 36.1.

Country: Azerbaijan , Year: 1974

Estimation Method: Projection. Uncertainty (80%) bounds are between 2.2 and 26.1. Uncertainty (95%) bounds are between 4.1 and 35.9.

Country: Azerbaijan , Year: 1975

Estimation Method: Projection. Uncertainty (80%) bounds are between 2.4 and 26.2. Uncertainty (95%) bounds are between 4.3 and 35.5.

Country: Azerbaijan , Year: 1976

Estimation Method: Projection. Uncertainty (80%) bounds are between 2.6 and 26. Uncertainty (95%) bounds are between 4.6 and 35.1.

Country: Azerbaijan , Year: 1977

Estimation Method: Projection. Uncertainty (80%) bounds are between 2.7 and 25.9. Uncertainty (95%) bounds are between 4.8 and 35.2.

Country: Azerbaijan , Year: 1978

Estimation Method: Projection. Uncertainty (80%) bounds are between 2.9 and 25.9. Uncertainty (95%) bounds are between 5.1 and 34.9.

Country: Azerbaijan , Year: 1979

Estimation Method: Projection. Uncertainty (80%) bounds are between 3.1 and 25.8. Uncertainty (95%) bounds are between 5.4 and 34.7.

Country: Azerbaijan , Year: 1980

Estimation Method: Projection. Uncertainty (80%) bounds are between 3.3 and 25.8. Uncertainty (95%) bounds are between 5.6 and 34.2.

Country: Azerbaijan , Year: 1981

Estimation Method: Projection. Uncertainty (80%) bounds are between 3.6 and 25.6. Uncertainty (95%) bounds are between 6 and 33.9.

Country: Azerbaijan , Year: 1982

Estimation Method: Projection. Uncertainty (80%) bounds are between 3.9 and 25.5. Uncertainty (95%) bounds are between 6.2 and 33.4.

Country: Azerbaijan , Year: 1983

Estimation Method: Projection. Uncertainty (80%) bounds are between 4.2 and 25.6. Uncertainty (95%) bounds are between 6.6 and 33.2.

Country: Azerbaijan , Year: 1984

Estimation Method: Projection. Uncertainty (80%) bounds are between 4.4 and 25.4. Uncertainty (95%) bounds are between 6.9 and 32.6.

Country: Azerbaijan , Year: 1985

Estimation Method: Projection. Uncertainty (80%) bounds are between 4.7 and 25.2. Uncertainty (95%) bounds are between 7.1 and 32.3.

Country: Azerbaijan , Year: 1986

Estimation Method: Projection. Uncertainty (80%) bounds are between 5.1 and 25.2. Uncertainty (95%) bounds are between 7.5 and 31.9.

Country: Azerbaijan , Year: 1987

Estimation Method: Projection. Uncertainty (80%) bounds are between 5.4 and 24.9. Uncertainty (95%) bounds are between 7.8 and 31.5.

Country: Azerbaijan , Year: 1988

Estimation Method: Projection. Uncertainty (80%) bounds are between 5.8 and 24.7. Uncertainty (95%) bounds are between 8.2 and 30.9.

Country: Azerbaijan , Year: 1989

Estimation Method: Projection. Uncertainty (80%) bounds are between 6.1 and 24.5. Uncertainty (95%) bounds are between 8.5 and 30.2.

Country: Azerbaijan , Year: 1990

Estimation Method: Projection. Uncertainty (80%) bounds are between 6.5 and 24.2. Uncertainty (95%) bounds are between 8.8 and 29.7.

Country: Azerbaijan , Year: 1991

Estimation Method: Projection. Uncertainty (80%) bounds are between 6.7 and 23.9. Uncertainty (95%) bounds are between 9.2 and 29.1.

Country: Azerbaijan , Year: 1992

Estimation Method: Projection. Uncertainty (80%) bounds are between 7.2 and 23.7. Uncertainty (95%) bounds are between 9.5 and 28.8.

Country: Azerbaijan , Year: 1993

Estimation Method: Projection. Uncertainty (80%) bounds are between 7.6 and 23.6. Uncertainty (95%) bounds are between 9.9 and 28.5.

Country: Azerbaijan , Year: 1994

Estimation Method: Projection. Uncertainty (80%) bounds are between 8 and 23.2. Uncertainty (95%) bounds are between 10.2 and 28.1.

Country: Azerbaijan , Year: 1995

Estimation Method: Projection. Uncertainty (80%) bounds are between 8.5 and 22.8. Uncertainty (95%) bounds are between 10.6 and 27.2.

Country: Azerbaijan , Year: 1996

Estimation Method: Projection. Uncertainty (80%) bounds are between 8.9 and 22.4. Uncertainty (95%) bounds are between 11.1 and 26.3.

Country: Azerbaijan , Year: 1997

Estimation Method: Projection. Uncertainty (80%) bounds are between 9.6 and 21.8. Uncertainty (95%) bounds are between 11.5 and 25.4.

Country: Azerbaijan , Year: 1998

Estimation Method: Projection. Uncertainty (80%) bounds are between 10.1 and 21.3. Uncertainty (95%) bounds are between 12 and 24.5.

Country: Azerbaijan , Year: 1999

Estimation Method: Projection. Uncertainty (80%) bounds are between 10.8 and 20.6. Uncertainty (95%) bounds are between 12.5 and 23.2.

Country: Azerbaijan , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 11.4 and 19.6. Uncertainty (95%) bounds are between 12.9 and 21.7.

Country: Azerbaijan , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 11.1 and 18.8. Uncertainty (95%) bounds are between 12.5 and 20.8.

Country: Azerbaijan , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 10.8 and 18.7. Uncertainty (95%) bounds are between 12.1 and 20.8.

Country: Azerbaijan , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 10.6 and 18.6. Uncertainty (95%) bounds are between 12 and 20.5.

Country: Azerbaijan , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 10.7 and 18.1. Uncertainty (95%) bounds are between 12 and 19.8.

Country: Azerbaijan , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 11 and 17.3. Uncertainty (95%) bounds are between 12.2 and 18.8.

Country: Azerbaijan , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 11.9 and 16.1. Uncertainty (95%) bounds are between 12.8 and 17.1.

Country: Azerbaijan , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 11.1 and 17.2. Uncertainty (95%) bounds are between 12.2 and 18.6.

Country: Azerbaijan , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 10.7 and 17.8. Uncertainty (95%) bounds are between 12 and 19.5.

Country: Azerbaijan , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 10.7 and 18. Uncertainty (95%) bounds are between 12.1 and 19.9.

Country: Azerbaijan , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 11.1 and 18. Uncertainty (95%) bounds are between 12.4 and 19.7.

Country: Azerbaijan , Year: 2011

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 11.7 and 17.7. Uncertainty (95%) bounds are between 12.9 and 19.1.

Country: Azerbaijan , Year: 2012

Estimation Method: Projection. Uncertainty (80%) bounds are between 11.2 and 19.4. Uncertainty (95%) bounds are between 12.7 and 21.3.

Country: Azerbaijan , Year: 2013

Estimation Method: Projection. Uncertainty (80%) bounds are between 10.9 and 21.1. Uncertainty (95%) bounds are between 12.7 and 23.5.

Country: Azerbaijan , Year: 2014

Estimation Method: Projection. Uncertainty (80%) bounds are between 10.6 and 22.5. Uncertainty (95%) bounds are between 12.8 and 25.6.

Country: Azerbaijan , Year: 2015

Estimation Method: Projection. Uncertainty (80%) bounds are between 10.7 and 24.1. Uncertainty (95%) bounds are between 12.9 and 27.5.

Country: Azerbaijan , Year: 2016

Estimation Method: Projection. Uncertainty (80%) bounds are between 10.6 and 25.5. Uncertainty (95%) bounds are between 13.1 and 29.4.

Country: Azerbaijan , Year: 2017

Estimation Method: Projection. Uncertainty (80%) bounds are between 10.8 and 26.8. Uncertainty (95%) bounds are between 13.4 and 31.2.

Country: Azerbaijan , Year: 2018

Estimation Method: Projection. Uncertainty (80%) bounds are between 10.7 and 28.3. Uncertainty (95%) bounds are between 13.6 and 33.

Country: Azerbaijan , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 10.9 and 29.7. Uncertainty (95%) bounds are between 13.8 and 34.7.

Country: Azerbaijan , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 10.9 and 30.9. Uncertainty (95%) bounds are between 14.1 and 36.3.

Country: Azerbaijan , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 10.9 and 32.2. Uncertainty (95%) bounds are between 14.3 and 38.

Country: Azerbaijan , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 11.2 and 33.5. Uncertainty (95%) bounds are between 14.5 and 39.6.

Country: Belarus , Year: 1970

Estimation Method: Projection. Uncertainty (80%) bounds are between 5 and 40.5. Uncertainty (95%) bounds are between 9.3 and 50.3.

Country: Belarus , Year: 1971

Estimation Method: Projection. Uncertainty (80%) bounds are between 5.5 and 41.1. Uncertainty (95%) bounds are between 10 and 50.8.

Country: Belarus , Year: 1972

Estimation Method: Projection. Uncertainty (80%) bounds are between 6 and 41.6. Uncertainty (95%) bounds are between 10.7 and 51.1.

Country: Belarus , Year: 1973

Estimation Method: Projection. Uncertainty (80%) bounds are between 6.6 and 42.2. Uncertainty (95%) bounds are between 11.5 and 51.4.

Country: Belarus , Year: 1974

Estimation Method: Projection. Uncertainty (80%) bounds are between 7.2 and 42.9. Uncertainty (95%) bounds are between 12.2 and 51.9.

Country: Belarus , Year: 1975

Estimation Method: Projection. Uncertainty (80%) bounds are between 7.9 and 43.5. Uncertainty (95%) bounds are between 13.1 and 52.3.

Country: Belarus , Year: 1976

Estimation Method: Projection. Uncertainty (80%) bounds are between 8.6 and 43.9. Uncertainty (95%) bounds are between 13.9 and 52.7.

Country: Belarus , Year: 1977

Estimation Method: Projection. Uncertainty (80%) bounds are between 9.4 and 44.5. Uncertainty (95%) bounds are between 14.9 and 52.9.

Country: Belarus , Year: 1978

Estimation Method: Projection. Uncertainty (80%) bounds are between 10.3 and 44.9. Uncertainty (95%) bounds are between 15.8 and 53.2.

Country: Belarus , Year: 1979

Estimation Method: Projection. Uncertainty (80%) bounds are between 11.2 and 45.6. Uncertainty (95%) bounds are between 16.7 and 53.6.

Country: Belarus , Year: 1980

Estimation Method: Projection. Uncertainty (80%) bounds are between 12.1 and 46.1. Uncertainty (95%) bounds are between 17.8 and 53.7.

Country: Belarus , Year: 1981

Estimation Method: Projection. Uncertainty (80%) bounds are between 13.3 and 46.6. Uncertainty (95%) bounds are between 18.8 and 54.

Country: Belarus , Year: 1982

Estimation Method: Projection. Uncertainty (80%) bounds are between 14.4 and 46.9. Uncertainty (95%) bounds are between 20.1 and 54.

Country: Belarus , Year: 1983

Estimation Method: Projection. Uncertainty (80%) bounds are between 15.7 and 47.4. Uncertainty (95%) bounds are between 21.2 and 54.1.

Country: Belarus , Year: 1984

Estimation Method: Projection. Uncertainty (80%) bounds are between 16.9 and 47.7. Uncertainty (95%) bounds are between 22.5 and 54.3.

Country: Belarus , Year: 1985

Estimation Method: Projection. Uncertainty (80%) bounds are between 18.3 and 48.2. Uncertainty (95%) bounds are between 23.9 and 54.2.

Country: Belarus , Year: 1986

Estimation Method: Projection. Uncertainty (80%) bounds are between 19.6 and 48.5. Uncertainty (95%) bounds are between 25.3 and 54.2.

Country: Belarus , Year: 1987

Estimation Method: Projection. Uncertainty (80%) bounds are between 21.2 and 48.7. Uncertainty (95%) bounds are between 26.7 and 54.1.

Country: Belarus , Year: 1988

Estimation Method: Projection. Uncertainty (80%) bounds are between 22.9 and 48.8. Uncertainty (95%) bounds are between 28 and 53.9.

Country: Belarus , Year: 1989

Estimation Method: Projection. Uncertainty (80%) bounds are between 24.2 and 48.8. Uncertainty (95%) bounds are between 29.4 and 53.5.

Country: Belarus , Year: 1990

Estimation Method: Projection. Uncertainty (80%) bounds are between 25.8 and 48.5. Uncertainty (95%) bounds are between 30.6 and 52.9.

Country: Belarus , Year: 1991

Estimation Method: Projection. Uncertainty (80%) bounds are between 27 and 47.7. Uncertainty (95%) bounds are between 31.5 and 51.8.

Country: Belarus , Year: 1992

Estimation Method: Projection. Uncertainty (80%) bounds are between 28.2 and 46.9. Uncertainty (95%) bounds are between 32.3 and 50.5.

Country: Belarus , Year: 1993

Estimation Method: Projection. Uncertainty (80%) bounds are between 29.4 and 45.9. Uncertainty (95%) bounds are between 33.1 and 49.1.

Country: Belarus , Year: 1994

Estimation Method: Projection. Uncertainty (80%) bounds are between 30.7 and 45. Uncertainty (95%) bounds are between 34 and 47.6.

Country: Belarus , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 32.1 and 44.5. Uncertainty (95%) bounds are between 35.1 and 46.7.

Country: Belarus , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 32.4 and 45.7. Uncertainty (95%) bounds are between 35.4 and 48.1.

Country: Belarus , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 32.7 and 47.3. Uncertainty (95%) bounds are between 36 and 50.2.

Country: Belarus , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 33.3 and 49.1. Uncertainty (95%) bounds are between 36.8 and 52.1.

Country: Belarus , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.2 and 50.8. Uncertainty (95%) bounds are between 37.7 and 54.

Country: Belarus , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 35.4 and 52.4. Uncertainty (95%) bounds are between 39 and 55.7.

Country: Belarus , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 36.6 and 53.9. Uncertainty (95%) bounds are between 40.3 and 57.2.

Country: Belarus , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.2 and 55.2. Uncertainty (95%) bounds are between 41.8 and 58.5.

Country: Belarus , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 39.6 and 56.4. Uncertainty (95%) bounds are between 43.3 and 59.5.

Country: Belarus , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 41.3 and 57.4. Uncertainty (95%) bounds are between 44.8 and 60.4.

Country: Belarus , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42.9 and 58.1. Uncertainty (95%) bounds are between 46.1 and 61.

Country: Belarus , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43 and 58.8. Uncertainty (95%) bounds are between 46.4 and 61.8.

Country: Belarus , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42.8 and 59.3. Uncertainty (95%) bounds are between 46.5 and 62.2.

Country: Belarus , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43.2 and 59.4. Uncertainty (95%) bounds are between 46.6 and 62.6.

Country: Belarus , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43.3 and 59.5. Uncertainty (95%) bounds are between 46.8 and 62.6.

Country: Belarus , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43.7 and 59.4. Uncertainty (95%) bounds are between 47.1 and 62.4.

Country: Belarus , Year: 2011

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.2 and 59.1. Uncertainty (95%) bounds are between 47.4 and 62.2.

Country: Belarus , Year: 2012

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.7 and 58.9. Uncertainty (95%) bounds are between 47.7 and 61.7.

Country: Belarus , Year: 2013

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.4 and 58.9. Uncertainty (95%) bounds are between 47.5 and 61.8.

Country: Belarus , Year: 2014

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.2 and 58.8. Uncertainty (95%) bounds are between 47.3 and 61.8.

Country: Belarus , Year: 2015

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.2 and 58.7. Uncertainty (95%) bounds are between 47.4 and 61.5.

Country: Belarus , Year: 2016

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.4 and 58.4. Uncertainty (95%) bounds are between 47.3 and 61.1.

Country: Belarus , Year: 2017

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.4 and 58. Uncertainty (95%) bounds are between 47.4 and 60.6.

Country: Belarus , Year: 2018

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43.6 and 57.8. Uncertainty (95%) bounds are between 46.7 and 60.6.

Country: Belarus , Year: 2019

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42.7 and 57.8. Uncertainty (95%) bounds are between 46 and 60.8.

Country: Belarus , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 41.8 and 58.5. Uncertainty (95%) bounds are between 45.3 and 61.8.

Country: Belarus , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 40.8 and 59.4. Uncertainty (95%) bounds are between 44.8 and 63.

Country: Belarus , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 40 and 60.3. Uncertainty (95%) bounds are between 44.3 and 64.2.

Country: Belgium , Year: 1970

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 9 and 24.5. Uncertainty (95%) bounds are between 11.4 and 29.3.

Country: Belgium , Year: 1971

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 11.4 and 29.5. Uncertainty (95%) bounds are between 14.4 and 34.4.

Country: Belgium , Year: 1972

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 14.7 and 34.8. Uncertainty (95%) bounds are between 18 and 39.8.

Country: Belgium , Year: 1973

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 18.5 and 39.9. Uncertainty (95%) bounds are between 22.3 and 45.1.

Country: Belgium , Year: 1974

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 23.1 and 45. Uncertainty (95%) bounds are between 27.3 and 50.

Country: Belgium , Year: 1975

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 28.4 and 49.7. Uncertainty (95%) bounds are between 32.8 and 54.3.

Country: Belgium , Year: 1976

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 30.5 and 53.4. Uncertainty (95%) bounds are between 35.3 and 57.9.

Country: Belgium , Year: 1977

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 32.7 and 56.3. Uncertainty (95%) bounds are between 37.8 and 60.8.

Country: Belgium , Year: 1978

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.9 and 58.9. Uncertainty (95%) bounds are between 40.1 and 63.3.

Country: Belgium , Year: 1979

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.3 and 60.9. Uncertainty (95%) bounds are between 42.5 and 65.2.

Country: Belgium , Year: 1980

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 39.6 and 62.7. Uncertainty (95%) bounds are between 44.9 and 66.7.

Country: Belgium , Year: 1981

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42 and 64. Uncertainty (95%) bounds are between 47.1 and 67.6.

Country: Belgium , Year: 1982

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.5 and 65.1. Uncertainty (95%) bounds are between 49.3 and 68.6.

Country: Belgium , Year: 1983

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.7 and 66.6. Uncertainty (95%) bounds are between 51.2 and 69.9.

Country: Belgium , Year: 1984

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.2 and 67.8. Uncertainty (95%) bounds are between 52.8 and 71.2.

Country: Belgium , Year: 1985

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.1 and 68.9. Uncertainty (95%) bounds are between 54.3 and 72.2.

Country: Belgium , Year: 1986

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.5 and 69.7. Uncertainty (95%) bounds are between 55.7 and 72.8.

Country: Belgium , Year: 1987

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.8 and 70.2. Uncertainty (95%) bounds are between 56.8 and 73.3.

Country: Belgium , Year: 1988

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.9 and 70.4. Uncertainty (95%) bounds are between 57.6 and 73.3.

Country: Belgium , Year: 1989

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.8 and 70.4. Uncertainty (95%) bounds are between 58.3 and 73.2.

Country: Belgium , Year: 1990

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.4 and 70.2. Uncertainty (95%) bounds are between 58.8 and 72.8.

Country: Belgium , Year: 1991

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.6 and 69.8. Uncertainty (95%) bounds are between 58.9 and 72.3.

Country: Belgium , Year: 1992

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.3 and 69.1. Uncertainty (95%) bounds are between 58.5 and 71.6.

Country: Belgium , Year: 1993

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.6 and 68.2. Uncertainty (95%) bounds are between 57.7 and 70.7.

Country: Belgium , Year: 1994

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.9 and 67. Uncertainty (95%) bounds are between 56.8 and 69.5.

Country: Belgium , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.3 and 65.6. Uncertainty (95%) bounds are between 55.9 and 68.

Country: Belgium , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.7 and 64. Uncertainty (95%) bounds are between 55.1 and 66.4.

Country: Belgium , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.3 and 63. Uncertainty (95%) bounds are between 54.6 and 65.4.

Country: Belgium , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52 and 63.1. Uncertainty (95%) bounds are between 54.3 and 65.7.

Country: Belgium , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.8 and 63.7. Uncertainty (95%) bounds are between 54.3 and 66.3.

Country: Belgium , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.9 and 64.5. Uncertainty (95%) bounds are between 54.6 and 67.

Country: Belgium , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.1 and 65.1. Uncertainty (95%) bounds are between 54.9 and 67.8.

Country: Belgium , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.2 and 65.6. Uncertainty (95%) bounds are between 55.2 and 68.2.

Country: Belgium , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.6 and 66. Uncertainty (95%) bounds are between 55.6 and 68.5.

Country: Belgium , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.4 and 66.4. Uncertainty (95%) bounds are between 56.2 and 68.8.

Country: Belgium , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.1 and 67.1. Uncertainty (95%) bounds are between 56.9 and 69.6.

Country: Belgium , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.9 and 68.1. Uncertainty (95%) bounds are between 57.8 and 70.6.

Country: Belgium , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.9 and 68.9. Uncertainty (95%) bounds are between 58.8 and 71.4.

Country: Belgium , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.9 and 69.6. Uncertainty (95%) bounds are between 59.7 and 71.9.

Country: Belgium , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.9 and 70.2. Uncertainty (95%) bounds are between 60.7 and 72.5.

Country: Belgium , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59 and 70.5. Uncertainty (95%) bounds are between 61.5 and 72.7.

Country: Belgium , Year: 2011

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60 and 70.6. Uncertainty (95%) bounds are between 62.4 and 72.8.

Country: Belgium , Year: 2012

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.1 and 70.6. Uncertainty (95%) bounds are between 63.1 and 72.5.

Country: Belgium , Year: 2013

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.8 and 70.4. Uncertainty (95%) bounds are between 63.7 and 72.3.

Country: Belgium , Year: 2014

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.5 and 70.5. Uncertainty (95%) bounds are between 63.5 and 72.3.

Country: Belgium , Year: 2015

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.1 and 70.4. Uncertainty (95%) bounds are between 63.2 and 72.3.

Country: Belgium , Year: 2016

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61 and 70.2. Uncertainty (95%) bounds are between 63 and 71.9.

Country: Belgium , Year: 2017

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.2 and 69.8. Uncertainty (95%) bounds are between 63 and 71.5.

Country: Belgium , Year: 2018

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.1 and 69.5. Uncertainty (95%) bounds are between 63 and 71.2.

Country: Belgium , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 59.8 and 70.2. Uncertainty (95%) bounds are between 62.2 and 72.2.

Country: Belgium , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 58.4 and 71.1. Uncertainty (95%) bounds are between 61.1 and 73.5.

Country: Belgium , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 56.7 and 71.9. Uncertainty (95%) bounds are between 60.2 and 74.8.

Country: Belgium , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 55.3 and 72.7. Uncertainty (95%) bounds are between 59.4 and 75.9.

Country: Bosnia and Herzegovina , Year: 1970

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 1.6 and 5. Uncertainty (95%) bounds are between 2 and 6.2.

Country: Bosnia and Herzegovina , Year: 1971

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 1.6 and 5.4. Uncertainty (95%) bounds are between 2.1 and 6.9.

Country: Bosnia and Herzegovina , Year: 1972

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 1.7 and 5.9. Uncertainty (95%) bounds are between 2.2 and 7.6.

Country: Bosnia and Herzegovina , Year: 1973

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 1.7 and 6.4. Uncertainty (95%) bounds are between 2.3 and 8.3.

Country: Bosnia and Herzegovina , Year: 1974

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 1.8 and 7. Uncertainty (95%) bounds are between 2.4 and 9.1.

Country: Bosnia and Herzegovina , Year: 1975

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 1.9 and 7.6. Uncertainty (95%) bounds are between 2.5 and 9.9.

Country: Bosnia and Herzegovina , Year: 1976

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 1.9 and 8.2. Uncertainty (95%) bounds are between 2.7 and 10.7.

Country: Bosnia and Herzegovina , Year: 1977

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 2 and 8.7. Uncertainty (95%) bounds are between 2.8 and 11.5.

Country: Bosnia and Herzegovina , Year: 1978

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 2.1 and 9.4. Uncertainty (95%) bounds are between 3 and 12.3.

Country: Bosnia and Herzegovina , Year: 1979

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 2.3 and 10. Uncertainty (95%) bounds are between 3.1 and 13.2.

Country: Bosnia and Herzegovina , Year: 1980

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 2.4 and 10.7. Uncertainty (95%) bounds are between 3.3 and 14.2.

Country: Bosnia and Herzegovina , Year: 1981

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 2.5 and 11.4. Uncertainty (95%) bounds are between 3.5 and 15.1.

Country: Bosnia and Herzegovina , Year: 1982

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 2.7 and 12. Uncertainty (95%) bounds are between 3.8 and 16.

Country: Bosnia and Herzegovina , Year: 1983

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 2.9 and 12.6. Uncertainty (95%) bounds are between 4 and 16.7.

Country: Bosnia and Herzegovina , Year: 1984

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 3 and 13.4. Uncertainty (95%) bounds are between 4.3 and 17.6.

Country: Bosnia and Herzegovina , Year: 1985

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 3.2 and 14. Uncertainty (95%) bounds are between 4.6 and 18.4.

Country: Bosnia and Herzegovina , Year: 1986

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 3.4 and 14.8. Uncertainty (95%) bounds are between 4.9 and 19.2.

Country: Bosnia and Herzegovina , Year: 1987

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 3.7 and 15.4. Uncertainty (95%) bounds are between 5.1 and 19.8.

Country: Bosnia and Herzegovina , Year: 1988

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 3.9 and 16.1. Uncertainty (95%) bounds are between 5.5 and 20.6.

Country: Bosnia and Herzegovina , Year: 1989

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 4.2 and 16.8. Uncertainty (95%) bounds are between 5.8 and 21.2.

Country: Bosnia and Herzegovina , Year: 1990

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 4.5 and 17.3. Uncertainty (95%) bounds are between 6.2 and 21.8.

Country: Bosnia and Herzegovina , Year: 1991

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 4.8 and 17.8. Uncertainty (95%) bounds are between 6.5 and 22.2.

Country: Bosnia and Herzegovina , Year: 1992

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 5.1 and 17.9. Uncertainty (95%) bounds are between 6.9 and 22.4.

Country: Bosnia and Herzegovina , Year: 1993

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 5.5 and 18.2. Uncertainty (95%) bounds are between 7.2 and 22.4.

Country: Bosnia and Herzegovina , Year: 1994

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 5.8 and 18.3. Uncertainty (95%) bounds are between 7.6 and 22.5.

Country: Bosnia and Herzegovina , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 6.2 and 18.4. Uncertainty (95%) bounds are between 8 and 22.1.

Country: Bosnia and Herzegovina , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 6.6 and 18.4. Uncertainty (95%) bounds are between 8.4 and 22.

Country: Bosnia and Herzegovina , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 7.1 and 18.4. Uncertainty (95%) bounds are between 8.9 and 21.8.

Country: Bosnia and Herzegovina , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 7.7 and 18.3. Uncertainty (95%) bounds are between 9.4 and 21.4.

Country: Bosnia and Herzegovina , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 8.3 and 18.1. Uncertainty (95%) bounds are between 9.9 and 21.

Country: Bosnia and Herzegovina , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 9.1 and 17.8. Uncertainty (95%) bounds are between 10.6 and 20.2.

Country: Bosnia and Herzegovina , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 8.8 and 17.8. Uncertainty (95%) bounds are between 10.3 and 20.5.

Country: Bosnia and Herzegovina , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 8.5 and 17.7. Uncertainty (95%) bounds are between 10 and 20.3.

Country: Bosnia and Herzegovina , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 8.2 and 17.4. Uncertainty (95%) bounds are between 9.7 and 19.9.

Country: Bosnia and Herzegovina , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 8.1 and 16.9. Uncertainty (95%) bounds are between 9.6 and 19.5.

Country: Bosnia and Herzegovina , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 8.1 and 16.4. Uncertainty (95%) bounds are between 9.5 and 18.7.

Country: Bosnia and Herzegovina , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 8.3 and 15.9. Uncertainty (95%) bounds are between 9.5 and 18.1.

Country: Bosnia and Herzegovina , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 8.1 and 16.4. Uncertainty (95%) bounds are between 9.5 and 18.7.

Country: Bosnia and Herzegovina , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 8.1 and 16.9. Uncertainty (95%) bounds are between 9.5 and 19.2.

Country: Bosnia and Herzegovina , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 8.2 and 17.2. Uncertainty (95%) bounds are between 9.6 and 19.7.

Country: Bosnia and Herzegovina , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 8.3 and 17.4. Uncertainty (95%) bounds are between 9.8 and 20.1.

Country: Bosnia and Herzegovina , Year: 2011

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 8.7 and 17.6. Uncertainty (95%) bounds are between 10.1 and 20.3.

Country: Bosnia and Herzegovina , Year: 2012

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 8.8 and 18.2. Uncertainty (95%) bounds are between 10.3 and 21.1.

Country: Bosnia and Herzegovina , Year: 2013

Estimation Method: Projection. Uncertainty (80%) bounds are between 8.7 and 19.6. Uncertainty (95%) bounds are between 10.5 and 22.9.

Country: Bosnia and Herzegovina , Year: 2014

Estimation Method: Projection. Uncertainty (80%) bounds are between 8.7 and 21. Uncertainty (95%) bounds are between 10.6 and 24.7.

Country: Bosnia and Herzegovina , Year: 2015

Estimation Method: Projection. Uncertainty (80%) bounds are between 8.7 and 22.3. Uncertainty (95%) bounds are between 10.8 and 26.3.

Country: Bosnia and Herzegovina , Year: 2016

Estimation Method: Projection. Uncertainty (80%) bounds are between 8.8 and 23.7. Uncertainty (95%) bounds are between 11 and 28.2.

Country: Bosnia and Herzegovina , Year: 2017

Estimation Method: Projection. Uncertainty (80%) bounds are between 8.7 and 25.1. Uncertainty (95%) bounds are between 11.3 and 29.8.

Country: Bosnia and Herzegovina , Year: 2018

Estimation Method: Projection. Uncertainty (80%) bounds are between 8.8 and 26.5. Uncertainty (95%) bounds are between 11.5 and 31.7.

Country: Bosnia and Herzegovina , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 8.9 and 27.9. Uncertainty (95%) bounds are between 11.8 and 33.6.

Country: Bosnia and Herzegovina , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 9.1 and 29.3. Uncertainty (95%) bounds are between 12 and 35.4.

Country: Bosnia and Herzegovina , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 9.3 and 30.5. Uncertainty (95%) bounds are between 12.3 and 37.

Country: Bosnia and Herzegovina , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 9.4 and 31.8. Uncertainty (95%) bounds are between 12.7 and 38.7.

Country: Bulgaria , Year: 1970

Estimation Method: Projection. Uncertainty (80%) bounds are between 1.5 and 9.1. Uncertainty (95%) bounds are between 2.2 and 12.3.

Country: Bulgaria , Year: 1971

Estimation Method: Projection. Uncertainty (80%) bounds are between 1.7 and 9.1. Uncertainty (95%) bounds are between 2.4 and 12.2.

Country: Bulgaria , Year: 1972

Estimation Method: Projection. Uncertainty (80%) bounds are between 1.9 and 9.2. Uncertainty (95%) bounds are between 2.7 and 12.2.

Country: Bulgaria , Year: 1973

Estimation Method: Projection. Uncertainty (80%) bounds are between 2.1 and 9.2. Uncertainty (95%) bounds are between 2.9 and 12.

Country: Bulgaria , Year: 1974

Estimation Method: Projection. Uncertainty (80%) bounds are between 2.4 and 9.2. Uncertainty (95%) bounds are between 3.3 and 11.8.

Country: Bulgaria , Year: 1975

Estimation Method: Projection. Uncertainty (80%) bounds are between 2.7 and 9.2. Uncertainty (95%) bounds are between 3.6 and 11.6.

Country: Bulgaria , Year: 1976

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 3.1 and 9.2. Uncertainty (95%) bounds are between 4 and 11.4.

Country: Bulgaria , Year: 1977

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 3.4 and 10.5. Uncertainty (95%) bounds are between 4.3 and 12.9.

Country: Bulgaria , Year: 1978

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 3.7 and 11.9. Uncertainty (95%) bounds are between 4.8 and 14.7.

Country: Bulgaria , Year: 1979

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 4 and 13.3. Uncertainty (95%) bounds are between 5.2 and 16.4.

Country: Bulgaria , Year: 1980

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 4.3 and 14.8. Uncertainty (95%) bounds are between 5.7 and 18.4.

Country: Bulgaria , Year: 1981

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 4.8 and 16.4. Uncertainty (95%) bounds are between 6.4 and 20.4.

Country: Bulgaria , Year: 1982

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 5.3 and 18.1. Uncertainty (95%) bounds are between 7 and 22.1.

Country: Bulgaria , Year: 1983

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 5.8 and 19.8. Uncertainty (95%) bounds are between 7.7 and 24.6.

Country: Bulgaria , Year: 1984

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 6.5 and 21.7. Uncertainty (95%) bounds are between 8.6 and 26.6.

Country: Bulgaria , Year: 1985

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 7.4 and 23.6. Uncertainty (95%) bounds are between 9.6 and 28.7.

Country: Bulgaria , Year: 1986

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 8.3 and 25.5. Uncertainty (95%) bounds are between 10.7 and 30.7.

Country: Bulgaria , Year: 1987

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 9.2 and 27.4. Uncertainty (95%) bounds are between 11.9 and 32.9.

Country: Bulgaria , Year: 1988

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 10.3 and 29.4. Uncertainty (95%) bounds are between 13.3 and 34.9.

Country: Bulgaria , Year: 1989

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 11.9 and 31.4. Uncertainty (95%) bounds are between 14.9 and 36.7.

Country: Bulgaria , Year: 1990

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 13.4 and 33.5. Uncertainty (95%) bounds are between 16.6 and 39.

Country: Bulgaria , Year: 1991

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 15.1 and 35.6. Uncertainty (95%) bounds are between 18.6 and 41.1.

Country: Bulgaria , Year: 1992

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 17.2 and 37.9. Uncertainty (95%) bounds are between 20.8 and 42.9.

Country: Bulgaria , Year: 1993

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 19.6 and 40. Uncertainty (95%) bounds are between 23.4 and 45.

Country: Bulgaria , Year: 1994

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 22.5 and 41.9. Uncertainty (95%) bounds are between 26.2 and 46.4.

Country: Bulgaria , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 25.7 and 43.4. Uncertainty (95%) bounds are between 29.2 and 47.3.

Country: Bulgaria , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 26 and 43.1. Uncertainty (95%) bounds are between 29.3 and 47.

Country: Bulgaria , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 26.2 and 42.4. Uncertainty (95%) bounds are between 29.4 and 46.

Country: Bulgaria , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 26.3 and 42.3. Uncertainty (95%) bounds are between 29.5 and 45.8.

Country: Bulgaria , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 25.7 and 43.1. Uncertainty (95%) bounds are between 29.3 and 46.8.

Country: Bulgaria , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 25.7 and 43.6. Uncertainty (95%) bounds are between 29.2 and 47.5.

Country: Bulgaria , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 25.8 and 43.9. Uncertainty (95%) bounds are between 29.4 and 47.8.

Country: Bulgaria , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 26.3 and 44. Uncertainty (95%) bounds are between 29.8 and 47.8.

Country: Bulgaria , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 26.7 and 43.9. Uncertainty (95%) bounds are between 30.3 and 47.3.

Country: Bulgaria , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 27.6 and 43.6. Uncertainty (95%) bounds are between 31.1 and 47.

Country: Bulgaria , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 28.2 and 45.5. Uncertainty (95%) bounds are between 31.9 and 49.

Country: Bulgaria , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 29.5 and 47. Uncertainty (95%) bounds are between 33.1 and 50.7.

Country: Bulgaria , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 31 and 48.4. Uncertainty (95%) bounds are between 34.5 and 52.2.

Country: Bulgaria , Year: 2008

Estimation Method: Projection. Uncertainty (80%) bounds are between 30.7 and 50.8. Uncertainty (95%) bounds are between 34.7 and 55.

Country: Bulgaria , Year: 2009

Estimation Method: Projection. Uncertainty (80%) bounds are between 30.5 and 53. Uncertainty (95%) bounds are between 35.1 and 57.6.

Country: Bulgaria , Year: 2010

Estimation Method: Projection. Uncertainty (80%) bounds are between 30.3 and 55.1. Uncertainty (95%) bounds are between 35.5 and 60.1.

Country: Bulgaria , Year: 2011

Estimation Method: Projection. Uncertainty (80%) bounds are between 30.3 and 57.1. Uncertainty (95%) bounds are between 36.1 and 62.1.

Country: Bulgaria , Year: 2012

Estimation Method: Projection. Uncertainty (80%) bounds are between 30.8 and 59. Uncertainty (95%) bounds are between 36.4 and 64.4.

Country: Bulgaria , Year: 2013

Estimation Method: Projection. Uncertainty (80%) bounds are between 30.8 and 60.7. Uncertainty (95%) bounds are between 37 and 66.4.

Country: Bulgaria , Year: 2014

Estimation Method: Projection. Uncertainty (80%) bounds are between 31.2 and 62.3. Uncertainty (95%) bounds are between 37.5 and 68.1.

Country: Bulgaria , Year: 2015

Estimation Method: Projection. Uncertainty (80%) bounds are between 31.5 and 64. Uncertainty (95%) bounds are between 38.2 and 69.8.

Country: Bulgaria , Year: 2016

Estimation Method: Projection. Uncertainty (80%) bounds are between 31.7 and 65.5. Uncertainty (95%) bounds are between 38.6 and 71.5.

Country: Bulgaria , Year: 2017

Estimation Method: Projection. Uncertainty (80%) bounds are between 31.9 and 66.8. Uncertainty (95%) bounds are between 39.4 and 72.8.

Country: Bulgaria , Year: 2018

Estimation Method: Projection. Uncertainty (80%) bounds are between 32.4 and 68. Uncertainty (95%) bounds are between 39.9 and 74.

Country: Bulgaria , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 32.9 and 69.2. Uncertainty (95%) bounds are between 40.4 and 75.3.

Country: Bulgaria , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 33 and 70.3. Uncertainty (95%) bounds are between 41 and 76.5.

Country: Bulgaria , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 33.2 and 71.5. Uncertainty (95%) bounds are between 41.6 and 77.6.

Country: Bulgaria , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 33.5 and 72.5. Uncertainty (95%) bounds are between 42.2 and 78.6.

Country: Canada , Year: 1970

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.2 and 77.5. Uncertainty (95%) bounds are between 48.2 and 82.5.

Country: Canada , Year: 1971

Estimation Method: Projection. Uncertainty (80%) bounds are between 38.3 and 77.4. Uncertainty (95%) bounds are between 49.6 and 82.1.

Country: Canada , Year: 1972

Estimation Method: Projection. Uncertainty (80%) bounds are between 40.4 and 77.2. Uncertainty (95%) bounds are between 50.9 and 81.9.

Country: Canada , Year: 1973

Estimation Method: Projection. Uncertainty (80%) bounds are between 42.7 and 77.1. Uncertainty (95%) bounds are between 52.2 and 81.6.

Country: Canada , Year: 1974

Estimation Method: Projection. Uncertainty (80%) bounds are between 44.8 and 76.9. Uncertainty (95%) bounds are between 53.5 and 81.2.

Country: Canada , Year: 1975

Estimation Method: Projection. Uncertainty (80%) bounds are between 46.9 and 76.7. Uncertainty (95%) bounds are between 54.8 and 80.8.

Country: Canada , Year: 1976

Estimation Method: Projection. Uncertainty (80%) bounds are between 48.9 and 76.4. Uncertainty (95%) bounds are between 56.1 and 80.3.

Country: Canada , Year: 1977

Estimation Method: Projection. Uncertainty (80%) bounds are between 50.9 and 76.1. Uncertainty (95%) bounds are between 57.4 and 79.7.

Country: Canada , Year: 1978

Estimation Method: Projection. Uncertainty (80%) bounds are between 52.8 and 75.8. Uncertainty (95%) bounds are between 58.7 and 79.2.

Country: Canada , Year: 1979

Estimation Method: Projection. Uncertainty (80%) bounds are between 54.8 and 75.4. Uncertainty (95%) bounds are between 59.9 and 78.7.

Country: Canada , Year: 1980

Estimation Method: Projection. Uncertainty (80%) bounds are between 56.8 and 74.9. Uncertainty (95%) bounds are between 61.3 and 77.9.

Country: Canada , Year: 1981

Estimation Method: Projection. Uncertainty (80%) bounds are between 58.7 and 74.4. Uncertainty (95%) bounds are between 62.6 and 77.

Country: Canada , Year: 1982

Estimation Method: Projection. Uncertainty (80%) bounds are between 60.7 and 73.8. Uncertainty (95%) bounds are between 63.9 and 76.1.

Country: Canada , Year: 1983

Estimation Method: Projection. Uncertainty (80%) bounds are between 62.5 and 73.3. Uncertainty (95%) bounds are between 65.1 and 75.2.

Country: Canada , Year: 1984

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.8 and 73. Uncertainty (95%) bounds are between 66.1 and 74.6.

Country: Canada , Year: 1985

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.9 and 73.3. Uncertainty (95%) bounds are between 66.1 and 75.

Country: Canada , Year: 1986

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.5 and 73.9. Uncertainty (95%) bounds are between 65.9 and 75.6.

Country: Canada , Year: 1987

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.2 and 74.3. Uncertainty (95%) bounds are between 65.7 and 76.3.

Country: Canada , Year: 1988

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.1 and 74.7. Uncertainty (95%) bounds are between 65.8 and 76.6.

Country: Canada , Year: 1989

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.3 and 74.9. Uncertainty (95%) bounds are between 65.9 and 76.9.

Country: Canada , Year: 1990

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.6 and 75.1. Uncertainty (95%) bounds are between 66.2 and 77.1.

Country: Canada , Year: 1991

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.9 and 75.5. Uncertainty (95%) bounds are between 66.5 and 77.6.

Country: Canada , Year: 1992

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.3 and 76. Uncertainty (95%) bounds are between 67 and 78.

Country: Canada , Year: 1993

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.9 and 76.3. Uncertainty (95%) bounds are between 67.5 and 78.4.

Country: Canada , Year: 1994

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.8 and 76.6. Uncertainty (95%) bounds are between 68.2 and 78.6.

Country: Canada , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.6 and 76.9. Uncertainty (95%) bounds are between 68.9 and 78.7.

Country: Canada , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67 and 77.2. Uncertainty (95%) bounds are between 69.4 and 79.

Country: Canada , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.3 and 77.5. Uncertainty (95%) bounds are between 69.7 and 79.3.

Country: Canada , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.6 and 77.6. Uncertainty (95%) bounds are between 70 and 79.4.

Country: Canada , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.4 and 77.6. Uncertainty (95%) bounds are between 69.9 and 79.4.

Country: Canada , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.2 and 77.5. Uncertainty (95%) bounds are between 69.8 and 79.2.

Country: Canada , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.2 and 77.5. Uncertainty (95%) bounds are between 69.9 and 79.1.

Country: Canada , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.6 and 77.7. Uncertainty (95%) bounds are between 70.2 and 79.3.

Country: Canada , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.3 and 78.6. Uncertainty (95%) bounds are between 71.1 and 80.2.

Country: Canada , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.4 and 79.7. Uncertainty (95%) bounds are between 72.1 and 81.4.

Country: Canada , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 70.4 and 80.9. Uncertainty (95%) bounds are between 73.3 and 82.5.

Country: Canada , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 71.2 and 81.8. Uncertainty (95%) bounds are between 74.2 and 83.5.

Country: Canada , Year: 2007

Estimation Method: Projection. Uncertainty (80%) bounds are between 71.1 and 82.6. Uncertainty (95%) bounds are between 74.3 and 84.4.

Country: Canada , Year: 2008

Estimation Method: Projection. Uncertainty (80%) bounds are between 70.6 and 83.3. Uncertainty (95%) bounds are between 74 and 85.2.

Country: Canada , Year: 2009

Estimation Method: Projection. Uncertainty (80%) bounds are between 70 and 83.9. Uncertainty (95%) bounds are between 73.6 and 85.9.

Country: Canada , Year: 2010

Estimation Method: Projection. Uncertainty (80%) bounds are between 69.1 and 84.4. Uncertainty (95%) bounds are between 73.2 and 86.6.

Country: Canada , Year: 2011

Estimation Method: Projection. Uncertainty (80%) bounds are between 68.3 and 84.9. Uncertainty (95%) bounds are between 72.7 and 87.2.

Country: Canada , Year: 2012

Estimation Method: Projection. Uncertainty (80%) bounds are between 67.4 and 85.3. Uncertainty (95%) bounds are between 72.1 and 87.6.

Country: Canada , Year: 2013

Estimation Method: Projection. Uncertainty (80%) bounds are between 66.5 and 85.7. Uncertainty (95%) bounds are between 71.6 and 88.2.

Country: Canada , Year: 2014

Estimation Method: Projection. Uncertainty (80%) bounds are between 65.8 and 86. Uncertainty (95%) bounds are between 71.2 and 88.6.

Country: Canada , Year: 2015

Estimation Method: Projection. Uncertainty (80%) bounds are between 65 and 86.3. Uncertainty (95%) bounds are between 70.7 and 89.

Country: Canada , Year: 2016

Estimation Method: Projection. Uncertainty (80%) bounds are between 64.5 and 86.6. Uncertainty (95%) bounds are between 70.3 and 89.4.

Country: Canada , Year: 2017

Estimation Method: Projection. Uncertainty (80%) bounds are between 63.7 and 86.9. Uncertainty (95%) bounds are between 69.8 and 89.7.

Country: Canada , Year: 2018

Estimation Method: Projection. Uncertainty (80%) bounds are between 63 and 87.1. Uncertainty (95%) bounds are between 69.5 and 90.

Country: Canada , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 62.3 and 87.3. Uncertainty (95%) bounds are between 69.2 and 90.3.

Country: Canada , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 61.8 and 87.6. Uncertainty (95%) bounds are between 68.9 and 90.6.

Country: Canada , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 61.2 and 87.8. Uncertainty (95%) bounds are between 68.5 and 90.8.

Country: Canada , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 60.7 and 88. Uncertainty (95%) bounds are between 68.1 and 91.

Country: China, Hong Kong SAR , Year: 1970

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 32.5 and 45.2. Uncertainty (95%) bounds are between 35.1 and 47.8.

Country: China, Hong Kong SAR , Year: 1971

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 35.5 and 46.7. Uncertainty (95%) bounds are between 37.9 and 49.1.

Country: China, Hong Kong SAR , Year: 1972

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.6 and 48.6. Uncertainty (95%) bounds are between 40.8 and 50.8.

Country: China, Hong Kong SAR , Year: 1973

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 40.6 and 52. Uncertainty (95%) bounds are between 43.1 and 54.2.

Country: China, Hong Kong SAR , Year: 1974

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42.7 and 55.6. Uncertainty (95%) bounds are between 45.6 and 57.9.

Country: China, Hong Kong SAR , Year: 1975

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.7 and 58.9. Uncertainty (95%) bounds are between 48.3 and 61.3.

Country: China, Hong Kong SAR , Year: 1976

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.8 and 61.7. Uncertainty (95%) bounds are between 50.6 and 64.1.

Country: China, Hong Kong SAR , Year: 1977

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.6 and 64.1. Uncertainty (95%) bounds are between 52.6 and 66.4.

Country: China, Hong Kong SAR , Year: 1978

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.6 and 65.9. Uncertainty (95%) bounds are between 54 and 68.3.

Country: China, Hong Kong SAR , Year: 1979

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.8 and 67.3. Uncertainty (95%) bounds are between 55.2 and 69.8.

Country: China, Hong Kong SAR , Year: 1980

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.6 and 68.6. Uncertainty (95%) bounds are between 56.2 and 71.

Country: China, Hong Kong SAR , Year: 1981

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.7 and 69.6. Uncertainty (95%) bounds are between 57.2 and 71.9.

Country: China, Hong Kong SAR , Year: 1982

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.6 and 70.6. Uncertainty (95%) bounds are between 58.5 and 72.9.

Country: China, Hong Kong SAR , Year: 1983

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.7 and 71.9. Uncertainty (95%) bounds are between 59.8 and 74.2.

Country: China, Hong Kong SAR , Year: 1984

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.9 and 73.3. Uncertainty (95%) bounds are between 61.1 and 75.6.

Country: China, Hong Kong SAR , Year: 1985

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.1 and 74.6. Uncertainty (95%) bounds are between 62.4 and 76.8.

Country: China, Hong Kong SAR , Year: 1986

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.4 and 75.8. Uncertainty (95%) bounds are between 63.8 and 77.9.

Country: China, Hong Kong SAR , Year: 1987

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.5 and 77. Uncertainty (95%) bounds are between 64.9 and 78.9.

Country: China, Hong Kong SAR , Year: 1988

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.6 and 78. Uncertainty (95%) bounds are between 66.2 and 80.

Country: China, Hong Kong SAR , Year: 1989

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.6 and 79. Uncertainty (95%) bounds are between 67.1 and 81.

Country: China, Hong Kong SAR , Year: 1990

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.7 and 79.9. Uncertainty (95%) bounds are between 68.2 and 81.9.

Country: China, Hong Kong SAR , Year: 1991

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.8 and 80.8. Uncertainty (95%) bounds are between 69.2 and 82.6.

Country: China, Hong Kong SAR , Year: 1992

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.1 and 81.5. Uncertainty (95%) bounds are between 70.1 and 83.2.

Country: China, Hong Kong SAR , Year: 1993

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.6 and 81.9. Uncertainty (95%) bounds are between 70.9 and 83.7.

Country: China, Hong Kong SAR , Year: 1994

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.4 and 82.3. Uncertainty (95%) bounds are between 71.4 and 84.

Country: China, Hong Kong SAR , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.9 and 82.6. Uncertainty (95%) bounds are between 71.7 and 84.2.

Country: China, Hong Kong SAR , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.2 and 82.6. Uncertainty (95%) bounds are between 72.2 and 84.3.

Country: China, Hong Kong SAR , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.6 and 82.7. Uncertainty (95%) bounds are between 72.5 and 84.2.

Country: China, Hong Kong SAR , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.8 and 82.6. Uncertainty (95%) bounds are between 72.6 and 84.2.

Country: China, Hong Kong SAR , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.9 and 82.4. Uncertainty (95%) bounds are between 72.6 and 84.1.

Country: China, Hong Kong SAR , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.3 and 82.3. Uncertainty (95%) bounds are between 72.5 and 83.9.

Country: China, Hong Kong SAR , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.3 and 81.9. Uncertainty (95%) bounds are between 72.4 and 83.5.

Country: China, Hong Kong SAR , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.3 and 81.5. Uncertainty (95%) bounds are between 72.3 and 83.1.

Country: China, Hong Kong SAR , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.1 and 81.1. Uncertainty (95%) bounds are between 72 and 82.6.

Country: China, Hong Kong SAR , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.6 and 80.6. Uncertainty (95%) bounds are between 71.6 and 82.2.

Country: China, Hong Kong SAR , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.5 and 79.9. Uncertainty (95%) bounds are between 71.1 and 81.6.

Country: China, Hong Kong SAR , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.2 and 79.2. Uncertainty (95%) bounds are between 70.7 and 80.8.

Country: China, Hong Kong SAR , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.8 and 78.3. Uncertainty (95%) bounds are between 70.2 and 80.

Country: China, Hong Kong SAR , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.4 and 77.6. Uncertainty (95%) bounds are between 69.5 and 79.4.

Country: China, Hong Kong SAR , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.7 and 76.9. Uncertainty (95%) bounds are between 68.7 and 78.8.

Country: China, Hong Kong SAR , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.1 and 76.1. Uncertainty (95%) bounds are between 68 and 78.

Country: China, Hong Kong SAR , Year: 2011

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.6 and 75.1. Uncertainty (95%) bounds are between 67.3 and 77.

Country: China, Hong Kong SAR , Year: 2012

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64 and 74.1. Uncertainty (95%) bounds are between 66.6 and 75.8.

Country: China, Hong Kong SAR , Year: 2013

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.1 and 73.2. Uncertainty (95%) bounds are between 65.6 and 75.

Country: China, Hong Kong SAR , Year: 2014

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.2 and 72.2. Uncertainty (95%) bounds are between 64.5 and 74.

Country: China, Hong Kong SAR , Year: 2015

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.4 and 71.1. Uncertainty (95%) bounds are between 63.6 and 72.9.

Country: China, Hong Kong SAR , Year: 2016

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.9 and 70. Uncertainty (95%) bounds are between 63 and 71.8.

Country: China, Hong Kong SAR , Year: 2017

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.6 and 69.3. Uncertainty (95%) bounds are between 62.5 and 71.

Country: China, Hong Kong SAR , Year: 2018

Estimation Method: Projection. Uncertainty (80%) bounds are between 59.4 and 69.7. Uncertainty (95%) bounds are between 61.7 and 71.7.

Country: China, Hong Kong SAR , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 58 and 70.6. Uncertainty (95%) bounds are between 60.9 and 72.9.

Country: China, Hong Kong SAR , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 57.1 and 71.5. Uncertainty (95%) bounds are between 60.4 and 74.1.

Country: China, Hong Kong SAR , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 56.1 and 72.4. Uncertainty (95%) bounds are between 59.9 and 75.2.

Country: China, Hong Kong SAR , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 55.5 and 73.2. Uncertainty (95%) bounds are between 59.6 and 76.3.

Country: China, Taiwan Province of China , Year: 1970

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 15 and 34.6. Uncertainty (95%) bounds are between 21.2 and 36.4.

Country: China, Taiwan Province of China , Year: 1971

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 17.4 and 38.5. Uncertainty (95%) bounds are between 24 and 40.4.

Country: China, Taiwan Province of China , Year: 1972

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 20.2 and 42.7. Uncertainty (95%) bounds are between 27.4 and 44.7.

Country: China, Taiwan Province of China , Year: 1973

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 23.2 and 46.7. Uncertainty (95%) bounds are between 30.8 and 48.6.

Country: China, Taiwan Province of China , Year: 1974

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 25.3 and 50.4. Uncertainty (95%) bounds are between 33.4 and 52.6.

Country: China, Taiwan Province of China , Year: 1975

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 27.6 and 53.5. Uncertainty (95%) bounds are between 36.1 and 56.

Country: China, Taiwan Province of China , Year: 1976

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 29.8 and 56.2. Uncertainty (95%) bounds are between 38.5 and 58.6.

Country: China, Taiwan Province of China , Year: 1977

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 31.6 and 58.4. Uncertainty (95%) bounds are between 40.8 and 60.8.

Country: China, Taiwan Province of China , Year: 1978

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 33.6 and 60.2. Uncertainty (95%) bounds are between 43 and 62.5.

Country: China, Taiwan Province of China , Year: 1979

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 35.4 and 61.9. Uncertainty (95%) bounds are between 45 and 63.9.

Country: China, Taiwan Province of China , Year: 1980

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 36.4 and 63.6. Uncertainty (95%) bounds are between 46.5 and 65.7.

Country: China, Taiwan Province of China , Year: 1981

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.5 and 65. Uncertainty (95%) bounds are between 47.6 and 67.3.

Country: China, Taiwan Province of China , Year: 1982

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.5 and 66.2. Uncertainty (95%) bounds are between 48.8 and 68.6.

Country: China, Taiwan Province of China , Year: 1983

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 39.6 and 67.1. Uncertainty (95%) bounds are between 49.8 and 69.5.

Country: China, Taiwan Province of China , Year: 1984

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 40.5 and 67.9. Uncertainty (95%) bounds are between 50.9 and 70.1.

Country: China, Taiwan Province of China , Year: 1985

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 41.5 and 68.5. Uncertainty (95%) bounds are between 51.9 and 70.5.

Country: China, Taiwan Province of China , Year: 1986

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42.7 and 69.1. Uncertainty (95%) bounds are between 53 and 70.9.

Country: China, Taiwan Province of China , Year: 1987

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43.6 and 70.2. Uncertainty (95%) bounds are between 53.9 and 72.2.

Country: China, Taiwan Province of China , Year: 1988

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.7 and 71.4. Uncertainty (95%) bounds are between 54.6 and 73.6.

Country: China, Taiwan Province of China , Year: 1989

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 45.5 and 72.6. Uncertainty (95%) bounds are between 55.7 and 74.9.

Country: China, Taiwan Province of China , Year: 1990

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.4 and 73.6. Uncertainty (95%) bounds are between 56.6 and 76.

Country: China, Taiwan Province of China , Year: 1991

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.4 and 74.6. Uncertainty (95%) bounds are between 57.6 and 77.

Country: China, Taiwan Province of China , Year: 1992

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.6 and 75.4. Uncertainty (95%) bounds are between 58.7 and 77.9.

Country: China, Taiwan Province of China , Year: 1993

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.7 and 76.2. Uncertainty (95%) bounds are between 59.8 and 78.6.

Country: China, Taiwan Province of China , Year: 1994

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.8 and 76.9. Uncertainty (95%) bounds are between 60.7 and 79.1.

Country: China, Taiwan Province of China , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.9 and 77.5. Uncertainty (95%) bounds are between 61.8 and 79.6.

Country: China, Taiwan Province of China , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.8 and 77.9. Uncertainty (95%) bounds are between 62.9 and 79.8.

Country: China, Taiwan Province of China , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.7 and 78.2. Uncertainty (95%) bounds are between 63.6 and 80.

Country: China, Taiwan Province of China , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.4 and 78.2. Uncertainty (95%) bounds are between 64 and 79.9.

Country: China, Taiwan Province of China , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.4 and 78.1. Uncertainty (95%) bounds are between 63.3 and 79.8.

Country: China, Taiwan Province of China , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.1 and 77.6. Uncertainty (95%) bounds are between 62.1 and 79.5.

Country: China, Taiwan Province of China , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.9 and 76.9. Uncertainty (95%) bounds are between 60.8 and 79.

Country: China, Taiwan Province of China , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.5 and 76.2. Uncertainty (95%) bounds are between 59.7 and 78.3.

Country: China, Taiwan Province of China , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.6 and 75.3. Uncertainty (95%) bounds are between 58.7 and 77.4.

Country: China, Taiwan Province of China , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.7 and 74.7. Uncertainty (95%) bounds are between 57.8 and 76.9.

Country: China, Taiwan Province of China , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.6 and 74.6. Uncertainty (95%) bounds are between 57.7 and 76.9.

Country: China, Taiwan Province of China , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.8 and 74.9. Uncertainty (95%) bounds are between 57.9 and 77.

Country: China, Taiwan Province of China , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.2 and 75.1. Uncertainty (95%) bounds are between 58.1 and 77.2.

Country: China, Taiwan Province of China , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.4 and 75.3. Uncertainty (95%) bounds are between 58.3 and 77.4.

Country: China, Taiwan Province of China , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.6 and 75.5. Uncertainty (95%) bounds are between 58.4 and 77.6.

Country: China, Taiwan Province of China , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.5 and 75.6. Uncertainty (95%) bounds are between 58.3 and 77.7.

Country: China, Taiwan Province of China , Year: 2011

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.2 and 75.5. Uncertainty (95%) bounds are between 58.2 and 77.6.

Country: China, Taiwan Province of China , Year: 2012

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.3 and 75.3. Uncertainty (95%) bounds are between 58 and 77.4.

Country: China, Taiwan Province of China , Year: 2013

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.2 and 75.1. Uncertainty (95%) bounds are between 57.5 and 77.3.

Country: China, Taiwan Province of China , Year: 2014

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.6 and 74.8. Uncertainty (95%) bounds are between 57.1 and 77.

Country: China, Taiwan Province of China , Year: 2015

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47 and 74.5. Uncertainty (95%) bounds are between 56.5 and 76.8.

Country: China, Taiwan Province of China , Year: 2016

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.6 and 74.2. Uncertainty (95%) bounds are between 56.2 and 76.6.

Country: China, Taiwan Province of China , Year: 2017

Estimation Method: Projection. Uncertainty (80%) bounds are between 46.6 and 74.5. Uncertainty (95%) bounds are between 56.2 and 77.1.

Country: China, Taiwan Province of China , Year: 2018

Estimation Method: Projection. Uncertainty (80%) bounds are between 46.9 and 75. Uncertainty (95%) bounds are between 56.2 and 77.8.

Country: China, Taiwan Province of China , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 46.9 and 75.5. Uncertainty (95%) bounds are between 56.2 and 78.6.

Country: China, Taiwan Province of China , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 47.2 and 76. Uncertainty (95%) bounds are between 56.2 and 79.3.

Country: China, Taiwan Province of China , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 47.3 and 76.6. Uncertainty (95%) bounds are between 56.3 and 80.

Country: China, Taiwan Province of China , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 47.5 and 77.1. Uncertainty (95%) bounds are between 56.4 and 80.6.

Country: Croatia , Year: 1970

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 3.4 and 11.3. Uncertainty (95%) bounds are between 4.5 and 14.2.

Country: Croatia , Year: 1971

Estimation Method: Projection. Uncertainty (80%) bounds are between 3.5 and 12.3. Uncertainty (95%) bounds are between 4.6 and 15.3.

Country: Croatia , Year: 1972

Estimation Method: Projection. Uncertainty (80%) bounds are between 3.6 and 13.3. Uncertainty (95%) bounds are between 4.8 and 16.7.

Country: Croatia , Year: 1973

Estimation Method: Projection. Uncertainty (80%) bounds are between 3.7 and 14.3. Uncertainty (95%) bounds are between 5 and 18.2.

Country: Croatia , Year: 1974

Estimation Method: Projection. Uncertainty (80%) bounds are between 3.8 and 15.4. Uncertainty (95%) bounds are between 5.2 and 19.7.

Country: Croatia , Year: 1975

Estimation Method: Projection. Uncertainty (80%) bounds are between 3.8 and 16.4. Uncertainty (95%) bounds are between 5.4 and 21.2.

Country: Croatia , Year: 1976

Estimation Method: Projection. Uncertainty (80%) bounds are between 3.9 and 17.6. Uncertainty (95%) bounds are between 5.6 and 22.6.

Country: Croatia , Year: 1977

Estimation Method: Projection. Uncertainty (80%) bounds are between 4 and 18.6. Uncertainty (95%) bounds are between 5.8 and 24.3.

Country: Croatia , Year: 1978

Estimation Method: Projection. Uncertainty (80%) bounds are between 4.2 and 19.8. Uncertainty (95%) bounds are between 6.1 and 25.7.

Country: Croatia , Year: 1979

Estimation Method: Projection. Uncertainty (80%) bounds are between 4.3 and 21. Uncertainty (95%) bounds are between 6.4 and 27.3.

Country: Croatia , Year: 1980

Estimation Method: Projection. Uncertainty (80%) bounds are between 4.5 and 22.2. Uncertainty (95%) bounds are between 6.6 and 29.

Country: Croatia , Year: 1981

Estimation Method: Projection. Uncertainty (80%) bounds are between 4.7 and 23.6. Uncertainty (95%) bounds are between 6.9 and 30.8.

Country: Croatia , Year: 1982

Estimation Method: Projection. Uncertainty (80%) bounds are between 4.9 and 24.9. Uncertainty (95%) bounds are between 7.2 and 32.6.

Country: Croatia , Year: 1983

Estimation Method: Projection. Uncertainty (80%) bounds are between 5.1 and 26.2. Uncertainty (95%) bounds are between 7.6 and 34.1.

Country: Croatia , Year: 1984

Estimation Method: Projection. Uncertainty (80%) bounds are between 5.3 and 27.6. Uncertainty (95%) bounds are between 7.9 and 35.8.

Country: Croatia , Year: 1985

Estimation Method: Projection. Uncertainty (80%) bounds are between 5.5 and 29.1. Uncertainty (95%) bounds are between 8.2 and 37.5.

Country: Croatia , Year: 1986

Estimation Method: Projection. Uncertainty (80%) bounds are between 5.7 and 30.5. Uncertainty (95%) bounds are between 8.6 and 39.2.

Country: Croatia , Year: 1987

Estimation Method: Projection. Uncertainty (80%) bounds are between 5.9 and 31.9. Uncertainty (95%) bounds are between 9 and 40.9.

Country: Croatia , Year: 1988

Estimation Method: Projection. Uncertainty (80%) bounds are between 6.1 and 33.4. Uncertainty (95%) bounds are between 9.3 and 42.3.

Country: Croatia , Year: 1989

Estimation Method: Projection. Uncertainty (80%) bounds are between 6.3 and 34.7. Uncertainty (95%) bounds are between 9.7 and 43.9.

Country: Croatia , Year: 1990

Estimation Method: Projection. Uncertainty (80%) bounds are between 6.6 and 36. Uncertainty (95%) bounds are between 10 and 45.3.

Country: Croatia , Year: 1991

Estimation Method: Projection. Uncertainty (80%) bounds are between 6.8 and 37.4. Uncertainty (95%) bounds are between 10.4 and 47.2.

Country: Croatia , Year: 1992

Estimation Method: Projection. Uncertainty (80%) bounds are between 6.9 and 38.7. Uncertainty (95%) bounds are between 10.9 and 48.7.

Country: Croatia , Year: 1993

Estimation Method: Projection. Uncertainty (80%) bounds are between 7.1 and 40. Uncertainty (95%) bounds are between 11.1 and 49.7.

Country: Croatia , Year: 1994

Estimation Method: Projection. Uncertainty (80%) bounds are between 7.4 and 41.5. Uncertainty (95%) bounds are between 11.5 and 51.3.

Country: Croatia , Year: 1995

Estimation Method: Projection. Uncertainty (80%) bounds are between 7.6 and 42.6. Uncertainty (95%) bounds are between 11.8 and 52.6.

Country: Croatia , Year: 1996

Estimation Method: Projection. Uncertainty (80%) bounds are between 7.8 and 43.7. Uncertainty (95%) bounds are between 12.3 and 54.

Country: Croatia , Year: 1997

Estimation Method: Projection. Uncertainty (80%) bounds are between 8 and 45.1. Uncertainty (95%) bounds are between 12.7 and 55.2.

Country: Croatia , Year: 1998

Estimation Method: Projection. Uncertainty (80%) bounds are between 8.2 and 46.1. Uncertainty (95%) bounds are between 13.2 and 56.6.

Country: Croatia , Year: 1999

Estimation Method: Projection. Uncertainty (80%) bounds are between 8.5 and 47.3. Uncertainty (95%) bounds are between 13.4 and 57.7.

Country: Croatia , Year: 2000

Estimation Method: Projection. Uncertainty (80%) bounds are between 8.8 and 48.3. Uncertainty (95%) bounds are between 13.8 and 58.9.

Country: Croatia , Year: 2001

Estimation Method: Projection. Uncertainty (80%) bounds are between 9 and 49.4. Uncertainty (95%) bounds are between 14.3 and 60.

Country: Croatia , Year: 2002

Estimation Method: Projection. Uncertainty (80%) bounds are between 9.3 and 50.5. Uncertainty (95%) bounds are between 14.7 and 61.2.

Country: Croatia , Year: 2003

Estimation Method: Projection. Uncertainty (80%) bounds are between 9.5 and 51.8. Uncertainty (95%) bounds are between 15.2 and 62.6.

Country: Croatia , Year: 2004

Estimation Method: Projection. Uncertainty (80%) bounds are between 9.8 and 52.8. Uncertainty (95%) bounds are between 15.6 and 64.

Country: Croatia , Year: 2005

Estimation Method: Projection. Uncertainty (80%) bounds are between 10.3 and 53.9. Uncertainty (95%) bounds are between 16.1 and 65.1.

Country: Croatia , Year: 2006

Estimation Method: Projection. Uncertainty (80%) bounds are between 10.5 and 54.9. Uncertainty (95%) bounds are between 16.5 and 65.7.

Country: Croatia , Year: 2007

Estimation Method: Projection. Uncertainty (80%) bounds are between 10.8 and 55.9. Uncertainty (95%) bounds are between 16.9 and 67.

Country: Croatia , Year: 2008

Estimation Method: Projection. Uncertainty (80%) bounds are between 11 and 56.9. Uncertainty (95%) bounds are between 17.3 and 67.7.

Country: Croatia , Year: 2009

Estimation Method: Projection. Uncertainty (80%) bounds are between 11.3 and 57.8. Uncertainty (95%) bounds are between 17.9 and 68.8.

Country: Croatia , Year: 2010

Estimation Method: Projection. Uncertainty (80%) bounds are between 11.6 and 58.6. Uncertainty (95%) bounds are between 18.3 and 69.8.

Country: Croatia , Year: 2011

Estimation Method: Projection. Uncertainty (80%) bounds are between 12 and 59.5. Uncertainty (95%) bounds are between 18.7 and 70.4.

Country: Croatia , Year: 2012

Estimation Method: Projection. Uncertainty (80%) bounds are between 12.3 and 60.6. Uncertainty (95%) bounds are between 19.1 and 71.3.

Country: Croatia , Year: 2013

Estimation Method: Projection. Uncertainty (80%) bounds are between 12.6 and 61.4. Uncertainty (95%) bounds are between 19.5 and 72.1.

Country: Croatia , Year: 2014

Estimation Method: Projection. Uncertainty (80%) bounds are between 12.9 and 62.1. Uncertainty (95%) bounds are between 19.9 and 72.8.

Country: Croatia , Year: 2015

Estimation Method: Projection. Uncertainty (80%) bounds are between 13.3 and 62.9. Uncertainty (95%) bounds are between 20.6 and 73.5.

Country: Croatia , Year: 2016

Estimation Method: Projection. Uncertainty (80%) bounds are between 13.7 and 63.6. Uncertainty (95%) bounds are between 21 and 74.1.

Country: Croatia , Year: 2017

Estimation Method: Projection. Uncertainty (80%) bounds are between 14 and 64.5. Uncertainty (95%) bounds are between 21.4 and 75.

Country: Croatia , Year: 2018

Estimation Method: Projection. Uncertainty (80%) bounds are between 14.3 and 65.3. Uncertainty (95%) bounds are between 22 and 75.8.

Country: Croatia , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 14.6 and 66.2. Uncertainty (95%) bounds are between 22.5 and 76.4.

Country: Croatia , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 14.9 and 66.8. Uncertainty (95%) bounds are between 23 and 77.

Country: Croatia , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 15 and 67.4. Uncertainty (95%) bounds are between 23.5 and 77.5.

Country: Croatia , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 15.2 and 68.3. Uncertainty (95%) bounds are between 23.9 and 78.1.

Country: Czechia , Year: 1970

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 15.7 and 39.8. Uncertainty (95%) bounds are between 19.8 and 45.6.

Country: Czechia , Year: 1971

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 16.1 and 41. Uncertainty (95%) bounds are between 20.5 and 47.1.

Country: Czechia , Year: 1972

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 16.6 and 42.2. Uncertainty (95%) bounds are between 21.2 and 48.2.

Country: Czechia , Year: 1973

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 17.1 and 43.4. Uncertainty (95%) bounds are between 21.9 and 49.4.

Country: Czechia , Year: 1974

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 17.7 and 44.5. Uncertainty (95%) bounds are between 22.6 and 50.4.

Country: Czechia , Year: 1975

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 18.4 and 45.6. Uncertainty (95%) bounds are between 23.4 and 51.6.

Country: Czechia , Year: 1976

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 19.2 and 46.6. Uncertainty (95%) bounds are between 24.2 and 52.6.

Country: Czechia , Year: 1977

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 19.9 and 47.8. Uncertainty (95%) bounds are between 25.1 and 53.7.

Country: Czechia , Year: 1978

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 20.9 and 48.7. Uncertainty (95%) bounds are between 26.1 and 54.8.

Country: Czechia , Year: 1979

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 21.7 and 49.7. Uncertainty (95%) bounds are between 27.1 and 55.7.

Country: Czechia , Year: 1980

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 22.8 and 50.6. Uncertainty (95%) bounds are between 28.2 and 56.4.

Country: Czechia , Year: 1981

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 24 and 51.6. Uncertainty (95%) bounds are between 29.3 and 57.3.

Country: Czechia , Year: 1982

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 25.1 and 52.3. Uncertainty (95%) bounds are between 30.5 and 58.

Country: Czechia , Year: 1983

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 26.1 and 53.1. Uncertainty (95%) bounds are between 31.5 and 58.7.

Country: Czechia , Year: 1984

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 27.5 and 53.9. Uncertainty (95%) bounds are between 32.8 and 59.1.

Country: Czechia , Year: 1985

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 28.7 and 54.5. Uncertainty (95%) bounds are between 34.3 and 59.5.

Country: Czechia , Year: 1986

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 30 and 55.1. Uncertainty (95%) bounds are between 35.4 and 60.

Country: Czechia , Year: 1987

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 31.6 and 55.7. Uncertainty (95%) bounds are between 36.9 and 60.5.

Country: Czechia , Year: 1988

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 33.2 and 56.3. Uncertainty (95%) bounds are between 38.4 and 60.6.

Country: Czechia , Year: 1989

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.8 and 56.8. Uncertainty (95%) bounds are between 39.8 and 60.8.

Country: Czechia , Year: 1990

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 36.7 and 57.4. Uncertainty (95%) bounds are between 41.4 and 61.1.

Country: Czechia , Year: 1991

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.3 and 57.9. Uncertainty (95%) bounds are between 42.7 and 61.6.

Country: Czechia , Year: 1992

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 39 and 58.4. Uncertainty (95%) bounds are between 43.3 and 62.1.

Country: Czechia , Year: 1993

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 39.8 and 58.9. Uncertainty (95%) bounds are between 43.9 and 62.6.

Country: Czechia , Year: 1994

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 41.4 and 60.7. Uncertainty (95%) bounds are between 45.6 and 64.1.

Country: Czechia , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43.2 and 62.3. Uncertainty (95%) bounds are between 47.5 and 65.9.

Country: Czechia , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 45.3 and 63.9. Uncertainty (95%) bounds are between 49.5 and 67.3.

Country: Czechia , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.5 and 65.4. Uncertainty (95%) bounds are between 51.5 and 68.7.

Country: Czechia , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.1 and 66.7. Uncertainty (95%) bounds are between 52.4 and 69.9.

Country: Czechia , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.8 and 67.9. Uncertainty (95%) bounds are between 53.3 and 71.1.

Country: Czechia , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.4 and 69. Uncertainty (95%) bounds are between 54.3 and 72.1.

Country: Czechia , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50 and 70.1. Uncertainty (95%) bounds are between 55.3 and 73.

Country: Czechia , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.8 and 71. Uncertainty (95%) bounds are between 56.5 and 73.8.

Country: Czechia , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.8 and 71.8. Uncertainty (95%) bounds are between 57.7 and 74.5.

Country: Czechia , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.5 and 72.7. Uncertainty (95%) bounds are between 58.9 and 75.3.

Country: Czechia , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.2 and 73.5. Uncertainty (95%) bounds are between 60.3 and 76.

Country: Czechia , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.7 and 74.9. Uncertainty (95%) bounds are between 61.6 and 77.4.

Country: Czechia , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.2 and 76.3. Uncertainty (95%) bounds are between 63 and 78.6.

Country: Czechia , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.2 and 77.4. Uncertainty (95%) bounds are between 64.1 and 79.7.

Country: Czechia , Year: 2009

Estimation Method: Projection. Uncertainty (80%) bounds are between 57.3 and 78.4. Uncertainty (95%) bounds are between 64.3 and 80.9.

Country: Czechia , Year: 2010

Estimation Method: Projection. Uncertainty (80%) bounds are between 57.2 and 79.2. Uncertainty (95%) bounds are between 64.2 and 81.8.

Country: Czechia , Year: 2011

Estimation Method: Projection. Uncertainty (80%) bounds are between 57 and 79.8. Uncertainty (95%) bounds are between 64.1 and 82.6.

Country: Czechia , Year: 2012

Estimation Method: Projection. Uncertainty (80%) bounds are between 56.7 and 80.4. Uncertainty (95%) bounds are between 63.8 and 83.4.

Country: Czechia , Year: 2013

Estimation Method: Projection. Uncertainty (80%) bounds are between 56.1 and 81. Uncertainty (95%) bounds are between 63.6 and 84.

Country: Czechia , Year: 2014

Estimation Method: Projection. Uncertainty (80%) bounds are between 56 and 81.6. Uncertainty (95%) bounds are between 63.5 and 84.7.

Country: Czechia , Year: 2015

Estimation Method: Projection. Uncertainty (80%) bounds are between 55.9 and 82. Uncertainty (95%) bounds are between 63.3 and 85.2.

Country: Czechia , Year: 2016

Estimation Method: Projection. Uncertainty (80%) bounds are between 55.4 and 82.5. Uncertainty (95%) bounds are between 63.2 and 85.7.

Country: Czechia , Year: 2017

Estimation Method: Projection. Uncertainty (80%) bounds are between 55.2 and 82.9. Uncertainty (95%) bounds are between 63 and 86.4.

Country: Czechia , Year: 2018

Estimation Method: Projection. Uncertainty (80%) bounds are between 54.7 and 83.4. Uncertainty (95%) bounds are between 62.9 and 86.8.

Country: Czechia , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 54.4 and 83.8. Uncertainty (95%) bounds are between 62.8 and 87.1.

Country: Czechia , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 54.4 and 84.2. Uncertainty (95%) bounds are between 62.7 and 87.5.

Country: Czechia , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 54 and 84.5. Uncertainty (95%) bounds are between 62.6 and 87.9.

Country: Czechia , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 53.7 and 84.8. Uncertainty (95%) bounds are between 62.5 and 88.3.

Country: Denmark , Year: 1970

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43.2 and 60.8. Uncertainty (95%) bounds are between 47.1 and 64.1.

Country: Denmark , Year: 1971

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.4 and 61.5. Uncertainty (95%) bounds are between 48.3 and 64.6.

Country: Denmark , Year: 1972

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 45.6 and 62.3. Uncertainty (95%) bounds are between 49.4 and 65.4.

Country: Denmark , Year: 1973

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.7 and 63.1. Uncertainty (95%) bounds are between 50.5 and 66.1.

Country: Denmark , Year: 1974

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.8 and 63.9. Uncertainty (95%) bounds are between 51.6 and 66.8.

Country: Denmark , Year: 1975

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49 and 64.9. Uncertainty (95%) bounds are between 52.7 and 67.7.

Country: Denmark , Year: 1976

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.3 and 65.9. Uncertainty (95%) bounds are between 53.1 and 68.8.

Country: Denmark , Year: 1977

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.5 and 67.1. Uncertainty (95%) bounds are between 53.6 and 70.1.

Country: Denmark , Year: 1978

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.9 and 68.2. Uncertainty (95%) bounds are between 54.2 and 71.4.

Country: Denmark , Year: 1979

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.5 and 69.4. Uncertainty (95%) bounds are between 54.8 and 72.7.

Country: Denmark , Year: 1980

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.1 and 70.4. Uncertainty (95%) bounds are between 55.5 and 73.8.

Country: Denmark , Year: 1981

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.8 and 71.4. Uncertainty (95%) bounds are between 56.2 and 74.9.

Country: Denmark , Year: 1982

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.6 and 72.4. Uncertainty (95%) bounds are between 57.1 and 75.7.

Country: Denmark , Year: 1983

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.6 and 73.3. Uncertainty (95%) bounds are between 58 and 76.7.

Country: Denmark , Year: 1984

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.3 and 74.1. Uncertainty (95%) bounds are between 58.9 and 77.4.

Country: Denmark , Year: 1985

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.3 and 74.8. Uncertainty (95%) bounds are between 59.9 and 78.1.

Country: Denmark , Year: 1986

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.4 and 75.4. Uncertainty (95%) bounds are between 60.8 and 78.6.

Country: Denmark , Year: 1987

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.5 and 75.9. Uncertainty (95%) bounds are between 61.7 and 79.

Country: Denmark , Year: 1988

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.4 and 76.2. Uncertainty (95%) bounds are between 62.5 and 79.

Country: Denmark , Year: 1989

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.1 and 76. Uncertainty (95%) bounds are between 63.1 and 78.6.

Country: Denmark , Year: 1990

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.6 and 75.6. Uncertainty (95%) bounds are between 63.6 and 78.1.

Country: Denmark , Year: 1991

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.1 and 75.4. Uncertainty (95%) bounds are between 64 and 77.8.

Country: Denmark , Year: 1992

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.2 and 75.5. Uncertainty (95%) bounds are between 64.3 and 77.9.

Country: Denmark , Year: 1993

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60 and 76. Uncertainty (95%) bounds are between 64.2 and 78.3.

Country: Denmark , Year: 1994

Estimation Method: Projection. Uncertainty (80%) bounds are between 59.4 and 76.6. Uncertainty (95%) bounds are between 63.8 and 79.1.

Country: Denmark , Year: 1995

Estimation Method: Projection. Uncertainty (80%) bounds are between 58.8 and 77.1. Uncertainty (95%) bounds are between 63.4 and 79.9.

Country: Denmark , Year: 1996

Estimation Method: Projection. Uncertainty (80%) bounds are between 58.3 and 77.7. Uncertainty (95%) bounds are between 62.9 and 80.7.

Country: Denmark , Year: 1997

Estimation Method: Projection. Uncertainty (80%) bounds are between 57.6 and 78.1. Uncertainty (95%) bounds are between 62.6 and 81.4.

Country: Denmark , Year: 1998

Estimation Method: Projection. Uncertainty (80%) bounds are between 56.9 and 78.6. Uncertainty (95%) bounds are between 62.1 and 82.1.

Country: Denmark , Year: 1999

Estimation Method: Projection. Uncertainty (80%) bounds are between 56.1 and 79.1. Uncertainty (95%) bounds are between 61.7 and 82.7.

Country: Denmark , Year: 2000

Estimation Method: Projection. Uncertainty (80%) bounds are between 55.5 and 79.5. Uncertainty (95%) bounds are between 61.4 and 83.3.

Country: Denmark , Year: 2001

Estimation Method: Projection. Uncertainty (80%) bounds are between 54.9 and 79.9. Uncertainty (95%) bounds are between 61 and 83.8.

Country: Denmark , Year: 2002

Estimation Method: Projection. Uncertainty (80%) bounds are between 54.5 and 80.4. Uncertainty (95%) bounds are between 60.6 and 84.3.

Country: Denmark , Year: 2003

Estimation Method: Projection. Uncertainty (80%) bounds are between 53.9 and 80.7. Uncertainty (95%) bounds are between 60.3 and 84.8.

Country: Denmark , Year: 2004

Estimation Method: Projection. Uncertainty (80%) bounds are between 53.2 and 81.2. Uncertainty (95%) bounds are between 59.9 and 85.3.

Country: Denmark , Year: 2005

Estimation Method: Projection. Uncertainty (80%) bounds are between 52.7 and 81.5. Uncertainty (95%) bounds are between 59.6 and 85.7.

Country: Denmark , Year: 2006

Estimation Method: Projection. Uncertainty (80%) bounds are between 52.3 and 81.9. Uncertainty (95%) bounds are between 59.4 and 85.9.

Country: Denmark , Year: 2007

Estimation Method: Projection. Uncertainty (80%) bounds are between 51.6 and 82.2. Uncertainty (95%) bounds are between 59 and 86.3.

Country: Denmark , Year: 2008

Estimation Method: Projection. Uncertainty (80%) bounds are between 51 and 82.4. Uncertainty (95%) bounds are between 58.8 and 86.7.

Country: Denmark , Year: 2009

Estimation Method: Projection. Uncertainty (80%) bounds are between 50.4 and 82.7. Uncertainty (95%) bounds are between 58.5 and 87.

Country: Denmark , Year: 2010

Estimation Method: Projection. Uncertainty (80%) bounds are between 50 and 83. Uncertainty (95%) bounds are between 58.2 and 87.3.

Country: Denmark , Year: 2011

Estimation Method: Projection. Uncertainty (80%) bounds are between 49.7 and 83.3. Uncertainty (95%) bounds are between 58.1 and 87.6.

Country: Denmark , Year: 2012

Estimation Method: Projection. Uncertainty (80%) bounds are between 49.2 and 83.6. Uncertainty (95%) bounds are between 57.9 and 87.9.

Country: Denmark , Year: 2013

Estimation Method: Projection. Uncertainty (80%) bounds are between 48.7 and 83.9. Uncertainty (95%) bounds are between 57.6 and 88.2.

Country: Denmark , Year: 2014

Estimation Method: Projection. Uncertainty (80%) bounds are between 48 and 84.1. Uncertainty (95%) bounds are between 57.4 and 88.5.

Country: Denmark , Year: 2015

Estimation Method: Projection. Uncertainty (80%) bounds are between 47.5 and 84.3. Uncertainty (95%) bounds are between 57 and 88.8.

Country: Denmark , Year: 2016

Estimation Method: Projection. Uncertainty (80%) bounds are between 47.4 and 84.6. Uncertainty (95%) bounds are between 56.9 and 89.

Country: Denmark , Year: 2017

Estimation Method: Projection. Uncertainty (80%) bounds are between 46.9 and 84.8. Uncertainty (95%) bounds are between 56.5 and 89.2.

Country: Denmark , Year: 2018

Estimation Method: Projection. Uncertainty (80%) bounds are between 46.5 and 85. Uncertainty (95%) bounds are between 56.4 and 89.4.

Country: Denmark , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 46.3 and 85.2. Uncertainty (95%) bounds are between 56.2 and 89.6.

Country: Denmark , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 45.8 and 85.4. Uncertainty (95%) bounds are between 56 and 89.9.

Country: Denmark , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 45.1 and 85.6. Uncertainty (95%) bounds are between 56 and 90.1.

Country: Denmark , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 45.2 and 85.7. Uncertainty (95%) bounds are between 55.8 and 90.2.

Country: Estonia , Year: 1970

Estimation Method: Projection. Uncertainty (80%) bounds are between 11.7 and 55.1. Uncertainty (95%) bounds are between 19 and 64.1.

Country: Estonia , Year: 1971

Estimation Method: Projection. Uncertainty (80%) bounds are between 12.4 and 55.3. Uncertainty (95%) bounds are between 19.7 and 64.3.

Country: Estonia , Year: 1972

Estimation Method: Projection. Uncertainty (80%) bounds are between 13.2 and 55.4. Uncertainty (95%) bounds are between 20.5 and 64.

Country: Estonia , Year: 1973

Estimation Method: Projection. Uncertainty (80%) bounds are between 14 and 55.5. Uncertainty (95%) bounds are between 21.2 and 64.

Country: Estonia , Year: 1974

Estimation Method: Projection. Uncertainty (80%) bounds are between 14.8 and 55.7. Uncertainty (95%) bounds are between 22.2 and 63.8.

Country: Estonia , Year: 1975

Estimation Method: Projection. Uncertainty (80%) bounds are between 15.6 and 55.8. Uncertainty (95%) bounds are between 23 and 63.6.

Country: Estonia , Year: 1976

Estimation Method: Projection. Uncertainty (80%) bounds are between 16.4 and 55.8. Uncertainty (95%) bounds are between 23.7 and 63.4.

Country: Estonia , Year: 1977

Estimation Method: Projection. Uncertainty (80%) bounds are between 17.3 and 56. Uncertainty (95%) bounds are between 24.6 and 63.5.

Country: Estonia , Year: 1978

Estimation Method: Projection. Uncertainty (80%) bounds are between 18.4 and 56. Uncertainty (95%) bounds are between 25.4 and 63.3.

Country: Estonia , Year: 1979

Estimation Method: Projection. Uncertainty (80%) bounds are between 19.3 and 56.1. Uncertainty (95%) bounds are between 26.2 and 63.

Country: Estonia , Year: 1980

Estimation Method: Projection. Uncertainty (80%) bounds are between 20.3 and 56.1. Uncertainty (95%) bounds are between 27 and 62.8.

Country: Estonia , Year: 1981

Estimation Method: Projection. Uncertainty (80%) bounds are between 21.4 and 56.1. Uncertainty (95%) bounds are between 28 and 62.8.

Country: Estonia , Year: 1982

Estimation Method: Projection. Uncertainty (80%) bounds are between 22.4 and 56. Uncertainty (95%) bounds are between 29 and 62.4.

Country: Estonia , Year: 1983

Estimation Method: Projection. Uncertainty (80%) bounds are between 23.5 and 55.9. Uncertainty (95%) bounds are between 30 and 62.

Country: Estonia , Year: 1984

Estimation Method: Projection. Uncertainty (80%) bounds are between 24.6 and 55.8. Uncertainty (95%) bounds are between 30.9 and 61.7.

Country: Estonia , Year: 1985

Estimation Method: Projection. Uncertainty (80%) bounds are between 25.7 and 55.8. Uncertainty (95%) bounds are between 31.8 and 61.4.

Country: Estonia , Year: 1986

Estimation Method: Projection. Uncertainty (80%) bounds are between 26.9 and 55.6. Uncertainty (95%) bounds are between 32.8 and 61.1.

Country: Estonia , Year: 1987

Estimation Method: Projection. Uncertainty (80%) bounds are between 28 and 55.4. Uncertainty (95%) bounds are between 33.9 and 60.4.

Country: Estonia , Year: 1988

Estimation Method: Projection. Uncertainty (80%) bounds are between 29.5 and 55.2. Uncertainty (95%) bounds are between 34.8 and 60.

Country: Estonia , Year: 1989

Estimation Method: Projection. Uncertainty (80%) bounds are between 30.6 and 54.9. Uncertainty (95%) bounds are between 35.8 and 59.5.

Country: Estonia , Year: 1990

Estimation Method: Projection. Uncertainty (80%) bounds are between 31.8 and 54.6. Uncertainty (95%) bounds are between 36.7 and 58.8.

Country: Estonia , Year: 1991

Estimation Method: Projection. Uncertainty (80%) bounds are between 32.9 and 54.1. Uncertainty (95%) bounds are between 37.5 and 58.

Country: Estonia , Year: 1992

Estimation Method: Projection. Uncertainty (80%) bounds are between 33.8 and 53.7. Uncertainty (95%) bounds are between 38.3 and 57.3.

Country: Estonia , Year: 1993

Estimation Method: Projection. Uncertainty (80%) bounds are between 35 and 53.1. Uncertainty (95%) bounds are between 39 and 56.8.

Country: Estonia , Year: 1994

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 36.2 and 52.6. Uncertainty (95%) bounds are between 39.9 and 56.1.

Country: Estonia , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 36.4 and 53.4. Uncertainty (95%) bounds are between 40.1 and 56.8.

Country: Estonia , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 36.7 and 54.1. Uncertainty (95%) bounds are between 40.5 and 57.6.

Country: Estonia , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.2 and 54.8. Uncertainty (95%) bounds are between 41 and 58.4.

Country: Estonia , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.8 and 55.5. Uncertainty (95%) bounds are between 41.7 and 58.9.

Country: Estonia , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.6 and 56. Uncertainty (95%) bounds are between 42.4 and 59.3.

Country: Estonia , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 39.6 and 56.3. Uncertainty (95%) bounds are between 43.3 and 59.6.

Country: Estonia , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 40.8 and 56.6. Uncertainty (95%) bounds are between 44.3 and 59.6.

Country: Estonia , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42.2 and 56.7. Uncertainty (95%) bounds are between 45.5 and 59.5.

Country: Estonia , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43.9 and 56.8. Uncertainty (95%) bounds are between 46.9 and 59.1.

Country: Estonia , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46 and 56.7. Uncertainty (95%) bounds are between 48.4 and 58.7.

Country: Estonia , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.9 and 56.6. Uncertainty (95%) bounds are between 49.9 and 58.3.

Country: Estonia , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.8 and 56.7. Uncertainty (95%) bounds are between 50.6 and 58.3.

Country: Estonia , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.4 and 57.5. Uncertainty (95%) bounds are between 50.4 and 59.2.

Country: Estonia , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.4 and 58. Uncertainty (95%) bounds are between 50.5 and 59.7.

Country: Estonia , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.8 and 58.1. Uncertainty (95%) bounds are between 50.9 and 59.9.

Country: Estonia , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.8 and 58.2. Uncertainty (95%) bounds are between 51.6 and 59.9.

Country: Estonia , Year: 2011

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.6 and 59. Uncertainty (95%) bounds are between 51.7 and 60.8.

Country: Estonia , Year: 2012

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.9 and 59.7. Uncertainty (95%) bounds are between 52 and 61.6.

Country: Estonia , Year: 2013

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.5 and 60. Uncertainty (95%) bounds are between 52.7 and 61.8.

Country: Estonia , Year: 2014

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.5 and 60.3. Uncertainty (95%) bounds are between 53.4 and 62.

Country: Estonia , Year: 2015

Estimation Method: Projection. Uncertainty (80%) bounds are between 50.3 and 61.6. Uncertainty (95%) bounds are between 53 and 63.7.

Country: Estonia , Year: 2016

Estimation Method: Projection. Uncertainty (80%) bounds are between 49.2 and 62.9. Uncertainty (95%) bounds are between 52.4 and 65.4.

Country: Estonia , Year: 2017

Estimation Method: Projection. Uncertainty (80%) bounds are between 48.3 and 64.1. Uncertainty (95%) bounds are between 51.9 and 66.9.

Country: Estonia , Year: 2018

Estimation Method: Projection. Uncertainty (80%) bounds are between 47.3 and 65.1. Uncertainty (95%) bounds are between 51.4 and 68.2.

Country: Estonia , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 46.5 and 66. Uncertainty (95%) bounds are between 50.9 and 69.5.

Country: Estonia , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 45.8 and 66.8. Uncertainty (95%) bounds are between 50.6 and 70.6.

Country: Estonia , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 45.1 and 67.7. Uncertainty (95%) bounds are between 50.2 and 71.6.

Country: Estonia , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 44.5 and 68.4. Uncertainty (95%) bounds are between 49.7 and 72.5.

Country: Finland , Year: 1970

Estimation Method: Projection. Uncertainty (80%) bounds are between 46.4 and 70.5. Uncertainty (95%) bounds are between 51.9 and 74.6.

Country: Finland , Year: 1971

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.7 and 70.6. Uncertainty (95%) bounds are between 53 and 74.5.

Country: Finland , Year: 1972

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49 and 71.6. Uncertainty (95%) bounds are between 54.3 and 75.2.

Country: Finland , Year: 1973

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.1 and 72.4. Uncertainty (95%) bounds are between 55.5 and 76.1.

Country: Finland , Year: 1974

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.9 and 73.3. Uncertainty (95%) bounds are between 56.5 and 76.8.

Country: Finland , Year: 1975

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.8 and 74. Uncertainty (95%) bounds are between 57.4 and 77.5.

Country: Finland , Year: 1976

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.5 and 74.7. Uncertainty (95%) bounds are between 58.3 and 78.

Country: Finland , Year: 1977

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.1 and 75.3. Uncertainty (95%) bounds are between 59 and 78.6.

Country: Finland , Year: 1978

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.9 and 75.4. Uncertainty (95%) bounds are between 58.8 and 78.7.

Country: Finland , Year: 1979

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.8 and 75.6. Uncertainty (95%) bounds are between 58.7 and 78.9.

Country: Finland , Year: 1980

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.7 and 75.7. Uncertainty (95%) bounds are between 58.8 and 78.8.

Country: Finland , Year: 1981

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.7 and 75.8. Uncertainty (95%) bounds are between 58.7 and 78.9.

Country: Finland , Year: 1982

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.7 and 75.8. Uncertainty (95%) bounds are between 58.8 and 78.9.

Country: Finland , Year: 1983

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.8 and 75.8. Uncertainty (95%) bounds are between 58.9 and 78.8.

Country: Finland , Year: 1984

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.9 and 75.7. Uncertainty (95%) bounds are between 59.1 and 78.6.

Country: Finland , Year: 1985

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.2 and 75.5. Uncertainty (95%) bounds are between 59.3 and 78.4.

Country: Finland , Year: 1986

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.6 and 75.3. Uncertainty (95%) bounds are between 59.5 and 78.1.

Country: Finland , Year: 1987

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.1 and 75.1. Uncertainty (95%) bounds are between 59.9 and 77.7.

Country: Finland , Year: 1988

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.7 and 74.9. Uncertainty (95%) bounds are between 60.3 and 77.3.

Country: Finland , Year: 1989

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.1 and 74.7. Uncertainty (95%) bounds are between 60.5 and 76.8.

Country: Finland , Year: 1990

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55 and 74.5. Uncertainty (95%) bounds are between 60.6 and 76.5.

Country: Finland , Year: 1991

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.9 and 74.5. Uncertainty (95%) bounds are between 60.6 and 76.4.

Country: Finland , Year: 1992

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.6 and 74.7. Uncertainty (95%) bounds are between 60.4 and 76.4.

Country: Finland , Year: 1993

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54 and 75. Uncertainty (95%) bounds are between 60.1 and 76.7.

Country: Finland , Year: 1994

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.6 and 75.1. Uncertainty (95%) bounds are between 59.7 and 77.1.

Country: Finland , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53 and 75.1. Uncertainty (95%) bounds are between 59.4 and 77.3.

Country: Finland , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.9 and 75.1. Uncertainty (95%) bounds are between 59.2 and 77.2.

Country: Finland , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.8 and 74.8. Uncertainty (95%) bounds are between 59.1 and 76.9.

Country: Finland , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.8 and 74.6. Uncertainty (95%) bounds are between 58.8 and 76.5.

Country: Finland , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.4 and 74.3. Uncertainty (95%) bounds are between 58.6 and 76.1.

Country: Finland , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.8 and 74.2. Uncertainty (95%) bounds are between 58.3 and 76.2.

Country: Finland , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.2 and 74.1. Uncertainty (95%) bounds are between 57.6 and 76.2.

Country: Finland , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.6 and 73.9. Uncertainty (95%) bounds are between 57 and 76.2.

Country: Finland , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.1 and 73.6. Uncertainty (95%) bounds are between 56.6 and 75.9.

Country: Finland , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.7 and 73.2. Uncertainty (95%) bounds are between 56.3 and 75.5.

Country: Finland , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.3 and 72.8. Uncertainty (95%) bounds are between 56.1 and 75.

Country: Finland , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.7 and 72.5. Uncertainty (95%) bounds are between 56 and 74.6.

Country: Finland , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50 and 72.5. Uncertainty (95%) bounds are between 56.2 and 74.4.

Country: Finland , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.1 and 73.5. Uncertainty (95%) bounds are between 57.3 and 75.5.

Country: Finland , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.3 and 74.8. Uncertainty (95%) bounds are between 58.5 and 76.8.

Country: Finland , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.6 and 76.1. Uncertainty (95%) bounds are between 59.9 and 78.2.

Country: Finland , Year: 2011

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.3 and 77.3. Uncertainty (95%) bounds are between 61.5 and 79.4.

Country: Finland , Year: 2012

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.8 and 78.4. Uncertainty (95%) bounds are between 62.9 and 80.4.

Country: Finland , Year: 2013

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.7 and 79.4. Uncertainty (95%) bounds are between 64.5 and 81.2.

Country: Finland , Year: 2014

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.4 and 80.2. Uncertainty (95%) bounds are between 65.8 and 81.9.

Country: Finland , Year: 2015

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.6 and 80.9. Uncertainty (95%) bounds are between 67.1 and 82.5.

Country: Finland , Year: 2016

Estimation Method: Projection. Uncertainty (80%) bounds are between 61.8 and 81.5. Uncertainty (95%) bounds are between 67.5 and 83.2.

Country: Finland , Year: 2017

Estimation Method: Projection. Uncertainty (80%) bounds are between 61.6 and 82.1. Uncertainty (95%) bounds are between 67.6 and 84.

Country: Finland , Year: 2018

Estimation Method: Projection. Uncertainty (80%) bounds are between 61.4 and 82.6. Uncertainty (95%) bounds are between 67.5 and 84.7.

Country: Finland , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 61.1 and 83. Uncertainty (95%) bounds are between 67.3 and 85.4.

Country: Finland , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 60.5 and 83.4. Uncertainty (95%) bounds are between 67.1 and 86.

Country: Finland , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 59.8 and 83.8. Uncertainty (95%) bounds are between 66.8 and 86.4.

Country: Finland , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 59.4 and 84.1. Uncertainty (95%) bounds are between 66.6 and 86.8.

Country: France , Year: 1970

Estimation Method: Projection. Uncertainty (80%) bounds are between 11.2 and 31.4. Uncertainty (95%) bounds are between 14.5 and 36.6.

Country: France , Year: 1971

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 13.5 and 32.5. Uncertainty (95%) bounds are between 16.8 and 37.3.

Country: France , Year: 1972

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 15.5 and 35.2. Uncertainty (95%) bounds are between 19 and 40.

Country: France , Year: 1973

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 17.9 and 38.1. Uncertainty (95%) bounds are between 21.5 and 42.7.

Country: France , Year: 1974

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 20.5 and 41. Uncertainty (95%) bounds are between 24.3 and 45.5.

Country: France , Year: 1975

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 23.5 and 43.7. Uncertainty (95%) bounds are between 27.4 and 48.1.

Country: France , Year: 1976

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 26.7 and 46.4. Uncertainty (95%) bounds are between 30.7 and 50.5.

Country: France , Year: 1977

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 30.3 and 49.1. Uncertainty (95%) bounds are between 34.1 and 52.8.

Country: France , Year: 1978

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 33.8 and 51.6. Uncertainty (95%) bounds are between 37.3 and 55.

Country: France , Year: 1979

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 35.6 and 54.5. Uncertainty (95%) bounds are between 39.6 and 58.1.

Country: France , Year: 1980

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.5 and 57.1. Uncertainty (95%) bounds are between 41.8 and 60.7.

Country: France , Year: 1981

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 39.5 and 59.5. Uncertainty (95%) bounds are between 44 and 63.2.

Country: France , Year: 1982

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 41.6 and 61.7. Uncertainty (95%) bounds are between 46.2 and 65.2.

Country: France , Year: 1983

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.1 and 63.6. Uncertainty (95%) bounds are between 48.6 and 67.

Country: France , Year: 1984

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.6 and 65.3. Uncertainty (95%) bounds are between 50.9 and 68.5.

Country: France , Year: 1985

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.1 and 66.6. Uncertainty (95%) bounds are between 53.3 and 69.5.

Country: France , Year: 1986

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.8 and 67.9. Uncertainty (95%) bounds are between 55.6 and 70.3.

Country: France , Year: 1987

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.4 and 68.8. Uncertainty (95%) bounds are between 57.8 and 71.

Country: France , Year: 1988

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.8 and 69.4. Uncertainty (95%) bounds are between 59.9 and 71.4.

Country: France , Year: 1989

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.8 and 70.1. Uncertainty (95%) bounds are between 60.7 and 72.2.

Country: France , Year: 1990

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.5 and 70.8. Uncertainty (95%) bounds are between 61.5 and 72.9.

Country: France , Year: 1991

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.3 and 71.6. Uncertainty (95%) bounds are between 62.3 and 73.7.

Country: France , Year: 1992

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.3 and 72.2. Uncertainty (95%) bounds are between 63 and 74.4.

Country: France , Year: 1993

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.2 and 72.8. Uncertainty (95%) bounds are between 63.9 and 74.9.

Country: France , Year: 1994

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.1 and 73.3. Uncertainty (95%) bounds are between 64.6 and 75.3.

Country: France , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.4 and 74. Uncertainty (95%) bounds are between 65 and 76.1.

Country: France , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.6 and 74.7. Uncertainty (95%) bounds are between 65.6 and 76.8.

Country: France , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.2 and 75.1. Uncertainty (95%) bounds are between 66 and 77.2.

Country: France , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.8 and 75.5. Uncertainty (95%) bounds are between 66.6 and 77.5.

Country: France , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.6 and 75.7. Uncertainty (95%) bounds are between 67.2 and 77.6.

Country: France , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.3 and 75.8. Uncertainty (95%) bounds are between 67.8 and 77.6.

Country: France , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.9 and 75.9. Uncertainty (95%) bounds are between 68.2 and 77.6.

Country: France , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.4 and 75.8. Uncertainty (95%) bounds are between 68.6 and 77.4.

Country: France , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.1 and 75.6. Uncertainty (95%) bounds are between 69.1 and 77.2.

Country: France , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.9 and 75.5. Uncertainty (95%) bounds are between 69.7 and 76.9.

Country: France , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.2 and 75.6. Uncertainty (95%) bounds are between 70 and 76.9.

Country: France , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.2 and 75.9. Uncertainty (95%) bounds are between 70 and 77.3.

Country: France , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.4 and 76.2. Uncertainty (95%) bounds are between 70.1 and 77.7.

Country: France , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.7 and 76.3. Uncertainty (95%) bounds are between 70.5 and 77.7.

Country: France , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.3 and 76.5. Uncertainty (95%) bounds are between 70.9 and 77.9.

Country: France , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.7 and 76.7. Uncertainty (95%) bounds are between 71.3 and 78.

Country: France , Year: 2011

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.1 and 77.4. Uncertainty (95%) bounds are between 71 and 78.9.

Country: France , Year: 2012

Estimation Method: Projection. Uncertainty (80%) bounds are between 68.1 and 78.2. Uncertainty (95%) bounds are between 70.5 and 80.

Country: France , Year: 2013

Estimation Method: Projection. Uncertainty (80%) bounds are between 66.9 and 79. Uncertainty (95%) bounds are between 69.8 and 81.

Country: France , Year: 2014

Estimation Method: Projection. Uncertainty (80%) bounds are between 65.8 and 79.8. Uncertainty (95%) bounds are between 69.1 and 82.

Country: France , Year: 2015

Estimation Method: Projection. Uncertainty (80%) bounds are between 64.7 and 80.5. Uncertainty (95%) bounds are between 68.5 and 82.8.

Country: France , Year: 2016

Estimation Method: Projection. Uncertainty (80%) bounds are between 63.6 and 81. Uncertainty (95%) bounds are between 67.9 and 83.5.

Country: France , Year: 2017

Estimation Method: Projection. Uncertainty (80%) bounds are between 62.7 and 81.4. Uncertainty (95%) bounds are between 67.5 and 84.2.

Country: France , Year: 2018

Estimation Method: Projection. Uncertainty (80%) bounds are between 61.9 and 81.9. Uncertainty (95%) bounds are between 66.9 and 84.8.

Country: France , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 61 and 82.3. Uncertainty (95%) bounds are between 66.4 and 85.5.

Country: France , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 60.1 and 82.7. Uncertainty (95%) bounds are between 66 and 86.

Country: France , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 59.2 and 83. Uncertainty (95%) bounds are between 65.4 and 86.4.

Country: France , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 58.6 and 83.5. Uncertainty (95%) bounds are between 65 and 86.8.

Country: Georgia , Year: 1970

Estimation Method: Projection. Uncertainty (80%) bounds are between 1.2 and 20.5. Uncertainty (95%) bounds are between 2.4 and 31.8.

Country: Georgia , Year: 1971

Estimation Method: Projection. Uncertainty (80%) bounds are between 1.4 and 20.8. Uncertainty (95%) bounds are between 2.6 and 31.8.

Country: Georgia , Year: 1972

Estimation Method: Projection. Uncertainty (80%) bounds are between 1.5 and 21.1. Uncertainty (95%) bounds are between 2.8 and 31.8.

Country: Georgia , Year: 1973

Estimation Method: Projection. Uncertainty (80%) bounds are between 1.6 and 21.5. Uncertainty (95%) bounds are between 3 and 32.

Country: Georgia , Year: 1974

Estimation Method: Projection. Uncertainty (80%) bounds are between 1.8 and 21.8. Uncertainty (95%) bounds are between 3.2 and 32.1.

Country: Georgia , Year: 1975

Estimation Method: Projection. Uncertainty (80%) bounds are between 2 and 22. Uncertainty (95%) bounds are between 3.5 and 32.1.

Country: Georgia , Year: 1976

Estimation Method: Projection. Uncertainty (80%) bounds are between 2.2 and 22.3. Uncertainty (95%) bounds are between 3.8 and 32.1.

Country: Georgia , Year: 1977

Estimation Method: Projection. Uncertainty (80%) bounds are between 2.4 and 22.7. Uncertainty (95%) bounds are between 4.1 and 32.2.

Country: Georgia , Year: 1978

Estimation Method: Projection. Uncertainty (80%) bounds are between 2.6 and 22.9. Uncertainty (95%) bounds are between 4.3 and 32.1.

Country: Georgia , Year: 1979

Estimation Method: Projection. Uncertainty (80%) bounds are between 2.8 and 23.3. Uncertainty (95%) bounds are between 4.7 and 32.1.

Country: Georgia , Year: 1980

Estimation Method: Projection. Uncertainty (80%) bounds are between 3.1 and 23.5. Uncertainty (95%) bounds are between 5 and 32.2.

Country: Georgia , Year: 1981

Estimation Method: Projection. Uncertainty (80%) bounds are between 3.4 and 23.6. Uncertainty (95%) bounds are between 5.3 and 32.1.

Country: Georgia , Year: 1982

Estimation Method: Projection. Uncertainty (80%) bounds are between 3.6 and 23.9. Uncertainty (95%) bounds are between 5.7 and 32.2.

Country: Georgia , Year: 1983

Estimation Method: Projection. Uncertainty (80%) bounds are between 4 and 24.1. Uncertainty (95%) bounds are between 6.1 and 31.8.

Country: Georgia , Year: 1984

Estimation Method: Projection. Uncertainty (80%) bounds are between 4.4 and 24.3. Uncertainty (95%) bounds are between 6.5 and 31.9.

Country: Georgia , Year: 1985

Estimation Method: Projection. Uncertainty (80%) bounds are between 4.7 and 24.4. Uncertainty (95%) bounds are between 6.9 and 31.7.

Country: Georgia , Year: 1986

Estimation Method: Projection. Uncertainty (80%) bounds are between 5.1 and 24.6. Uncertainty (95%) bounds are between 7.4 and 31.7.

Country: Georgia , Year: 1987

Estimation Method: Projection. Uncertainty (80%) bounds are between 5.5 and 24.8. Uncertainty (95%) bounds are between 8 and 31.5.

Country: Georgia , Year: 1988

Estimation Method: Projection. Uncertainty (80%) bounds are between 6 and 25. Uncertainty (95%) bounds are between 8.4 and 31.6.

Country: Georgia , Year: 1989

Estimation Method: Projection. Uncertainty (80%) bounds are between 6.5 and 25.1. Uncertainty (95%) bounds are between 9 and 31.3.

Country: Georgia , Year: 1990

Estimation Method: Projection. Uncertainty (80%) bounds are between 7 and 25.2. Uncertainty (95%) bounds are between 9.5 and 31.1.

Country: Georgia , Year: 1991

Estimation Method: Projection. Uncertainty (80%) bounds are between 7.5 and 25.3. Uncertainty (95%) bounds are between 10 and 31.1.

Country: Georgia , Year: 1992

Estimation Method: Projection. Uncertainty (80%) bounds are between 8 and 25.4. Uncertainty (95%) bounds are between 10.5 and 30.8.

Country: Georgia , Year: 1993

Estimation Method: Projection. Uncertainty (80%) bounds are between 8.6 and 25.5. Uncertainty (95%) bounds are between 11.1 and 30.6.

Country: Georgia , Year: 1994

Estimation Method: Projection. Uncertainty (80%) bounds are between 9.1 and 25.5. Uncertainty (95%) bounds are between 11.6 and 30.3.

Country: Georgia , Year: 1995

Estimation Method: Projection. Uncertainty (80%) bounds are between 9.7 and 25.5. Uncertainty (95%) bounds are between 12.3 and 30.2.

Country: Georgia , Year: 1996

Estimation Method: Projection. Uncertainty (80%) bounds are between 10.5 and 25.4. Uncertainty (95%) bounds are between 12.9 and 29.6.

Country: Georgia , Year: 1997

Estimation Method: Projection. Uncertainty (80%) bounds are between 11.3 and 25.2. Uncertainty (95%) bounds are between 13.6 and 29.1.

Country: Georgia , Year: 1998

Estimation Method: Projection. Uncertainty (80%) bounds are between 12.1 and 25. Uncertainty (95%) bounds are between 14.3 and 28.4.

Country: Georgia , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 13 and 24.9. Uncertainty (95%) bounds are between 15.1 and 28.

Country: Georgia , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 13.8 and 25.1. Uncertainty (95%) bounds are between 15.8 and 28.1.

Country: Georgia , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 14.6 and 25.9. Uncertainty (95%) bounds are between 16.5 and 28.7.

Country: Georgia , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 15.3 and 26.6. Uncertainty (95%) bounds are between 17.3 and 29.4.

Country: Georgia , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 16.2 and 27.1. Uncertainty (95%) bounds are between 18.3 and 29.8.

Country: Georgia , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 17.4 and 27.6. Uncertainty (95%) bounds are between 19.4 and 30.1.

Country: Georgia , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 18.8 and 27.9. Uncertainty (95%) bounds are between 20.5 and 30.

Country: Georgia , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 19.6 and 28.9. Uncertainty (95%) bounds are between 21.4 and 31.

Country: Georgia , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 20 and 30. Uncertainty (95%) bounds are between 21.9 and 32.3.

Country: Georgia , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 20.5 and 30.9. Uncertainty (95%) bounds are between 22.6 and 33.2.

Country: Georgia , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 21.3 and 31.6. Uncertainty (95%) bounds are between 23.3 and 33.9.

Country: Georgia , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 22 and 32.9. Uncertainty (95%) bounds are between 24.1 and 35.4.

Country: Georgia , Year: 2011

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 22.2 and 34. Uncertainty (95%) bounds are between 24.4 and 36.7.

Country: Georgia , Year: 2012

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 22 and 35. Uncertainty (95%) bounds are between 24.5 and 38.

Country: Georgia , Year: 2013

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 21.9 and 35.7. Uncertainty (95%) bounds are between 24.7 and 38.8.

Country: Georgia , Year: 2014

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 22 and 36.3. Uncertainty (95%) bounds are between 24.8 and 39.6.

Country: Georgia , Year: 2015

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 22.1 and 36.7. Uncertainty (95%) bounds are between 25 and 40.1.

Country: Georgia , Year: 2016

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 22.5 and 37.1. Uncertainty (95%) bounds are between 25.2 and 40.4.

Country: Georgia , Year: 2017

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 22.9 and 37.4. Uncertainty (95%) bounds are between 25.6 and 40.7.

Country: Georgia , Year: 2018

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 23.3 and 37.8. Uncertainty (95%) bounds are between 26 and 41.3.

Country: Georgia , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 23 and 38.8. Uncertainty (95%) bounds are between 26 and 42.5.

Country: Georgia , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 22.4 and 40. Uncertainty (95%) bounds are between 25.8 and 43.9.

Country: Georgia , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 22.1 and 41.1. Uncertainty (95%) bounds are between 25.7 and 45.5.

Country: Georgia , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 21.8 and 42.2. Uncertainty (95%) bounds are between 25.7 and 47.

Country: Germany , Year: 1970

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.6 and 53.2. Uncertainty (95%) bounds are between 40.9 and 56.3.

Country: Germany , Year: 1971

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 41.4 and 56.3. Uncertainty (95%) bounds are between 44.7 and 58.9.

Country: Germany , Year: 1972

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 45.5 and 59.7. Uncertainty (95%) bounds are between 48.7 and 62.1.

Country: Germany , Year: 1973

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 45.9 and 61.9. Uncertainty (95%) bounds are between 49.6 and 64.4.

Country: Germany , Year: 1974

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.5 and 63.7. Uncertainty (95%) bounds are between 50.4 and 66.5.

Country: Germany , Year: 1975

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.3 and 65.2. Uncertainty (95%) bounds are between 51.4 and 68.2.

Country: Germany , Year: 1976

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.9 and 66.5. Uncertainty (95%) bounds are between 52.2 and 69.6.

Country: Germany , Year: 1977

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.8 and 67.6. Uncertainty (95%) bounds are between 53.1 and 70.8.

Country: Germany , Year: 1978

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.4 and 68.6. Uncertainty (95%) bounds are between 54 and 71.9.

Country: Germany , Year: 1979

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.3 and 69.4. Uncertainty (95%) bounds are between 54.8 and 72.6.

Country: Germany , Year: 1980

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.1 and 70.1. Uncertainty (95%) bounds are between 55.7 and 73.4.

Country: Germany , Year: 1981

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.3 and 70.6. Uncertainty (95%) bounds are between 56.6 and 73.8.

Country: Germany , Year: 1982

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.3 and 71.1. Uncertainty (95%) bounds are between 57.5 and 74.

Country: Germany , Year: 1983

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.3 and 71.2. Uncertainty (95%) bounds are between 58.3 and 74.3.

Country: Germany , Year: 1984

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.3 and 71.4. Uncertainty (95%) bounds are between 59 and 74.3.

Country: Germany , Year: 1985

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.2 and 71.6. Uncertainty (95%) bounds are between 59.7 and 74.3.

Country: Germany , Year: 1986

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.6 and 71.6. Uncertainty (95%) bounds are between 60 and 74.3.

Country: Germany , Year: 1987

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.9 and 71.5. Uncertainty (95%) bounds are between 60.3 and 74.2.

Country: Germany , Year: 1988

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57 and 71.3. Uncertainty (95%) bounds are between 60.4 and 74.

Country: Germany , Year: 1989

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.4 and 71.1. Uncertainty (95%) bounds are between 60.6 and 73.6.

Country: Germany , Year: 1990

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.7 and 70.8. Uncertainty (95%) bounds are between 60.7 and 73.2.

Country: Germany , Year: 1991

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.1 and 70.7. Uncertainty (95%) bounds are between 60.8 and 73.2.

Country: Germany , Year: 1992

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58 and 70.7. Uncertainty (95%) bounds are between 60.8 and 73.1.

Country: Germany , Year: 1993

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.3 and 71. Uncertainty (95%) bounds are between 60.5 and 73.6.

Country: Germany , Year: 1994

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.7 and 71.5. Uncertainty (95%) bounds are between 60.2 and 74.2.

Country: Germany , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.2 and 71.9. Uncertainty (95%) bounds are between 59.9 and 74.7.

Country: Germany , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.8 and 72.2. Uncertainty (95%) bounds are between 59.6 and 75.1.

Country: Germany , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.5 and 72.4. Uncertainty (95%) bounds are between 59.4 and 75.4.

Country: Germany , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.3 and 72.6. Uncertainty (95%) bounds are between 59.3 and 75.6.

Country: Germany , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.1 and 72.7. Uncertainty (95%) bounds are between 59.3 and 75.7.

Country: Germany , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.5 and 72.7. Uncertainty (95%) bounds are between 59.4 and 75.6.

Country: Germany , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.6 and 72.6. Uncertainty (95%) bounds are between 59.6 and 75.5.

Country: Germany , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56 and 72.4. Uncertainty (95%) bounds are between 59.9 and 75.3.

Country: Germany , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.7 and 72.2. Uncertainty (95%) bounds are between 60.3 and 75.

Country: Germany , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.4 and 72.1. Uncertainty (95%) bounds are between 60.9 and 74.7.

Country: Germany , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.4 and 72.1. Uncertainty (95%) bounds are between 61.5 and 74.5.

Country: Germany , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.4 and 72.6. Uncertainty (95%) bounds are between 62.6 and 74.9.

Country: Germany , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.9 and 73.3. Uncertainty (95%) bounds are between 63.8 and 75.6.

Country: Germany , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.8 and 74.3. Uncertainty (95%) bounds are between 65.4 and 76.3.

Country: Germany , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.2 and 75.6. Uncertainty (95%) bounds are between 67.7 and 77.5.

Country: Germany , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.7 and 77. Uncertainty (95%) bounds are between 69.9 and 78.6.

Country: Germany , Year: 2011

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 69.2 and 77.9. Uncertainty (95%) bounds are between 71.4 and 79.3.

Country: Germany , Year: 2012

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 68.7 and 77.9. Uncertainty (95%) bounds are between 71 and 79.5.

Country: Germany , Year: 2013

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 67.5 and 77.6. Uncertainty (95%) bounds are between 69.9 and 79.3.

Country: Germany , Year: 2014

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.8 and 76.8. Uncertainty (95%) bounds are between 68.5 and 78.8.

Country: Germany , Year: 2015

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.3 and 75.8. Uncertainty (95%) bounds are between 66.9 and 77.8.

Country: Germany , Year: 2016

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.7 and 74.5. Uncertainty (95%) bounds are between 65.5 and 76.6.

Country: Germany , Year: 2017

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.3 and 73.3. Uncertainty (95%) bounds are between 64.2 and 75.4.

Country: Germany , Year: 2018

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60 and 72.3. Uncertainty (95%) bounds are between 62.9 and 74.5.

Country: Germany , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 58.5 and 72.3. Uncertainty (95%) bounds are between 61.7 and 74.8.

Country: Germany , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 56.9 and 72.8. Uncertainty (95%) bounds are between 60.6 and 75.6.

Country: Germany , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 55.4 and 73.4. Uncertainty (95%) bounds are between 59.6 and 76.5.

Country: Germany , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 54.1 and 74. Uncertainty (95%) bounds are between 58.8 and 77.3.

Country: Greece , Year: 1970

Estimation Method: Projection. Uncertainty (80%) bounds are between 5.1 and 31. Uncertainty (95%) bounds are between 8.2 and 39.5.

Country: Greece , Year: 1971

Estimation Method: Projection. Uncertainty (80%) bounds are between 5.5 and 31.3. Uncertainty (95%) bounds are between 8.7 and 39.7.

Country: Greece , Year: 1972

Estimation Method: Projection. Uncertainty (80%) bounds are between 6 and 31.9. Uncertainty (95%) bounds are between 9.3 and 39.9.

Country: Greece , Year: 1973

Estimation Method: Projection. Uncertainty (80%) bounds are between 6.5 and 32.2. Uncertainty (95%) bounds are between 9.9 and 40.1.

Country: Greece , Year: 1974

Estimation Method: Projection. Uncertainty (80%) bounds are between 7.1 and 32.7. Uncertainty (95%) bounds are between 10.5 and 40.2.

Country: Greece , Year: 1975

Estimation Method: Projection. Uncertainty (80%) bounds are between 7.7 and 33. Uncertainty (95%) bounds are between 11.2 and 40.5.

Country: Greece , Year: 1976

Estimation Method: Projection. Uncertainty (80%) bounds are between 8.3 and 33.5. Uncertainty (95%) bounds are between 11.9 and 40.7.

Country: Greece , Year: 1977

Estimation Method: Projection. Uncertainty (80%) bounds are between 9.2 and 33.8. Uncertainty (95%) bounds are between 12.7 and 40.8.

Country: Greece , Year: 1978

Estimation Method: Projection. Uncertainty (80%) bounds are between 10 and 34.2. Uncertainty (95%) bounds are between 13.6 and 40.8.

Country: Greece , Year: 1979

Estimation Method: Projection. Uncertainty (80%) bounds are between 10.8 and 34.4. Uncertainty (95%) bounds are between 14.5 and 40.9.

Country: Greece , Year: 1980

Estimation Method: Projection. Uncertainty (80%) bounds are between 11.9 and 34.7. Uncertainty (95%) bounds are between 15.4 and 41.

Country: Greece , Year: 1981

Estimation Method: Projection. Uncertainty (80%) bounds are between 13 and 34.8. Uncertainty (95%) bounds are between 16.5 and 40.7.

Country: Greece , Year: 1982

Estimation Method: Projection. Uncertainty (80%) bounds are between 14.2 and 34.9. Uncertainty (95%) bounds are between 17.6 and 40.3.

Country: Greece , Year: 1983

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 15.4 and 35.2. Uncertainty (95%) bounds are between 18.8 and 40.

Country: Greece , Year: 1984

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 15.4 and 35.9. Uncertainty (95%) bounds are between 18.9 and 40.8.

Country: Greece , Year: 1985

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 15.5 and 36.6. Uncertainty (95%) bounds are between 18.9 and 41.9.

Country: Greece , Year: 1986

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 15.5 and 37.2. Uncertainty (95%) bounds are between 19.1 and 42.4.

Country: Greece , Year: 1987

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 15.4 and 37.8. Uncertainty (95%) bounds are between 19.3 and 43.3.

Country: Greece , Year: 1988

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 15.7 and 38.3. Uncertainty (95%) bounds are between 19.5 and 43.6.

Country: Greece , Year: 1989

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 15.9 and 38.8. Uncertainty (95%) bounds are between 19.8 and 44.1.

Country: Greece , Year: 1990

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 16.3 and 39.1. Uncertainty (95%) bounds are between 20.2 and 44.5.

Country: Greece , Year: 1991

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 16.5 and 39.5. Uncertainty (95%) bounds are between 20.6 and 44.9.

Country: Greece , Year: 1992

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 17 and 39.8. Uncertainty (95%) bounds are between 21 and 45.4.

Country: Greece , Year: 1993

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 17.7 and 40.2. Uncertainty (95%) bounds are between 21.6 and 45.3.

Country: Greece , Year: 1994

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 18.2 and 40.4. Uncertainty (95%) bounds are between 22.2 and 45.4.

Country: Greece , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 19 and 40.6. Uncertainty (95%) bounds are between 22.8 and 45.4.

Country: Greece , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 19.6 and 40.6. Uncertainty (95%) bounds are between 23.5 and 45.5.

Country: Greece , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 20.3 and 40.6. Uncertainty (95%) bounds are between 24.3 and 45.3.

Country: Greece , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 21.4 and 40.7. Uncertainty (95%) bounds are between 25.2 and 44.9.

Country: Greece , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 22.5 and 40.6. Uncertainty (95%) bounds are between 26.4 and 44.4.

Country: Greece , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 23.6 and 42.5. Uncertainty (95%) bounds are between 27.7 and 46.4.

Country: Greece , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 25 and 44.2. Uncertainty (95%) bounds are between 29.2 and 48.2.

Country: Greece , Year: 2002

Estimation Method: Projection. Uncertainty (80%) bounds are between 24.7 and 46. Uncertainty (95%) bounds are between 29.2 and 50.2.

Country: Greece , Year: 2003

Estimation Method: Projection. Uncertainty (80%) bounds are between 24.4 and 47.4. Uncertainty (95%) bounds are between 29.1 and 52.1.

Country: Greece , Year: 2004

Estimation Method: Projection. Uncertainty (80%) bounds are between 24.2 and 49. Uncertainty (95%) bounds are between 29.3 and 53.7.

Country: Greece , Year: 2005

Estimation Method: Projection. Uncertainty (80%) bounds are between 24 and 50.4. Uncertainty (95%) bounds are between 29.4 and 55.4.

Country: Greece , Year: 2006

Estimation Method: Projection. Uncertainty (80%) bounds are between 24.1 and 51.7. Uncertainty (95%) bounds are between 29.5 and 57.1.

Country: Greece , Year: 2007

Estimation Method: Projection. Uncertainty (80%) bounds are between 24 and 52.9. Uncertainty (95%) bounds are between 29.8 and 58.6.

Country: Greece , Year: 2008

Estimation Method: Projection. Uncertainty (80%) bounds are between 24 and 54.1. Uncertainty (95%) bounds are between 30 and 60.1.

Country: Greece , Year: 2009

Estimation Method: Projection. Uncertainty (80%) bounds are between 23.9 and 55.3. Uncertainty (95%) bounds are between 30.2 and 61.4.

Country: Greece , Year: 2010

Estimation Method: Projection. Uncertainty (80%) bounds are between 23.8 and 56.4. Uncertainty (95%) bounds are between 30.2 and 62.8.

Country: Greece , Year: 2011

Estimation Method: Projection. Uncertainty (80%) bounds are between 23.8 and 57.5. Uncertainty (95%) bounds are between 30.5 and 64.1.

Country: Greece , Year: 2012

Estimation Method: Projection. Uncertainty (80%) bounds are between 23.7 and 58.5. Uncertainty (95%) bounds are between 30.7 and 65.1.

Country: Greece , Year: 2013

Estimation Method: Projection. Uncertainty (80%) bounds are between 24.1 and 59.4. Uncertainty (95%) bounds are between 31.1 and 66.3.

Country: Greece , Year: 2014

Estimation Method: Projection. Uncertainty (80%) bounds are between 24 and 60.3. Uncertainty (95%) bounds are between 31.2 and 67.4.

Country: Greece , Year: 2015

Estimation Method: Projection. Uncertainty (80%) bounds are between 24.3 and 61.2. Uncertainty (95%) bounds are between 31.6 and 68.4.

Country: Greece , Year: 2016

Estimation Method: Projection. Uncertainty (80%) bounds are between 24.4 and 62.2. Uncertainty (95%) bounds are between 31.8 and 69.4.

Country: Greece , Year: 2017

Estimation Method: Projection. Uncertainty (80%) bounds are between 24.5 and 63. Uncertainty (95%) bounds are between 32 and 70.3.

Country: Greece , Year: 2018

Estimation Method: Projection. Uncertainty (80%) bounds are between 24.8 and 63.8. Uncertainty (95%) bounds are between 32.2 and 71.2.

Country: Greece , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 24.8 and 64.6. Uncertainty (95%) bounds are between 32.6 and 72.1.

Country: Greece , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 24.9 and 65.3. Uncertainty (95%) bounds are between 32.9 and 73.

Country: Greece , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 25.1 and 66.1. Uncertainty (95%) bounds are between 33.1 and 73.5.

Country: Greece , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 25.3 and 66.9. Uncertainty (95%) bounds are between 33.5 and 74.4.

Country: Hungary , Year: 1970

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 22.6 and 39.5. Uncertainty (95%) bounds are between 25.8 and 43.5.

Country: Hungary , Year: 1971

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 25.2 and 42.7. Uncertainty (95%) bounds are between 28.6 and 46.8.

Country: Hungary , Year: 1972

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 28.5 and 45.7. Uncertainty (95%) bounds are between 31.8 and 49.5.

Country: Hungary , Year: 1973

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 30.7 and 48.6. Uncertainty (95%) bounds are between 34.2 and 52.5.

Country: Hungary , Year: 1974

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 33.3 and 51.1. Uncertainty (95%) bounds are between 37 and 54.9.

Country: Hungary , Year: 1975

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 36.3 and 54.1. Uncertainty (95%) bounds are between 40.1 and 57.8.

Country: Hungary , Year: 1976

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.2 and 55.9. Uncertainty (95%) bounds are between 41.1 and 59.9.

Country: Hungary , Year: 1977

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.3 and 57.3. Uncertainty (95%) bounds are between 42.2 and 61.4.

Country: Hungary , Year: 1978

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.5 and 58.8. Uncertainty (95%) bounds are between 42.9 and 62.8.

Country: Hungary , Year: 1979

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.8 and 60. Uncertainty (95%) bounds are between 43.6 and 64.

Country: Hungary , Year: 1980

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 39.6 and 60.9. Uncertainty (95%) bounds are between 44.4 and 65.1.

Country: Hungary , Year: 1981

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 40.5 and 62. Uncertainty (95%) bounds are between 45.3 and 65.8.

Country: Hungary , Year: 1982

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 41.3 and 62.7. Uncertainty (95%) bounds are between 46.4 and 66.6.

Country: Hungary , Year: 1983

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42.7 and 63.3. Uncertainty (95%) bounds are between 47.6 and 67.

Country: Hungary , Year: 1984

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.1 and 63.8. Uncertainty (95%) bounds are between 48.7 and 67.5.

Country: Hungary , Year: 1985

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.1 and 64.2. Uncertainty (95%) bounds are between 50 and 67.7.

Country: Hungary , Year: 1986

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.5 and 64.6. Uncertainty (95%) bounds are between 51.5 and 67.8.

Country: Hungary , Year: 1987

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48 and 65.1. Uncertainty (95%) bounds are between 51.9 and 68.1.

Country: Hungary , Year: 1988

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.5 and 65.7. Uncertainty (95%) bounds are between 52.6 and 68.6.

Country: Hungary , Year: 1989

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.1 and 66.2. Uncertainty (95%) bounds are between 53.3 and 69.

Country: Hungary , Year: 1990

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.9 and 66.8. Uncertainty (95%) bounds are between 54.1 and 69.4.

Country: Hungary , Year: 1991

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.4 and 67.5. Uncertainty (95%) bounds are between 54.9 and 70.1.

Country: Hungary , Year: 1992

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.2 and 68.1. Uncertainty (95%) bounds are between 55.7 and 70.7.

Country: Hungary , Year: 1993

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.7 and 68.7. Uncertainty (95%) bounds are between 56.3 and 71.3.

Country: Hungary , Year: 1994

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.9 and 69.2. Uncertainty (95%) bounds are between 55.7 and 72.

Country: Hungary , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50 and 69.5. Uncertainty (95%) bounds are between 55.1 and 72.5.

Country: Hungary , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.2 and 69.7. Uncertainty (95%) bounds are between 54.5 and 72.8.

Country: Hungary , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.3 and 69.8. Uncertainty (95%) bounds are between 53.8 and 73.1.

Country: Hungary , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.6 and 69.8. Uncertainty (95%) bounds are between 53.3 and 73.3.

Country: Hungary , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.9 and 69.7. Uncertainty (95%) bounds are between 52.7 and 73.3.

Country: Hungary , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.3 and 69.6. Uncertainty (95%) bounds are between 52.3 and 73.2.

Country: Hungary , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 45.9 and 69.5. Uncertainty (95%) bounds are between 51.8 and 73.1.

Country: Hungary , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 45.2 and 69.2. Uncertainty (95%) bounds are between 51.4 and 73.2.

Country: Hungary , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 45 and 69. Uncertainty (95%) bounds are between 51.1 and 73.

Country: Hungary , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.7 and 68.8. Uncertainty (95%) bounds are between 50.7 and 72.7.

Country: Hungary , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.3 and 68.6. Uncertainty (95%) bounds are between 50.5 and 72.4.

Country: Hungary , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.2 and 68.3. Uncertainty (95%) bounds are between 50.2 and 72.2.

Country: Hungary , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.2 and 68. Uncertainty (95%) bounds are between 50.2 and 72.

Country: Hungary , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.2 and 67.9. Uncertainty (95%) bounds are between 50.1 and 71.9.

Country: Hungary , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43.7 and 68.2. Uncertainty (95%) bounds are between 50 and 72.4.

Country: Hungary , Year: 2010

Estimation Method: Projection. Uncertainty (80%) bounds are between 43.3 and 68.7. Uncertainty (95%) bounds are between 49.5 and 73.1.

Country: Hungary , Year: 2011

Estimation Method: Projection. Uncertainty (80%) bounds are between 43.1 and 69.4. Uncertainty (95%) bounds are between 49.3 and 74.

Country: Hungary , Year: 2012

Estimation Method: Projection. Uncertainty (80%) bounds are between 42.5 and 70. Uncertainty (95%) bounds are between 49.1 and 74.7.

Country: Hungary , Year: 2013

Estimation Method: Projection. Uncertainty (80%) bounds are between 42.1 and 70.7. Uncertainty (95%) bounds are between 48.8 and 75.6.

Country: Hungary , Year: 2014

Estimation Method: Projection. Uncertainty (80%) bounds are between 41.7 and 71.3. Uncertainty (95%) bounds are between 48.7 and 76.4.

Country: Hungary , Year: 2015

Estimation Method: Projection. Uncertainty (80%) bounds are between 41.3 and 71.9. Uncertainty (95%) bounds are between 48.5 and 77.1.

Country: Hungary , Year: 2016

Estimation Method: Projection. Uncertainty (80%) bounds are between 41.2 and 72.6. Uncertainty (95%) bounds are between 48.4 and 77.8.

Country: Hungary , Year: 2017

Estimation Method: Projection. Uncertainty (80%) bounds are between 40.9 and 73.1. Uncertainty (95%) bounds are between 48.2 and 78.4.

Country: Hungary , Year: 2018

Estimation Method: Projection. Uncertainty (80%) bounds are between 40.6 and 73.6. Uncertainty (95%) bounds are between 48 and 79.

Country: Hungary , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 40.1 and 74.3. Uncertainty (95%) bounds are between 48 and 79.5.

Country: Hungary , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 39.5 and 74.8. Uncertainty (95%) bounds are between 47.8 and 80.2.

Country: Hungary , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 39.3 and 75.4. Uncertainty (95%) bounds are between 47.7 and 80.7.

Country: Hungary , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 39.1 and 75.9. Uncertainty (95%) bounds are between 47.6 and 81.2.

Country: Ireland , Year: 1970

Estimation Method: Projection. Uncertainty (80%) bounds are between 15.8 and 66.1. Uncertainty (95%) bounds are between 26.8 and 74.

Country: Ireland , Year: 1971

Estimation Method: Projection. Uncertainty (80%) bounds are between 16.9 and 66.4. Uncertainty (95%) bounds are between 27.9 and 74.

Country: Ireland , Year: 1972

Estimation Method: Projection. Uncertainty (80%) bounds are between 18.1 and 66.6. Uncertainty (95%) bounds are between 29 and 73.9.

Country: Ireland , Year: 1973

Estimation Method: Projection. Uncertainty (80%) bounds are between 19.2 and 66.9. Uncertainty (95%) bounds are between 30.2 and 73.9.

Country: Ireland , Year: 1974

Estimation Method: Projection. Uncertainty (80%) bounds are between 20.6 and 67. Uncertainty (95%) bounds are between 31.2 and 74.

Country: Ireland , Year: 1975

Estimation Method: Projection. Uncertainty (80%) bounds are between 22.1 and 67.1. Uncertainty (95%) bounds are between 32.4 and 74.1.

Country: Ireland , Year: 1976

Estimation Method: Projection. Uncertainty (80%) bounds are between 23.2 and 67.4. Uncertainty (95%) bounds are between 33.5 and 74.1.

Country: Ireland , Year: 1977

Estimation Method: Projection. Uncertainty (80%) bounds are between 24.5 and 67.5. Uncertainty (95%) bounds are between 34.5 and 74.1.

Country: Ireland , Year: 1978

Estimation Method: Projection. Uncertainty (80%) bounds are between 25.5 and 67.6. Uncertainty (95%) bounds are between 35.8 and 74.1.

Country: Ireland , Year: 1979

Estimation Method: Projection. Uncertainty (80%) bounds are between 27.1 and 67.8. Uncertainty (95%) bounds are between 36.9 and 74.1.

Country: Ireland , Year: 1980

Estimation Method: Projection. Uncertainty (80%) bounds are between 28.7 and 67.9. Uncertainty (95%) bounds are between 38.1 and 73.8.

Country: Ireland , Year: 1981

Estimation Method: Projection. Uncertainty (80%) bounds are between 30.3 and 67.9. Uncertainty (95%) bounds are between 39.4 and 73.6.

Country: Ireland , Year: 1982

Estimation Method: Projection. Uncertainty (80%) bounds are between 31.8 and 68. Uncertainty (95%) bounds are between 40.5 and 73.6.

Country: Ireland , Year: 1983

Estimation Method: Projection. Uncertainty (80%) bounds are between 33.2 and 68.1. Uncertainty (95%) bounds are between 41.8 and 73.4.

Country: Ireland , Year: 1984

Estimation Method: Projection. Uncertainty (80%) bounds are between 34.8 and 68. Uncertainty (95%) bounds are between 42.9 and 73.4.

Country: Ireland , Year: 1985

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.2 and 68. Uncertainty (95%) bounds are between 44.1 and 73.1.

Country: Ireland , Year: 1986

Estimation Method: Projection. Uncertainty (80%) bounds are between 37.5 and 68. Uncertainty (95%) bounds are between 45.2 and 72.8.

Country: Ireland , Year: 1987

Estimation Method: Projection. Uncertainty (80%) bounds are between 39.1 and 68. Uncertainty (95%) bounds are between 46.4 and 72.6.

Country: Ireland , Year: 1988

Estimation Method: Projection. Uncertainty (80%) bounds are between 40.4 and 67.9. Uncertainty (95%) bounds are between 47.6 and 72.3.

Country: Ireland , Year: 1989

Estimation Method: Projection. Uncertainty (80%) bounds are between 42.1 and 67.9. Uncertainty (95%) bounds are between 48.8 and 72.

Country: Ireland , Year: 1990

Estimation Method: Projection. Uncertainty (80%) bounds are between 43.4 and 67.9. Uncertainty (95%) bounds are between 49.8 and 71.9.

Country: Ireland , Year: 1991

Estimation Method: Projection. Uncertainty (80%) bounds are between 44.7 and 68.2. Uncertainty (95%) bounds are between 50.8 and 71.9.

Country: Ireland , Year: 1992

Estimation Method: Projection. Uncertainty (80%) bounds are between 45.9 and 68.5. Uncertainty (95%) bounds are between 52 and 71.9.

Country: Ireland , Year: 1993

Estimation Method: Projection. Uncertainty (80%) bounds are between 47.1 and 68.7. Uncertainty (95%) bounds are between 53 and 71.9.

Country: Ireland , Year: 1994

Estimation Method: Projection. Uncertainty (80%) bounds are between 48.1 and 68.9. Uncertainty (95%) bounds are between 54.1 and 71.8.

Country: Ireland , Year: 1995

Estimation Method: Projection. Uncertainty (80%) bounds are between 49.1 and 69.1. Uncertainty (95%) bounds are between 55 and 71.8.

Country: Ireland , Year: 1996

Estimation Method: Projection. Uncertainty (80%) bounds are between 50 and 69.1. Uncertainty (95%) bounds are between 56.1 and 71.6.

Country: Ireland , Year: 1997

Estimation Method: Projection. Uncertainty (80%) bounds are between 50.8 and 69.1. Uncertainty (95%) bounds are between 57 and 71.3.

Country: Ireland , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.6 and 69. Uncertainty (95%) bounds are between 57.7 and 70.8.

Country: Ireland , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.4 and 69.1. Uncertainty (95%) bounds are between 57.7 and 70.9.

Country: Ireland , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.1 and 69. Uncertainty (95%) bounds are between 57.7 and 70.8.

Country: Ireland , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51 and 68.5. Uncertainty (95%) bounds are between 57.7 and 70.3.

Country: Ireland , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.8 and 67.9. Uncertainty (95%) bounds are between 57.7 and 69.5.

Country: Ireland , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.7 and 67.5. Uncertainty (95%) bounds are between 57.8 and 69.1.

Country: Ireland , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.9 and 67.2. Uncertainty (95%) bounds are between 57.3 and 68.9.

Country: Ireland , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.6 and 67.7. Uncertainty (95%) bounds are between 56.9 and 69.5.

Country: Ireland , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.5 and 68.2. Uncertainty (95%) bounds are between 56.8 and 70.2.

Country: Ireland , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.7 and 68.8. Uncertainty (95%) bounds are between 56.8 and 70.8.

Country: Ireland , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.8 and 69.2. Uncertainty (95%) bounds are between 56.9 and 71.3.

Country: Ireland , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50 and 69.5. Uncertainty (95%) bounds are between 57 and 71.5.

Country: Ireland , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.3 and 69.9. Uncertainty (95%) bounds are between 57.3 and 71.9.

Country: Ireland , Year: 2011

Estimation Method: Projection. Uncertainty (80%) bounds are between 49.9 and 70.5. Uncertainty (95%) bounds are between 56.9 and 72.8.

Country: Ireland , Year: 2012

Estimation Method: Projection. Uncertainty (80%) bounds are between 49.2 and 71.2. Uncertainty (95%) bounds are between 56.4 and 73.8.

Country: Ireland , Year: 2013

Estimation Method: Projection. Uncertainty (80%) bounds are between 48.7 and 71.9. Uncertainty (95%) bounds are between 55.9 and 74.8.

Country: Ireland , Year: 2014

Estimation Method: Projection. Uncertainty (80%) bounds are between 48.3 and 72.6. Uncertainty (95%) bounds are between 55.3 and 75.8.

Country: Ireland , Year: 2015

Estimation Method: Projection. Uncertainty (80%) bounds are between 47.8 and 73.2. Uncertainty (95%) bounds are between 54.8 and 76.7.

Country: Ireland , Year: 2016

Estimation Method: Projection. Uncertainty (80%) bounds are between 47.2 and 73.9. Uncertainty (95%) bounds are between 54.4 and 77.5.

Country: Ireland , Year: 2017

Estimation Method: Projection. Uncertainty (80%) bounds are between 46.5 and 74.5. Uncertainty (95%) bounds are between 53.9 and 78.3.

Country: Ireland , Year: 2018

Estimation Method: Projection. Uncertainty (80%) bounds are between 46.1 and 75.1. Uncertainty (95%) bounds are between 53.5 and 78.9.

Country: Ireland , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 45.5 and 75.5. Uncertainty (95%) bounds are between 53.2 and 79.6.

Country: Ireland , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 45 and 76. Uncertainty (95%) bounds are between 52.8 and 80.1.

Country: Ireland , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 44.7 and 76.4. Uncertainty (95%) bounds are between 52.5 and 80.7.

Country: Ireland , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 44 and 76.9. Uncertainty (95%) bounds are between 52 and 81.3.

Country: Israel , Year: 1970

Estimation Method: Projection. Uncertainty (80%) bounds are between 15 and 56. Uncertainty (95%) bounds are between 22.5 and 63.8.

Country: Israel , Year: 1971

Estimation Method: Projection. Uncertainty (80%) bounds are between 16.2 and 56.1. Uncertainty (95%) bounds are between 23.6 and 63.8.

Country: Israel , Year: 1972

Estimation Method: Projection. Uncertainty (80%) bounds are between 17.1 and 56.2. Uncertainty (95%) bounds are between 24.6 and 63.7.

Country: Israel , Year: 1973

Estimation Method: Projection. Uncertainty (80%) bounds are between 18.1 and 56.2. Uncertainty (95%) bounds are between 25.6 and 63.4.

Country: Israel , Year: 1974

Estimation Method: Projection. Uncertainty (80%) bounds are between 19.3 and 56.3. Uncertainty (95%) bounds are between 26.7 and 63.3.

Country: Israel , Year: 1975

Estimation Method: Projection. Uncertainty (80%) bounds are between 20.6 and 56.4. Uncertainty (95%) bounds are between 27.5 and 63.

Country: Israel , Year: 1976

Estimation Method: Projection. Uncertainty (80%) bounds are between 21.8 and 56.3. Uncertainty (95%) bounds are between 28.7 and 62.6.

Country: Israel , Year: 1977

Estimation Method: Projection. Uncertainty (80%) bounds are between 23.3 and 56.2. Uncertainty (95%) bounds are between 29.8 and 62.6.

Country: Israel , Year: 1978

Estimation Method: Projection. Uncertainty (80%) bounds are between 24.5 and 56.3. Uncertainty (95%) bounds are between 31.1 and 62.1.

Country: Israel , Year: 1979

Estimation Method: Projection. Uncertainty (80%) bounds are between 25.8 and 56.2. Uncertainty (95%) bounds are between 32.2 and 61.8.

Country: Israel , Year: 1980

Estimation Method: Projection. Uncertainty (80%) bounds are between 27.3 and 56. Uncertainty (95%) bounds are between 33.3 and 61.4.

Country: Israel , Year: 1981

Estimation Method: Projection. Uncertainty (80%) bounds are between 28.5 and 56. Uncertainty (95%) bounds are between 34.6 and 61.

Country: Israel , Year: 1982

Estimation Method: Projection. Uncertainty (80%) bounds are between 30.1 and 55.7. Uncertainty (95%) bounds are between 35.9 and 60.5.

Country: Israel , Year: 1983

Estimation Method: Projection. Uncertainty (80%) bounds are between 31.5 and 55.5. Uncertainty (95%) bounds are between 37.2 and 59.9.

Country: Israel , Year: 1984

Estimation Method: Projection. Uncertainty (80%) bounds are between 33 and 55.2. Uncertainty (95%) bounds are between 38.4 and 59.3.

Country: Israel , Year: 1985

Estimation Method: Projection. Uncertainty (80%) bounds are between 34.5 and 55. Uncertainty (95%) bounds are between 39.7 and 58.5.

Country: Israel , Year: 1986

Estimation Method: Projection. Uncertainty (80%) bounds are between 35.7 and 54.8. Uncertainty (95%) bounds are between 41 and 57.8.

Country: Israel , Year: 1987

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.4 and 54.8. Uncertainty (95%) bounds are between 42.2 and 57.4.

Country: Israel , Year: 1988

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.1 and 55.6. Uncertainty (95%) bounds are between 42 and 58.5.

Country: Israel , Year: 1989

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.8 and 56.6. Uncertainty (95%) bounds are between 41.7 and 59.7.

Country: Israel , Year: 1990

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.3 and 57.5. Uncertainty (95%) bounds are between 41.4 and 61.

Country: Israel , Year: 1991

Estimation Method: Projection. Uncertainty (80%) bounds are between 35.8 and 58.4. Uncertainty (95%) bounds are between 41.1 and 62.2.

Country: Israel , Year: 1992

Estimation Method: Projection. Uncertainty (80%) bounds are between 35 and 59.1. Uncertainty (95%) bounds are between 40.8 and 63.4.

Country: Israel , Year: 1993

Estimation Method: Projection. Uncertainty (80%) bounds are between 34.5 and 59.9. Uncertainty (95%) bounds are between 40.5 and 64.3.

Country: Israel , Year: 1994

Estimation Method: Projection. Uncertainty (80%) bounds are between 34 and 60.6. Uncertainty (95%) bounds are between 40.1 and 65.2.

Country: Israel , Year: 1995

Estimation Method: Projection. Uncertainty (80%) bounds are between 33.8 and 61.2. Uncertainty (95%) bounds are between 39.9 and 66.1.

Country: Israel , Year: 1996

Estimation Method: Projection. Uncertainty (80%) bounds are between 33.2 and 61.8. Uncertainty (95%) bounds are between 39.7 and 66.7.

Country: Israel , Year: 1997

Estimation Method: Projection. Uncertainty (80%) bounds are between 33 and 62.2. Uncertainty (95%) bounds are between 39.3 and 67.5.

Country: Israel , Year: 1998

Estimation Method: Projection. Uncertainty (80%) bounds are between 32.8 and 63. Uncertainty (95%) bounds are between 39.3 and 68.3.

Country: Israel , Year: 1999

Estimation Method: Projection. Uncertainty (80%) bounds are between 32.5 and 63.5. Uncertainty (95%) bounds are between 39.1 and 69.1.

Country: Israel , Year: 2000

Estimation Method: Projection. Uncertainty (80%) bounds are between 32.2 and 64. Uncertainty (95%) bounds are between 39 and 69.6.

Country: Israel , Year: 2001

Estimation Method: Projection. Uncertainty (80%) bounds are between 31.9 and 64.4. Uncertainty (95%) bounds are between 38.9 and 70.3.

Country: Israel , Year: 2002

Estimation Method: Projection. Uncertainty (80%) bounds are between 31.6 and 64.9. Uncertainty (95%) bounds are between 38.7 and 70.8.

Country: Israel , Year: 2003

Estimation Method: Projection. Uncertainty (80%) bounds are between 31.5 and 65.4. Uncertainty (95%) bounds are between 38.6 and 71.5.

Country: Israel , Year: 2004

Estimation Method: Projection. Uncertainty (80%) bounds are between 31.3 and 65.7. Uncertainty (95%) bounds are between 38.6 and 71.9.

Country: Israel , Year: 2005

Estimation Method: Projection. Uncertainty (80%) bounds are between 31.3 and 66.1. Uncertainty (95%) bounds are between 38.5 and 72.2.

Country: Israel , Year: 2006

Estimation Method: Projection. Uncertainty (80%) bounds are between 31.2 and 66.5. Uncertainty (95%) bounds are between 38.3 and 72.9.

Country: Israel , Year: 2007

Estimation Method: Projection. Uncertainty (80%) bounds are between 30.8 and 66.9. Uncertainty (95%) bounds are between 38.3 and 73.4.

Country: Israel , Year: 2008

Estimation Method: Projection. Uncertainty (80%) bounds are between 30.7 and 67.3. Uncertainty (95%) bounds are between 38.4 and 73.8.

Country: Israel , Year: 2009

Estimation Method: Projection. Uncertainty (80%) bounds are between 30.5 and 67.7. Uncertainty (95%) bounds are between 38.2 and 74.3.

Country: Israel , Year: 2010

Estimation Method: Projection. Uncertainty (80%) bounds are between 30.6 and 68.1. Uncertainty (95%) bounds are between 38.3 and 74.9.

Country: Israel , Year: 2011

Estimation Method: Projection. Uncertainty (80%) bounds are between 30.4 and 68.4. Uncertainty (95%) bounds are between 38.3 and 75.2.

Country: Israel , Year: 2012

Estimation Method: Projection. Uncertainty (80%) bounds are between 30.2 and 68.9. Uncertainty (95%) bounds are between 38.2 and 75.6.

Country: Israel , Year: 2013

Estimation Method: Projection. Uncertainty (80%) bounds are between 30.6 and 69.2. Uncertainty (95%) bounds are between 38.3 and 75.9.

Country: Israel , Year: 2014

Estimation Method: Projection. Uncertainty (80%) bounds are between 30.5 and 69.4. Uncertainty (95%) bounds are between 38.3 and 76.2.

Country: Israel , Year: 2015

Estimation Method: Projection. Uncertainty (80%) bounds are between 30.3 and 69.8. Uncertainty (95%) bounds are between 38.3 and 76.6.

Country: Israel , Year: 2016

Estimation Method: Projection. Uncertainty (80%) bounds are between 30.3 and 70.1. Uncertainty (95%) bounds are between 38.4 and 77.

Country: Israel , Year: 2017

Estimation Method: Projection. Uncertainty (80%) bounds are between 30.4 and 70.4. Uncertainty (95%) bounds are between 38.4 and 77.2.

Country: Israel , Year: 2018

Estimation Method: Projection. Uncertainty (80%) bounds are between 30.4 and 70.7. Uncertainty (95%) bounds are between 38.5 and 77.5.

Country: Israel , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 30.5 and 70.9. Uncertainty (95%) bounds are between 38.6 and 77.9.

Country: Israel , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 30.3 and 71.3. Uncertainty (95%) bounds are between 38.8 and 78.3.

Country: Israel , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 30.5 and 71.5. Uncertainty (95%) bounds are between 38.8 and 78.4.

Country: Israel , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 30.6 and 71.9. Uncertainty (95%) bounds are between 39 and 78.7.

Country: Italy , Year: 1970

Estimation Method: Projection. Uncertainty (80%) bounds are between 3.3 and 33.6. Uncertainty (95%) bounds are between 6.2 and 44.4.

Country: Italy , Year: 1971

Estimation Method: Projection. Uncertainty (80%) bounds are between 3.7 and 34.3. Uncertainty (95%) bounds are between 6.7 and 44.6.

Country: Italy , Year: 1972

Estimation Method: Projection. Uncertainty (80%) bounds are between 4 and 34.8. Uncertainty (95%) bounds are between 7.2 and 45.2.

Country: Italy , Year: 1973

Estimation Method: Projection. Uncertainty (80%) bounds are between 4.4 and 35.4. Uncertainty (95%) bounds are between 7.7 and 45.6.

Country: Italy , Year: 1974

Estimation Method: Projection. Uncertainty (80%) bounds are between 4.8 and 36. Uncertainty (95%) bounds are between 8.2 and 45.8.

Country: Italy , Year: 1975

Estimation Method: Projection. Uncertainty (80%) bounds are between 5.2 and 36.7. Uncertainty (95%) bounds are between 8.8 and 46.2.

Country: Italy , Year: 1976

Estimation Method: Projection. Uncertainty (80%) bounds are between 5.6 and 37.2. Uncertainty (95%) bounds are between 9.4 and 46.8.

Country: Italy , Year: 1977

Estimation Method: Projection. Uncertainty (80%) bounds are between 6.1 and 37.8. Uncertainty (95%) bounds are between 10 and 47.2.

Country: Italy , Year: 1978

Estimation Method: Projection. Uncertainty (80%) bounds are between 6.6 and 38.3. Uncertainty (95%) bounds are between 10.8 and 47.6.

Country: Italy , Year: 1979

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 7.3 and 38.9. Uncertainty (95%) bounds are between 11.5 and 47.9.

Country: Italy , Year: 1980

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 7.9 and 39.4. Uncertainty (95%) bounds are between 12.2 and 48.4.

Country: Italy , Year: 1981

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 8.6 and 39.9. Uncertainty (95%) bounds are between 13.1 and 48.2.

Country: Italy , Year: 1982

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 9.3 and 40.4. Uncertainty (95%) bounds are between 14 and 48.6.

Country: Italy , Year: 1983

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 10.1 and 40.9. Uncertainty (95%) bounds are between 15 and 48.9.

Country: Italy , Year: 1984

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 10.9 and 41.2. Uncertainty (95%) bounds are between 16 and 49.

Country: Italy , Year: 1985

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 11.9 and 41.8. Uncertainty (95%) bounds are between 16.9 and 49.2.

Country: Italy , Year: 1986

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 12.8 and 42.3. Uncertainty (95%) bounds are between 18 and 49.3.

Country: Italy , Year: 1987

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 13.7 and 42.6. Uncertainty (95%) bounds are between 19 and 49.4.

Country: Italy , Year: 1988

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 14.9 and 42.9. Uncertainty (95%) bounds are between 20.2 and 49.5.

Country: Italy , Year: 1989

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 16.3 and 43.4. Uncertainty (95%) bounds are between 21.4 and 49.4.

Country: Italy , Year: 1990

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 17.5 and 43.7. Uncertainty (95%) bounds are between 22.6 and 49.3.

Country: Italy , Year: 1991

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 18.9 and 43.9. Uncertainty (95%) bounds are between 23.9 and 49.2.

Country: Italy , Year: 1992

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 20.2 and 44.1. Uncertainty (95%) bounds are between 25.2 and 49.

Country: Italy , Year: 1993

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 21.7 and 44.3. Uncertainty (95%) bounds are between 26.4 and 48.7.

Country: Italy , Year: 1994

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 23.2 and 44.4. Uncertainty (95%) bounds are between 27.7 and 48.6.

Country: Italy , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 24.7 and 44.3. Uncertainty (95%) bounds are between 29 and 48.4.

Country: Italy , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 25.2 and 45.1. Uncertainty (95%) bounds are between 29.6 and 49.

Country: Italy , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 25 and 46.1. Uncertainty (95%) bounds are between 29.6 and 50.2.

Country: Italy , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 25 and 47.1. Uncertainty (95%) bounds are between 29.8 and 51.4.

Country: Italy , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 25.2 and 47.9. Uncertainty (95%) bounds are between 30 and 52.3.

Country: Italy , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 25.1 and 48.7. Uncertainty (95%) bounds are between 30.3 and 53.3.

Country: Italy , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 25.3 and 49.6. Uncertainty (95%) bounds are between 30.7 and 54.1.

Country: Italy , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 25.8 and 50.3. Uncertainty (95%) bounds are between 31.2 and 54.9.

Country: Italy , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 26 and 51. Uncertainty (95%) bounds are between 31.6 and 55.5.

Country: Italy , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 26.5 and 51.6. Uncertainty (95%) bounds are between 32.1 and 56.

Country: Italy , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 26.8 and 52. Uncertainty (95%) bounds are between 32.7 and 56.5.

Country: Italy , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 27.5 and 52.5. Uncertainty (95%) bounds are between 33.4 and 56.8.

Country: Italy , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 28.2 and 52.7. Uncertainty (95%) bounds are between 34 and 57.

Country: Italy , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 29 and 53.1. Uncertainty (95%) bounds are between 34.8 and 57.1.

Country: Italy , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 29.9 and 53.2. Uncertainty (95%) bounds are between 35.6 and 57.2.

Country: Italy , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 30.7 and 53.4. Uncertainty (95%) bounds are between 36.6 and 57.1.

Country: Italy , Year: 2011

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 31.5 and 53.4. Uncertainty (95%) bounds are between 37.5 and 56.7.

Country: Italy , Year: 2012

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 32.4 and 53.4. Uncertainty (95%) bounds are between 38.5 and 56.4.

Country: Italy , Year: 2013

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 33.4 and 53.5. Uncertainty (95%) bounds are between 39.5 and 56.1.

Country: Italy , Year: 2014

Estimation Method: Projection. Uncertainty (80%) bounds are between 33 and 54.6. Uncertainty (95%) bounds are between 39.4 and 57.6.

Country: Italy , Year: 2015

Estimation Method: Projection. Uncertainty (80%) bounds are between 32.7 and 55.6. Uncertainty (95%) bounds are between 39.1 and 59.1.

Country: Italy , Year: 2016

Estimation Method: Projection. Uncertainty (80%) bounds are between 32.6 and 56.8. Uncertainty (95%) bounds are between 39 and 60.5.

Country: Italy , Year: 2017

Estimation Method: Projection. Uncertainty (80%) bounds are between 32.4 and 57.9. Uncertainty (95%) bounds are between 38.9 and 61.9.

Country: Italy , Year: 2018

Estimation Method: Projection. Uncertainty (80%) bounds are between 32.2 and 58.9. Uncertainty (95%) bounds are between 38.6 and 63.3.

Country: Italy , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 32 and 59.8. Uncertainty (95%) bounds are between 38.6 and 64.4.

Country: Italy , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 31.9 and 60.7. Uncertainty (95%) bounds are between 38.6 and 65.6.

Country: Italy , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 31.6 and 61.6. Uncertainty (95%) bounds are between 38.6 and 66.8.

Country: Italy , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 31.5 and 62.5. Uncertainty (95%) bounds are between 38.5 and 68.

Country: Japan , Year: 1970

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 18.9 and 46.8. Uncertainty (95%) bounds are between 25.8 and 50.1.

Country: Japan , Year: 1971

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 19.7 and 47.5. Uncertainty (95%) bounds are between 26.7 and 50.9.

Country: Japan , Year: 1972

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 20.6 and 48.7. Uncertainty (95%) bounds are between 27.5 and 52.1.

Country: Japan , Year: 1973

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 21.6 and 49.9. Uncertainty (95%) bounds are between 28.6 and 53.3.

Country: Japan , Year: 1974

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 22.5 and 50.9. Uncertainty (95%) bounds are between 29.6 and 54.2.

Country: Japan , Year: 1975

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 23 and 51.7. Uncertainty (95%) bounds are between 30.3 and 55.

Country: Japan , Year: 1976

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 23.7 and 52.2. Uncertainty (95%) bounds are between 30.9 and 55.5.

Country: Japan , Year: 1977

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 24.3 and 52.4. Uncertainty (95%) bounds are between 31.4 and 55.9.

Country: Japan , Year: 1978

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 24.8 and 52.8. Uncertainty (95%) bounds are between 31.9 and 56.3.

Country: Japan , Year: 1979

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 25.1 and 53. Uncertainty (95%) bounds are between 32.2 and 56.5.

Country: Japan , Year: 1980

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 25.5 and 53.2. Uncertainty (95%) bounds are between 32.5 and 56.7.

Country: Japan , Year: 1981

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 25.9 and 52.9. Uncertainty (95%) bounds are between 32.7 and 56.5.

Country: Japan , Year: 1982

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 26.1 and 52.8. Uncertainty (95%) bounds are between 32.9 and 56.4.

Country: Japan , Year: 1983

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 26.6 and 52.6. Uncertainty (95%) bounds are between 33.2 and 56.1.

Country: Japan , Year: 1984

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 27 and 52.5. Uncertainty (95%) bounds are between 33.5 and 55.8.

Country: Japan , Year: 1985

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 27.7 and 52.8. Uncertainty (95%) bounds are between 34 and 55.9.

Country: Japan , Year: 1986

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 28 and 52.9. Uncertainty (95%) bounds are between 34.4 and 56.1.

Country: Japan , Year: 1987

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 28.4 and 52.8. Uncertainty (95%) bounds are between 34.7 and 55.9.

Country: Japan , Year: 1988

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 28.8 and 52.5. Uncertainty (95%) bounds are between 35 and 55.6.

Country: Japan , Year: 1989

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 29.4 and 52.7. Uncertainty (95%) bounds are between 35.4 and 55.7.

Country: Japan , Year: 1990

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 30 and 52.9. Uncertainty (95%) bounds are between 35.8 and 55.9.

Country: Japan , Year: 1991

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 30.3 and 53.1. Uncertainty (95%) bounds are between 36.2 and 56.

Country: Japan , Year: 1992

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 30.6 and 52.9. Uncertainty (95%) bounds are between 36.5 and 55.9.

Country: Japan , Year: 1993

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 30.9 and 52.4. Uncertainty (95%) bounds are between 36.4 and 55.3.

Country: Japan , Year: 1994

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 30.8 and 51.6. Uncertainty (95%) bounds are between 36.2 and 54.6.

Country: Japan , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 30.9 and 50.9. Uncertainty (95%) bounds are between 36.1 and 53.8.

Country: Japan , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 31 and 50.2. Uncertainty (95%) bounds are between 36 and 52.8.

Country: Japan , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 31.2 and 49.6. Uncertainty (95%) bounds are between 36 and 52.2.

Country: Japan , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 31.3 and 48.9. Uncertainty (95%) bounds are between 36 and 51.6.

Country: Japan , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 31.7 and 48.6. Uncertainty (95%) bounds are between 35.9 and 51.2.

Country: Japan , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 32.2 and 48.3. Uncertainty (95%) bounds are between 36.3 and 50.9.

Country: Japan , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 32.8 and 48.2. Uncertainty (95%) bounds are between 36.5 and 50.8.

Country: Japan , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 33.4 and 47.9. Uncertainty (95%) bounds are between 36.9 and 50.5.

Country: Japan , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.4 and 47.5. Uncertainty (95%) bounds are between 37.4 and 49.8.

Country: Japan , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 35.3 and 47.2. Uncertainty (95%) bounds are between 38.2 and 49.3.

Country: Japan , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 36.6 and 47.1. Uncertainty (95%) bounds are between 38.9 and 49.

Country: Japan , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 35.6 and 47.5. Uncertainty (95%) bounds are between 38.3 and 49.7.

Country: Japan , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.6 and 47.7. Uncertainty (95%) bounds are between 37.6 and 50.3.

Country: Japan , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 33.6 and 47.7. Uncertainty (95%) bounds are between 36.8 and 50.5.

Country: Japan , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 33 and 47.4. Uncertainty (95%) bounds are between 36.2 and 50.3.

Country: Japan , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 32.6 and 46.8. Uncertainty (95%) bounds are between 35.8 and 49.7.

Country: Japan , Year: 2011

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 32.5 and 46. Uncertainty (95%) bounds are between 35.4 and 48.7.

Country: Japan , Year: 2012

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 32.4 and 44.8. Uncertainty (95%) bounds are between 35.1 and 47.4.

Country: Japan , Year: 2013

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 32.4 and 43.4. Uncertainty (95%) bounds are between 34.9 and 45.7.

Country: Japan , Year: 2014

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 32.5 and 41.7. Uncertainty (95%) bounds are between 34.6 and 43.5.

Country: Japan , Year: 2015

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 30.7 and 40.1. Uncertainty (95%) bounds are between 32.9 and 41.9.

Country: Japan , Year: 2016

Estimation Method: Projection. Uncertainty (80%) bounds are between 29.6 and 40.8. Uncertainty (95%) bounds are between 32.1 and 43.1.

Country: Japan , Year: 2017

Estimation Method: Projection. Uncertainty (80%) bounds are between 29 and 42.1. Uncertainty (95%) bounds are between 31.8 and 44.8.

Country: Japan , Year: 2018

Estimation Method: Projection. Uncertainty (80%) bounds are between 28.6 and 43.6. Uncertainty (95%) bounds are between 31.8 and 46.6.

Country: Japan , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 28.6 and 45.1. Uncertainty (95%) bounds are between 31.8 and 48.4.

Country: Japan , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 28.4 and 46.5. Uncertainty (95%) bounds are between 32.1 and 50.1.

Country: Japan , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 28.5 and 47.8. Uncertainty (95%) bounds are between 32.4 and 51.6.

Country: Japan , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 28.5 and 49.1. Uncertainty (95%) bounds are between 32.7 and 53.4.

Country: Kyrgyzstan , Year: 1970

Estimation Method: Projection. Uncertainty (80%) bounds are between 8.4 and 57.2. Uncertainty (95%) bounds are between 15.1 and 66.5.

Country: Kyrgyzstan , Year: 1971

Estimation Method: Projection. Uncertainty (80%) bounds are between 9.2 and 57.2. Uncertainty (95%) bounds are between 16 and 66.2.

Country: Kyrgyzstan , Year: 1972

Estimation Method: Projection. Uncertainty (80%) bounds are between 10 and 57.3. Uncertainty (95%) bounds are between 16.8 and 65.9.

Country: Kyrgyzstan , Year: 1973

Estimation Method: Projection. Uncertainty (80%) bounds are between 10.6 and 57.5. Uncertainty (95%) bounds are between 17.7 and 65.9.

Country: Kyrgyzstan , Year: 1974

Estimation Method: Projection. Uncertainty (80%) bounds are between 11.4 and 57.3. Uncertainty (95%) bounds are between 18.7 and 65.8.

Country: Kyrgyzstan , Year: 1975

Estimation Method: Projection. Uncertainty (80%) bounds are between 12.2 and 57.2. Uncertainty (95%) bounds are between 19.5 and 65.6.

Country: Kyrgyzstan , Year: 1976

Estimation Method: Projection. Uncertainty (80%) bounds are between 13 and 57.3. Uncertainty (95%) bounds are between 20.4 and 65.5.

Country: Kyrgyzstan , Year: 1977

Estimation Method: Projection. Uncertainty (80%) bounds are between 14 and 57.3. Uncertainty (95%) bounds are between 21.3 and 65.5.

Country: Kyrgyzstan , Year: 1978

Estimation Method: Projection. Uncertainty (80%) bounds are between 15.1 and 57.2. Uncertainty (95%) bounds are between 22.3 and 65.1.

Country: Kyrgyzstan , Year: 1979

Estimation Method: Projection. Uncertainty (80%) bounds are between 16.1 and 57.3. Uncertainty (95%) bounds are between 23.3 and 64.8.

Country: Kyrgyzstan , Year: 1980

Estimation Method: Projection. Uncertainty (80%) bounds are between 17.2 and 57.2. Uncertainty (95%) bounds are between 24.3 and 64.6.

Country: Kyrgyzstan , Year: 1981

Estimation Method: Projection. Uncertainty (80%) bounds are between 18.3 and 57.1. Uncertainty (95%) bounds are between 25.4 and 64.4.

Country: Kyrgyzstan , Year: 1982

Estimation Method: Projection. Uncertainty (80%) bounds are between 19.6 and 56.9. Uncertainty (95%) bounds are between 26.5 and 64.1.

Country: Kyrgyzstan , Year: 1983

Estimation Method: Projection. Uncertainty (80%) bounds are between 20.9 and 56.8. Uncertainty (95%) bounds are between 27.6 and 63.7.

Country: Kyrgyzstan , Year: 1984

Estimation Method: Projection. Uncertainty (80%) bounds are between 22.2 and 56.8. Uncertainty (95%) bounds are between 28.8 and 63.3.

Country: Kyrgyzstan , Year: 1985

Estimation Method: Projection. Uncertainty (80%) bounds are between 23.4 and 56.6. Uncertainty (95%) bounds are between 30 and 63.

Country: Kyrgyzstan , Year: 1986

Estimation Method: Projection. Uncertainty (80%) bounds are between 25 and 56.4. Uncertainty (95%) bounds are between 31.3 and 62.5.

Country: Kyrgyzstan , Year: 1987

Estimation Method: Projection. Uncertainty (80%) bounds are between 26.6 and 56. Uncertainty (95%) bounds are between 32.5 and 62.

Country: Kyrgyzstan , Year: 1988

Estimation Method: Projection. Uncertainty (80%) bounds are between 28.2 and 55.8. Uncertainty (95%) bounds are between 33.7 and 61.4.

Country: Kyrgyzstan , Year: 1989

Estimation Method: Projection. Uncertainty (80%) bounds are between 29.8 and 55.5. Uncertainty (95%) bounds are between 34.9 and 60.9.

Country: Kyrgyzstan , Year: 1990

Estimation Method: Projection. Uncertainty (80%) bounds are between 31.6 and 55.2. Uncertainty (95%) bounds are between 36.3 and 60.1.

Country: Kyrgyzstan , Year: 1991

Estimation Method: Projection. Uncertainty (80%) bounds are between 33.2 and 55. Uncertainty (95%) bounds are between 37.7 and 59.4.

Country: Kyrgyzstan , Year: 1992

Estimation Method: Projection. Uncertainty (80%) bounds are between 35 and 54.7. Uncertainty (95%) bounds are between 39.2 and 58.7.

Country: Kyrgyzstan , Year: 1993

Estimation Method: Projection. Uncertainty (80%) bounds are between 37 and 54.4. Uncertainty (95%) bounds are between 40.7 and 57.9.

Country: Kyrgyzstan , Year: 1994

Estimation Method: Projection. Uncertainty (80%) bounds are between 39 and 54. Uncertainty (95%) bounds are between 42.2 and 57.

Country: Kyrgyzstan , Year: 1995

Estimation Method: Projection. Uncertainty (80%) bounds are between 41.1 and 53.3. Uncertainty (95%) bounds are between 43.7 and 55.8.

Country: Kyrgyzstan , Year: 1996

Estimation Method: Projection. Uncertainty (80%) bounds are between 43.1 and 52.5. Uncertainty (95%) bounds are between 45.2 and 54.5.

Country: Kyrgyzstan , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.6 and 51.7. Uncertainty (95%) bounds are between 46.2 and 53.2.

Country: Kyrgyzstan , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43.5 and 52.2. Uncertainty (95%) bounds are between 45.4 and 53.9.

Country: Kyrgyzstan , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 41.8 and 52.4. Uncertainty (95%) bounds are between 44.2 and 54.6.

Country: Kyrgyzstan , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 40.2 and 52.5. Uncertainty (95%) bounds are between 42.8 and 54.8.

Country: Kyrgyzstan , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.8 and 52.1. Uncertainty (95%) bounds are between 41.6 and 54.7.

Country: Kyrgyzstan , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.6 and 51.5. Uncertainty (95%) bounds are between 40.4 and 54.3.

Country: Kyrgyzstan , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 36.6 and 50.6. Uncertainty (95%) bounds are between 39.5 and 53.7.

Country: Kyrgyzstan , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 35.9 and 49.5. Uncertainty (95%) bounds are between 38.5 and 52.5.

Country: Kyrgyzstan , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 35.1 and 48.2. Uncertainty (95%) bounds are between 37.7 and 51.

Country: Kyrgyzstan , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.3 and 46.8. Uncertainty (95%) bounds are between 36.7 and 49.5.

Country: Kyrgyzstan , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 33.1 and 45.3. Uncertainty (95%) bounds are between 35.4 and 48.1.

Country: Kyrgyzstan , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 32 and 43.7. Uncertainty (95%) bounds are between 34.3 and 46.3.

Country: Kyrgyzstan , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 31.2 and 41.9. Uncertainty (95%) bounds are between 33.4 and 44.3.

Country: Kyrgyzstan , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 31 and 39.9. Uncertainty (95%) bounds are between 32.8 and 41.9.

Country: Kyrgyzstan , Year: 2011

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 31.2 and 38. Uncertainty (95%) bounds are between 32.6 and 39.7.

Country: Kyrgyzstan , Year: 2012

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 31.7 and 36.6. Uncertainty (95%) bounds are between 32.7 and 38.

Country: Kyrgyzstan , Year: 2013

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 31 and 37.4. Uncertainty (95%) bounds are between 32.3 and 38.9.

Country: Kyrgyzstan , Year: 2014

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 30.4 and 38.6. Uncertainty (95%) bounds are between 32.1 and 40.6.

Country: Kyrgyzstan , Year: 2015

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 29.8 and 39.8. Uncertainty (95%) bounds are between 31.8 and 42.1.

Country: Kyrgyzstan , Year: 2016

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 29.4 and 40.9. Uncertainty (95%) bounds are between 31.7 and 43.5.

Country: Kyrgyzstan , Year: 2017

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 29.3 and 41.9. Uncertainty (95%) bounds are between 31.7 and 44.7.

Country: Kyrgyzstan , Year: 2018

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 28.9 and 42.9. Uncertainty (95%) bounds are between 31.7 and 46.1.

Country: Kyrgyzstan , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 28.4 and 44.3. Uncertainty (95%) bounds are between 31.5 and 47.9.

Country: Kyrgyzstan , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 27.9 and 45.6. Uncertainty (95%) bounds are between 31.2 and 49.7.

Country: Kyrgyzstan , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 27.2 and 47. Uncertainty (95%) bounds are between 30.9 and 51.4.

Country: Kyrgyzstan , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 26.7 and 48.3. Uncertainty (95%) bounds are between 30.8 and 53.

Country: Latvia , Year: 1970

Estimation Method: Projection. Uncertainty (80%) bounds are between 13 and 59.8. Uncertainty (95%) bounds are between 21.9 and 68.3.

Country: Latvia , Year: 1971

Estimation Method: Projection. Uncertainty (80%) bounds are between 13.9 and 60. Uncertainty (95%) bounds are between 22.8 and 68.1.

Country: Latvia , Year: 1972

Estimation Method: Projection. Uncertainty (80%) bounds are between 14.7 and 60.2. Uncertainty (95%) bounds are between 23.6 and 68.3.

Country: Latvia , Year: 1973

Estimation Method: Projection. Uncertainty (80%) bounds are between 15.7 and 60.4. Uncertainty (95%) bounds are between 24.5 and 68.6.

Country: Latvia , Year: 1974

Estimation Method: Projection. Uncertainty (80%) bounds are between 16.5 and 60.5. Uncertainty (95%) bounds are between 25.4 and 68.6.

Country: Latvia , Year: 1975

Estimation Method: Projection. Uncertainty (80%) bounds are between 17.5 and 60.7. Uncertainty (95%) bounds are between 26.3 and 68.5.

Country: Latvia , Year: 1976

Estimation Method: Projection. Uncertainty (80%) bounds are between 18.6 and 60.9. Uncertainty (95%) bounds are between 27.2 and 68.4.

Country: Latvia , Year: 1977

Estimation Method: Projection. Uncertainty (80%) bounds are between 19.8 and 60.9. Uncertainty (95%) bounds are between 28.1 and 68.3.

Country: Latvia , Year: 1978

Estimation Method: Projection. Uncertainty (80%) bounds are between 20.7 and 60.8. Uncertainty (95%) bounds are between 29 and 68.1.

Country: Latvia , Year: 1979

Estimation Method: Projection. Uncertainty (80%) bounds are between 21.9 and 60.9. Uncertainty (95%) bounds are between 30.1 and 68.

Country: Latvia , Year: 1980

Estimation Method: Projection. Uncertainty (80%) bounds are between 22.9 and 61. Uncertainty (95%) bounds are between 31.1 and 67.9.

Country: Latvia , Year: 1981

Estimation Method: Projection. Uncertainty (80%) bounds are between 24.2 and 61.1. Uncertainty (95%) bounds are between 31.9 and 67.7.

Country: Latvia , Year: 1982

Estimation Method: Projection. Uncertainty (80%) bounds are between 25.3 and 61.2. Uncertainty (95%) bounds are between 33 and 67.4.

Country: Latvia , Year: 1983

Estimation Method: Projection. Uncertainty (80%) bounds are between 26.4 and 61.2. Uncertainty (95%) bounds are between 34 and 67.4.

Country: Latvia , Year: 1984

Estimation Method: Projection. Uncertainty (80%) bounds are between 27.6 and 61.2. Uncertainty (95%) bounds are between 35 and 67.

Country: Latvia , Year: 1985

Estimation Method: Projection. Uncertainty (80%) bounds are between 28.8 and 61.2. Uncertainty (95%) bounds are between 36.2 and 66.6.

Country: Latvia , Year: 1986

Estimation Method: Projection. Uncertainty (80%) bounds are between 30 and 61.1. Uncertainty (95%) bounds are between 37.2 and 66.5.

Country: Latvia , Year: 1987

Estimation Method: Projection. Uncertainty (80%) bounds are between 31.6 and 61. Uncertainty (95%) bounds are between 38.1 and 66.3.

Country: Latvia , Year: 1988

Estimation Method: Projection. Uncertainty (80%) bounds are between 32.5 and 60.9. Uncertainty (95%) bounds are between 39.1 and 65.9.

Country: Latvia , Year: 1989

Estimation Method: Projection. Uncertainty (80%) bounds are between 33.9 and 60.8. Uncertainty (95%) bounds are between 40.1 and 65.4.

Country: Latvia , Year: 1990

Estimation Method: Projection. Uncertainty (80%) bounds are between 35.2 and 60.7. Uncertainty (95%) bounds are between 41.2 and 64.9.

Country: Latvia , Year: 1991

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.4 and 60.7. Uncertainty (95%) bounds are between 42.1 and 64.7.

Country: Latvia , Year: 1992

Estimation Method: Projection. Uncertainty (80%) bounds are between 37.6 and 60.6. Uncertainty (95%) bounds are between 42.9 and 64.7.

Country: Latvia , Year: 1993

Estimation Method: Projection. Uncertainty (80%) bounds are between 38.4 and 60.6. Uncertainty (95%) bounds are between 43.7 and 64.5.

Country: Latvia , Year: 1994

Estimation Method: Projection. Uncertainty (80%) bounds are between 39.3 and 60.6. Uncertainty (95%) bounds are between 44.6 and 64.3.

Country: Latvia , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 40.3 and 60.7. Uncertainty (95%) bounds are between 45.4 and 64.2.

Country: Latvia , Year: 1996

Estimation Method: Projection. Uncertainty (80%) bounds are between 39.9 and 61.5. Uncertainty (95%) bounds are between 45.2 and 65.4.

Country: Latvia , Year: 1997

Estimation Method: Projection. Uncertainty (80%) bounds are between 39.5 and 62.5. Uncertainty (95%) bounds are between 45 and 66.6.

Country: Latvia , Year: 1998

Estimation Method: Projection. Uncertainty (80%) bounds are between 39.1 and 63.5. Uncertainty (95%) bounds are between 44.8 and 67.6.

Country: Latvia , Year: 1999

Estimation Method: Projection. Uncertainty (80%) bounds are between 38.7 and 64.3. Uncertainty (95%) bounds are between 44.6 and 68.8.

Country: Latvia , Year: 2000

Estimation Method: Projection. Uncertainty (80%) bounds are between 38.3 and 65.2. Uncertainty (95%) bounds are between 44.6 and 69.8.

Country: Latvia , Year: 2001

Estimation Method: Projection. Uncertainty (80%) bounds are between 37.9 and 65.9. Uncertainty (95%) bounds are between 44.5 and 70.8.

Country: Latvia , Year: 2002

Estimation Method: Projection. Uncertainty (80%) bounds are between 37.8 and 66.7. Uncertainty (95%) bounds are between 44.4 and 71.7.

Country: Latvia , Year: 2003

Estimation Method: Projection. Uncertainty (80%) bounds are between 37.4 and 67.5. Uncertainty (95%) bounds are between 44.3 and 72.5.

Country: Latvia , Year: 2004

Estimation Method: Projection. Uncertainty (80%) bounds are between 37.4 and 68.1. Uncertainty (95%) bounds are between 44.2 and 73.4.

Country: Latvia , Year: 2005

Estimation Method: Projection. Uncertainty (80%) bounds are between 37 and 68.7. Uncertainty (95%) bounds are between 44 and 74.2.

Country: Latvia , Year: 2006

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.8 and 69.4. Uncertainty (95%) bounds are between 44.1 and 74.8.

Country: Latvia , Year: 2007

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.4 and 70. Uncertainty (95%) bounds are between 44 and 75.4.

Country: Latvia , Year: 2008

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.3 and 70.5. Uncertainty (95%) bounds are between 44 and 76.1.

Country: Latvia , Year: 2009

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.1 and 71. Uncertainty (95%) bounds are between 44.1 and 76.8.

Country: Latvia , Year: 2010

Estimation Method: Projection. Uncertainty (80%) bounds are between 36 and 71.7. Uncertainty (95%) bounds are between 44 and 77.2.

Country: Latvia , Year: 2011

Estimation Method: Projection. Uncertainty (80%) bounds are between 35.8 and 72.1. Uncertainty (95%) bounds are between 44.1 and 77.9.

Country: Latvia , Year: 2012

Estimation Method: Projection. Uncertainty (80%) bounds are between 35.8 and 72.6. Uncertainty (95%) bounds are between 44.1 and 78.3.

Country: Latvia , Year: 2013

Estimation Method: Projection. Uncertainty (80%) bounds are between 35.6 and 73. Uncertainty (95%) bounds are between 44.2 and 79.

Country: Latvia , Year: 2014

Estimation Method: Projection. Uncertainty (80%) bounds are between 35.4 and 73.5. Uncertainty (95%) bounds are between 44.1 and 79.5.

Country: Latvia , Year: 2015

Estimation Method: Projection. Uncertainty (80%) bounds are between 35.3 and 74.1. Uncertainty (95%) bounds are between 44 and 79.9.

Country: Latvia , Year: 2016

Estimation Method: Projection. Uncertainty (80%) bounds are between 35.3 and 74.5. Uncertainty (95%) bounds are between 43.9 and 80.4.

Country: Latvia , Year: 2017

Estimation Method: Projection. Uncertainty (80%) bounds are between 35 and 75. Uncertainty (95%) bounds are between 43.9 and 81.

Country: Latvia , Year: 2018

Estimation Method: Projection. Uncertainty (80%) bounds are between 35 and 75.3. Uncertainty (95%) bounds are between 43.8 and 81.4.

Country: Latvia , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 34.6 and 75.7. Uncertainty (95%) bounds are between 43.9 and 81.8.

Country: Latvia , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 34.5 and 76.1. Uncertainty (95%) bounds are between 43.8 and 82.1.

Country: Latvia , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 34.3 and 76.4. Uncertainty (95%) bounds are between 43.8 and 82.5.

Country: Latvia , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 34.4 and 76.7. Uncertainty (95%) bounds are between 43.8 and 82.8.

Country: Lithuania , Year: 1970

Estimation Method: Projection. Uncertainty (80%) bounds are between 8 and 48.9. Uncertainty (95%) bounds are between 14.1 and 58.2.

Country: Lithuania , Year: 1971

Estimation Method: Projection. Uncertainty (80%) bounds are between 8.6 and 49.1. Uncertainty (95%) bounds are between 14.7 and 58.2.

Country: Lithuania , Year: 1972

Estimation Method: Projection. Uncertainty (80%) bounds are between 9.2 and 49.1. Uncertainty (95%) bounds are between 15.3 and 58.1.

Country: Lithuania , Year: 1973

Estimation Method: Projection. Uncertainty (80%) bounds are between 9.7 and 49.1. Uncertainty (95%) bounds are between 15.9 and 57.9.

Country: Lithuania , Year: 1974

Estimation Method: Projection. Uncertainty (80%) bounds are between 10.4 and 49.3. Uncertainty (95%) bounds are between 16.6 and 57.7.

Country: Lithuania , Year: 1975

Estimation Method: Projection. Uncertainty (80%) bounds are between 10.9 and 49.4. Uncertainty (95%) bounds are between 17.3 and 57.6.

Country: Lithuania , Year: 1976

Estimation Method: Projection. Uncertainty (80%) bounds are between 11.6 and 49.5. Uncertainty (95%) bounds are between 17.9 and 57.3.

Country: Lithuania , Year: 1977

Estimation Method: Projection. Uncertainty (80%) bounds are between 12.4 and 49.4. Uncertainty (95%) bounds are between 18.4 and 57.3.

Country: Lithuania , Year: 1978

Estimation Method: Projection. Uncertainty (80%) bounds are between 13.1 and 49.4. Uncertainty (95%) bounds are between 19.1 and 57.3.

Country: Lithuania , Year: 1979

Estimation Method: Projection. Uncertainty (80%) bounds are between 13.6 and 49.5. Uncertainty (95%) bounds are between 19.8 and 56.9.

Country: Lithuania , Year: 1980

Estimation Method: Projection. Uncertainty (80%) bounds are between 14.4 and 49.3. Uncertainty (95%) bounds are between 20.5 and 56.9.

Country: Lithuania , Year: 1981

Estimation Method: Projection. Uncertainty (80%) bounds are between 15 and 49.3. Uncertainty (95%) bounds are between 21.3 and 56.7.

Country: Lithuania , Year: 1982

Estimation Method: Projection. Uncertainty (80%) bounds are between 15.8 and 49.3. Uncertainty (95%) bounds are between 21.9 and 56.4.

Country: Lithuania , Year: 1983

Estimation Method: Projection. Uncertainty (80%) bounds are between 16.8 and 49.3. Uncertainty (95%) bounds are between 22.7 and 56.3.

Country: Lithuania , Year: 1984

Estimation Method: Projection. Uncertainty (80%) bounds are between 17.5 and 49. Uncertainty (95%) bounds are between 23.4 and 55.6.

Country: Lithuania , Year: 1985

Estimation Method: Projection. Uncertainty (80%) bounds are between 18.4 and 48.9. Uncertainty (95%) bounds are between 24 and 55.2.

Country: Lithuania , Year: 1986

Estimation Method: Projection. Uncertainty (80%) bounds are between 19.3 and 48.6. Uncertainty (95%) bounds are between 24.8 and 54.8.

Country: Lithuania , Year: 1987

Estimation Method: Projection. Uncertainty (80%) bounds are between 20.2 and 48.4. Uncertainty (95%) bounds are between 25.6 and 54.2.

Country: Lithuania , Year: 1988

Estimation Method: Projection. Uncertainty (80%) bounds are between 21.2 and 48.2. Uncertainty (95%) bounds are between 26.3 and 53.6.

Country: Lithuania , Year: 1989

Estimation Method: Projection. Uncertainty (80%) bounds are between 22.2 and 47.8. Uncertainty (95%) bounds are between 26.9 and 53.

Country: Lithuania , Year: 1990

Estimation Method: Projection. Uncertainty (80%) bounds are between 23 and 47.3. Uncertainty (95%) bounds are between 27.7 and 52.3.

Country: Lithuania , Year: 1991

Estimation Method: Projection. Uncertainty (80%) bounds are between 23.8 and 46.6. Uncertainty (95%) bounds are between 28.3 and 51.5.

Country: Lithuania , Year: 1992

Estimation Method: Projection. Uncertainty (80%) bounds are between 24.5 and 46. Uncertainty (95%) bounds are between 28.8 and 50.6.

Country: Lithuania , Year: 1993

Estimation Method: Projection. Uncertainty (80%) bounds are between 25.1 and 45.3. Uncertainty (95%) bounds are between 29.2 and 49.4.

Country: Lithuania , Year: 1994

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 26 and 44.6. Uncertainty (95%) bounds are between 29.9 and 48.4.

Country: Lithuania , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 26.8 and 44.3. Uncertainty (95%) bounds are between 30.5 and 48.1.

Country: Lithuania , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 27 and 45.5. Uncertainty (95%) bounds are between 31 and 49.4.

Country: Lithuania , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 27.6 and 46.7. Uncertainty (95%) bounds are between 31.7 and 50.6.

Country: Lithuania , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 28.2 and 48. Uncertainty (95%) bounds are between 32.4 and 51.9.

Country: Lithuania , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 29.1 and 49.2. Uncertainty (95%) bounds are between 33.2 and 53.2.

Country: Lithuania , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 30 and 50.3. Uncertainty (95%) bounds are between 34.2 and 54.4.

Country: Lithuania , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 31 and 51.4. Uncertainty (95%) bounds are between 35.4 and 55.3.

Country: Lithuania , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 32.2 and 52.3. Uncertainty (95%) bounds are between 36.8 and 56.1.

Country: Lithuania , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 33.5 and 53.2. Uncertainty (95%) bounds are between 37.9 and 56.8.

Country: Lithuania , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 35.2 and 53.8. Uncertainty (95%) bounds are between 39.3 and 57.6.

Country: Lithuania , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 36.7 and 54.5. Uncertainty (95%) bounds are between 40.9 and 58.

Country: Lithuania , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.6 and 55.1. Uncertainty (95%) bounds are between 42.5 and 58.3.

Country: Lithuania , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 39.3 and 56.2. Uncertainty (95%) bounds are between 43.3 and 59.4.

Country: Lithuania , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 39.9 and 57.1. Uncertainty (95%) bounds are between 43.9 and 60.4.

Country: Lithuania , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 40.6 and 58. Uncertainty (95%) bounds are between 44.7 and 61.3.

Country: Lithuania , Year: 2010

Estimation Method: Projection. Uncertainty (80%) bounds are between 40.1 and 59.4. Uncertainty (95%) bounds are between 44.6 and 62.9.

Country: Lithuania , Year: 2011

Estimation Method: Projection. Uncertainty (80%) bounds are between 39.6 and 60.5. Uncertainty (95%) bounds are between 44.3 and 64.5.

Country: Lithuania , Year: 2012

Estimation Method: Projection. Uncertainty (80%) bounds are between 39.1 and 61.6. Uncertainty (95%) bounds are between 44.1 and 65.6.

Country: Lithuania , Year: 2013

Estimation Method: Projection. Uncertainty (80%) bounds are between 38.4 and 62.5. Uncertainty (95%) bounds are between 44 and 67.1.

Country: Lithuania , Year: 2014

Estimation Method: Projection. Uncertainty (80%) bounds are between 38.1 and 63.5. Uncertainty (95%) bounds are between 43.8 and 68.1.

Country: Lithuania , Year: 2015

Estimation Method: Projection. Uncertainty (80%) bounds are between 37.5 and 64.4. Uncertainty (95%) bounds are between 43.7 and 69.2.

Country: Lithuania , Year: 2016

Estimation Method: Projection. Uncertainty (80%) bounds are between 37.3 and 65.2. Uncertainty (95%) bounds are between 43.6 and 70.1.

Country: Lithuania , Year: 2017

Estimation Method: Projection. Uncertainty (80%) bounds are between 37 and 65.9. Uncertainty (95%) bounds are between 43.4 and 71.3.

Country: Lithuania , Year: 2018

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.8 and 66.7. Uncertainty (95%) bounds are between 43.4 and 72.1.

Country: Lithuania , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.5 and 67.4. Uncertainty (95%) bounds are between 43.3 and 73.

Country: Lithuania , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.4 and 68.1. Uncertainty (95%) bounds are between 43.2 and 73.8.

Country: Lithuania , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.1 and 68.7. Uncertainty (95%) bounds are between 43.2 and 74.5.

Country: Lithuania , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 35.9 and 69.3. Uncertainty (95%) bounds are between 43.2 and 75.2.

Country: Malta , Year: 1970

Estimation Method: Projection. Uncertainty (80%) bounds are between 13.9 and 62.9. Uncertainty (95%) bounds are between 21.6 and 72.2.

Country: Malta , Year: 1971

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 14.7 and 63.7. Uncertainty (95%) bounds are between 22.6 and 72.6.

Country: Malta , Year: 1972

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 14.6 and 64.6. Uncertainty (95%) bounds are between 22.8 and 73.2.

Country: Malta , Year: 1973

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 15 and 65.2. Uncertainty (95%) bounds are between 22.9 and 73.9.

Country: Malta , Year: 1974

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 15.1 and 65.7. Uncertainty (95%) bounds are between 23 and 74.2.

Country: Malta , Year: 1975

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 15 and 66.3. Uncertainty (95%) bounds are between 23.3 and 74.6.

Country: Malta , Year: 1976

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 15.2 and 66.8. Uncertainty (95%) bounds are between 23.5 and 75.3.

Country: Malta , Year: 1977

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 15.3 and 67.3. Uncertainty (95%) bounds are between 23.8 and 75.7.

Country: Malta , Year: 1978

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 15.5 and 67.7. Uncertainty (95%) bounds are between 24.2 and 75.8.

Country: Malta , Year: 1979

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 15.7 and 68.3. Uncertainty (95%) bounds are between 24.4 and 76.1.

Country: Malta , Year: 1980

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 15.8 and 68.6. Uncertainty (95%) bounds are between 24.6 and 76.3.

Country: Malta , Year: 1981

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 15.9 and 69. Uncertainty (95%) bounds are between 24.8 and 76.7.

Country: Malta , Year: 1982

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 16.2 and 69.3. Uncertainty (95%) bounds are between 25.1 and 76.9.

Country: Malta , Year: 1983

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 16.1 and 69.5. Uncertainty (95%) bounds are between 25.5 and 77.2.

Country: Malta , Year: 1984

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 16.4 and 69.9. Uncertainty (95%) bounds are between 25.7 and 77.3.

Country: Malta , Year: 1985

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 16.6 and 70.1. Uncertainty (95%) bounds are between 26.1 and 77.5.

Country: Malta , Year: 1986

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 17.1 and 70.3. Uncertainty (95%) bounds are between 26.6 and 77.6.

Country: Malta , Year: 1987

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 17.2 and 70.5. Uncertainty (95%) bounds are between 26.9 and 77.7.

Country: Malta , Year: 1988

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 17.6 and 70.6. Uncertainty (95%) bounds are between 27.4 and 77.6.

Country: Malta , Year: 1989

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 18 and 70.7. Uncertainty (95%) bounds are between 27.7 and 77.5.

Country: Malta , Year: 1990

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 18.5 and 71. Uncertainty (95%) bounds are between 28.1 and 77.8.

Country: Malta , Year: 1991

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 18.9 and 71.8. Uncertainty (95%) bounds are between 28.6 and 78.3.

Country: Malta , Year: 1992

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 19.5 and 72.4. Uncertainty (95%) bounds are between 29.1 and 78.7.

Country: Malta , Year: 1993

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 20 and 73.1. Uncertainty (95%) bounds are between 29.5 and 79.3.

Country: Malta , Year: 1994

Estimation Method: Projection. Uncertainty (80%) bounds are between 20.4 and 73.6. Uncertainty (95%) bounds are between 29.7 and 79.7.

Country: Malta , Year: 1995

Estimation Method: Projection. Uncertainty (80%) bounds are between 20.4 and 74. Uncertainty (95%) bounds are between 30.1 and 80.3.

Country: Malta , Year: 1996

Estimation Method: Projection. Uncertainty (80%) bounds are between 20.8 and 74.4. Uncertainty (95%) bounds are between 30.5 and 80.6.

Country: Malta , Year: 1997

Estimation Method: Projection. Uncertainty (80%) bounds are between 20.9 and 74.7. Uncertainty (95%) bounds are between 30.8 and 81.

Country: Malta , Year: 1998

Estimation Method: Projection. Uncertainty (80%) bounds are between 21.3 and 75. Uncertainty (95%) bounds are between 31.2 and 81.5.

Country: Malta , Year: 1999

Estimation Method: Projection. Uncertainty (80%) bounds are between 21.4 and 75.3. Uncertainty (95%) bounds are between 31.4 and 81.9.

Country: Malta , Year: 2000

Estimation Method: Projection. Uncertainty (80%) bounds are between 21.6 and 75.8. Uncertainty (95%) bounds are between 31.6 and 82.4.

Country: Malta , Year: 2001

Estimation Method: Projection. Uncertainty (80%) bounds are between 22.1 and 76.1. Uncertainty (95%) bounds are between 32 and 82.7.

Country: Malta , Year: 2002

Estimation Method: Projection. Uncertainty (80%) bounds are between 22.6 and 76.4. Uncertainty (95%) bounds are between 32.5 and 83.1.

Country: Malta , Year: 2003

Estimation Method: Projection. Uncertainty (80%) bounds are between 22.6 and 76.9. Uncertainty (95%) bounds are between 32.7 and 83.4.

Country: Malta , Year: 2004

Estimation Method: Projection. Uncertainty (80%) bounds are between 22.9 and 77.2. Uncertainty (95%) bounds are between 33.1 and 84.

Country: Malta , Year: 2005

Estimation Method: Projection. Uncertainty (80%) bounds are between 23 and 77.4. Uncertainty (95%) bounds are between 33.4 and 84.2.

Country: Malta , Year: 2006

Estimation Method: Projection. Uncertainty (80%) bounds are between 23.3 and 77.8. Uncertainty (95%) bounds are between 33.6 and 84.5.

Country: Malta , Year: 2007

Estimation Method: Projection. Uncertainty (80%) bounds are between 23.6 and 78. Uncertainty (95%) bounds are between 34 and 85.

Country: Malta , Year: 2008

Estimation Method: Projection. Uncertainty (80%) bounds are between 23.9 and 78.3. Uncertainty (95%) bounds are between 34.2 and 85.4.

Country: Malta , Year: 2009

Estimation Method: Projection. Uncertainty (80%) bounds are between 24.3 and 78.7. Uncertainty (95%) bounds are between 34.6 and 85.7.

Country: Malta , Year: 2010

Estimation Method: Projection. Uncertainty (80%) bounds are between 24.7 and 79. Uncertainty (95%) bounds are between 35 and 85.9.

Country: Malta , Year: 2011

Estimation Method: Projection. Uncertainty (80%) bounds are between 24.6 and 79.3. Uncertainty (95%) bounds are between 35.2 and 86.2.

Country: Malta , Year: 2012

Estimation Method: Projection. Uncertainty (80%) bounds are between 25 and 79.6. Uncertainty (95%) bounds are between 35.4 and 86.4.

Country: Malta , Year: 2013

Estimation Method: Projection. Uncertainty (80%) bounds are between 25.3 and 79.8. Uncertainty (95%) bounds are between 35.6 and 86.6.

Country: Malta , Year: 2014

Estimation Method: Projection. Uncertainty (80%) bounds are between 25.5 and 80.1. Uncertainty (95%) bounds are between 35.9 and 86.8.

Country: Malta , Year: 2015

Estimation Method: Projection. Uncertainty (80%) bounds are between 25.4 and 80.4. Uncertainty (95%) bounds are between 36.4 and 87.

Country: Malta , Year: 2016

Estimation Method: Projection. Uncertainty (80%) bounds are between 25.7 and 80.6. Uncertainty (95%) bounds are between 36.8 and 87.2.

Country: Malta , Year: 2017

Estimation Method: Projection. Uncertainty (80%) bounds are between 26 and 80.8. Uncertainty (95%) bounds are between 37.2 and 87.5.

Country: Malta , Year: 2018

Estimation Method: Projection. Uncertainty (80%) bounds are between 26.4 and 81. Uncertainty (95%) bounds are between 37.4 and 87.7.

Country: Malta , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 26.6 and 81.3. Uncertainty (95%) bounds are between 37.6 and 88.

Country: Malta , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 26.8 and 81.6. Uncertainty (95%) bounds are between 38 and 88.1.

Country: Malta , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 27 and 81.8. Uncertainty (95%) bounds are between 38.2 and 88.4.

Country: Malta , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 27.3 and 82. Uncertainty (95%) bounds are between 38.4 and 88.6.

Country: Montenegro , Year: 1970

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 3.9 and 11.3. Uncertainty (95%) bounds are between 4.9 and 13.9.

Country: Montenegro , Year: 1971

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 3.9 and 12.2. Uncertainty (95%) bounds are between 5.1 and 15.

Country: Montenegro , Year: 1972

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 4 and 13.1. Uncertainty (95%) bounds are between 5.3 and 16.2.

Country: Montenegro , Year: 1973

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 4.1 and 14. Uncertainty (95%) bounds are between 5.4 and 17.5.

Country: Montenegro , Year: 1974

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 4.2 and 15. Uncertainty (95%) bounds are between 5.7 and 18.7.

Country: Montenegro , Year: 1975

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 4.4 and 16. Uncertainty (95%) bounds are between 6 and 20.

Country: Montenegro , Year: 1976

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 4.6 and 17. Uncertainty (95%) bounds are between 6.2 and 21.1.

Country: Montenegro , Year: 1977

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 4.8 and 18. Uncertainty (95%) bounds are between 6.5 and 22.3.

Country: Montenegro , Year: 1978

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 5 and 19.1. Uncertainty (95%) bounds are between 6.8 and 23.7.

Country: Montenegro , Year: 1979

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 5.3 and 20.1. Uncertainty (95%) bounds are between 7.2 and 25.1.

Country: Montenegro , Year: 1980

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 5.6 and 21.1. Uncertainty (95%) bounds are between 7.6 and 26.2.

Country: Montenegro , Year: 1981

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 5.9 and 22.2. Uncertainty (95%) bounds are between 8 and 27.6.

Country: Montenegro , Year: 1982

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 6.3 and 23.2. Uncertainty (95%) bounds are between 8.5 and 28.7.

Country: Montenegro , Year: 1983

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 6.7 and 24.2. Uncertainty (95%) bounds are between 9 and 29.9.

Country: Montenegro , Year: 1984

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 7.1 and 25.2. Uncertainty (95%) bounds are between 9.6 and 30.9.

Country: Montenegro , Year: 1985

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 7.6 and 26.2. Uncertainty (95%) bounds are between 10.2 and 31.9.

Country: Montenegro , Year: 1986

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 8 and 27.2. Uncertainty (95%) bounds are between 10.8 and 32.8.

Country: Montenegro , Year: 1987

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 8.6 and 28.2. Uncertainty (95%) bounds are between 11.5 and 33.8.

Country: Montenegro , Year: 1988

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 9.1 and 29.1. Uncertainty (95%) bounds are between 12 and 34.8.

Country: Montenegro , Year: 1989

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 9.7 and 29.9. Uncertainty (95%) bounds are between 12.7 and 35.6.

Country: Montenegro , Year: 1990

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 10.2 and 30.7. Uncertainty (95%) bounds are between 13.4 and 36.

Country: Montenegro , Year: 1991

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 10.8 and 31. Uncertainty (95%) bounds are between 13.9 and 36.4.

Country: Montenegro , Year: 1992

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 11.3 and 31.3. Uncertainty (95%) bounds are between 14.5 and 36.5.

Country: Montenegro , Year: 1993

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 12 and 31.6. Uncertainty (95%) bounds are between 15.1 and 36.8.

Country: Montenegro , Year: 1994

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 12.6 and 31.8. Uncertainty (95%) bounds are between 15.8 and 37.

Country: Montenegro , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 13.2 and 31.8. Uncertainty (95%) bounds are between 16.3 and 36.7.

Country: Montenegro , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 13.9 and 31.8. Uncertainty (95%) bounds are between 17 and 36.3.

Country: Montenegro , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 14.6 and 31.7. Uncertainty (95%) bounds are between 17.7 and 35.9.

Country: Montenegro , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 15.5 and 31.4. Uncertainty (95%) bounds are between 18.4 and 35.3.

Country: Montenegro , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 16.5 and 31.1. Uncertainty (95%) bounds are between 19.2 and 34.6.

Country: Montenegro , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 17.5 and 30.4. Uncertainty (95%) bounds are between 19.9 and 33.6.

Country: Montenegro , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 16.6 and 29.7. Uncertainty (95%) bounds are between 19 and 32.7.

Country: Montenegro , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 15.8 and 28.7. Uncertainty (95%) bounds are between 18.3 and 31.7.

Country: Montenegro , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 15.2 and 27.6. Uncertainty (95%) bounds are between 17.5 and 30.5.

Country: Montenegro , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 14.7 and 26.3. Uncertainty (95%) bounds are between 16.8 and 29.1.

Country: Montenegro , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 14.3 and 25. Uncertainty (95%) bounds are between 16.2 and 27.7.

Country: Montenegro , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 13.7 and 24.4. Uncertainty (95%) bounds are between 15.6 and 27.2.

Country: Montenegro , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 13 and 24. Uncertainty (95%) bounds are between 14.9 and 26.8.

Country: Montenegro , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 12.5 and 23.4. Uncertainty (95%) bounds are between 14.3 and 26.4.

Country: Montenegro , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 11.9 and 22.8. Uncertainty (95%) bounds are between 13.8 and 25.7.

Country: Montenegro , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 11.6 and 22.1. Uncertainty (95%) bounds are between 13.4 and 25.

Country: Montenegro , Year: 2011

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 11.3 and 21.4. Uncertainty (95%) bounds are between 13.1 and 24.1.

Country: Montenegro , Year: 2012

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 11.2 and 20.6. Uncertainty (95%) bounds are between 12.8 and 23.2.

Country: Montenegro , Year: 2013

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 11.1 and 19.8. Uncertainty (95%) bounds are between 12.7 and 22.2.

Country: Montenegro , Year: 2014

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 10.6 and 19.5. Uncertainty (95%) bounds are between 12.2 and 21.8.

Country: Montenegro , Year: 2015

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 10.1 and 19.2. Uncertainty (95%) bounds are between 11.8 and 21.6.

Country: Montenegro , Year: 2016

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 9.9 and 18.9. Uncertainty (95%) bounds are between 11.5 and 21.2.

Country: Montenegro , Year: 2017

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 9.7 and 18.6. Uncertainty (95%) bounds are between 11.2 and 21.

Country: Montenegro , Year: 2018

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 9.6 and 18.5. Uncertainty (95%) bounds are between 11.1 and 21.

Country: Montenegro , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 9.4 and 19.1. Uncertainty (95%) bounds are between 11 and 21.8.

Country: Montenegro , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 9.1 and 20.1. Uncertainty (95%) bounds are between 10.8 and 23.1.

Country: Montenegro , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 8.9 and 21. Uncertainty (95%) bounds are between 10.8 and 24.5.

Country: Montenegro , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 8.7 and 22. Uncertainty (95%) bounds are between 10.7 and 25.9.

Country: Netherlands , Year: 1970

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 36 and 54.5. Uncertainty (95%) bounds are between 40 and 58.2.

Country: Netherlands , Year: 1971

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 39.6 and 57.5. Uncertainty (95%) bounds are between 43.4 and 61.

Country: Netherlands , Year: 1972

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43 and 60.4. Uncertainty (95%) bounds are between 46.7 and 63.6.

Country: Netherlands , Year: 1973

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.5 and 63. Uncertainty (95%) bounds are between 50 and 66.1.

Country: Netherlands , Year: 1974

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.9 and 65.3. Uncertainty (95%) bounds are between 53.4 and 68.3.

Country: Netherlands , Year: 1975

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.3 and 67.3. Uncertainty (95%) bounds are between 56.4 and 69.9.

Country: Netherlands , Year: 1976

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.4 and 68.5. Uncertainty (95%) bounds are between 58.3 and 71.1.

Country: Netherlands , Year: 1977

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.9 and 69.6. Uncertainty (95%) bounds are between 59.9 and 72.

Country: Netherlands , Year: 1978

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58 and 70.7. Uncertainty (95%) bounds are between 60.9 and 73.

Country: Netherlands , Year: 1979

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.7 and 71.6. Uncertainty (95%) bounds are between 61.7 and 73.9.

Country: Netherlands , Year: 1980

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.3 and 72.5. Uncertainty (95%) bounds are between 62.5 and 74.6.

Country: Netherlands , Year: 1981

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.9 and 73.1. Uncertainty (95%) bounds are between 63.2 and 75.2.

Country: Netherlands , Year: 1982

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.4 and 73.6. Uncertainty (95%) bounds are between 63.9 and 75.7.

Country: Netherlands , Year: 1983

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.4 and 73.9. Uncertainty (95%) bounds are between 64.1 and 76.

Country: Netherlands , Year: 1984

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.6 and 74.1. Uncertainty (95%) bounds are between 64.2 and 76.2.

Country: Netherlands , Year: 1985

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.7 and 74.2. Uncertainty (95%) bounds are between 64.4 and 76.1.

Country: Netherlands , Year: 1986

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.1 and 74.1. Uncertainty (95%) bounds are between 64.8 and 75.9.

Country: Netherlands , Year: 1987

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.5 and 73.9. Uncertainty (95%) bounds are between 65.2 and 75.6.

Country: Netherlands , Year: 1988

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.7 and 73.7. Uncertainty (95%) bounds are between 65.6 and 75.2.

Country: Netherlands , Year: 1989

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.9 and 74. Uncertainty (95%) bounds are between 65.6 and 75.6.

Country: Netherlands , Year: 1990

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.9 and 74.3. Uncertainty (95%) bounds are between 65.7 and 76.1.

Country: Netherlands , Year: 1991

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.8 and 74.7. Uncertainty (95%) bounds are between 65.7 and 76.6.

Country: Netherlands , Year: 1992

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.9 and 75.1. Uncertainty (95%) bounds are between 65.8 and 77.

Country: Netherlands , Year: 1993

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62 and 75.4. Uncertainty (95%) bounds are between 65.9 and 77.3.

Country: Netherlands , Year: 1994

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.9 and 75.6. Uncertainty (95%) bounds are between 65.8 and 77.6.

Country: Netherlands , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.7 and 75.7. Uncertainty (95%) bounds are between 65.8 and 77.8.

Country: Netherlands , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.5 and 75.6. Uncertainty (95%) bounds are between 65.7 and 77.6.

Country: Netherlands , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.5 and 75.5. Uncertainty (95%) bounds are between 65.8 and 77.3.

Country: Netherlands , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.5 and 75.3. Uncertainty (95%) bounds are between 65.8 and 77.

Country: Netherlands , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.4 and 75.3. Uncertainty (95%) bounds are between 65.6 and 77.2.

Country: Netherlands , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.2 and 75.4. Uncertainty (95%) bounds are between 65.5 and 77.4.

Country: Netherlands , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.1 and 75.4. Uncertainty (95%) bounds are between 65.5 and 77.3.

Country: Netherlands , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.2 and 75.4. Uncertainty (95%) bounds are between 65.5 and 77.3.

Country: Netherlands , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.1 and 75.3. Uncertainty (95%) bounds are between 65.5 and 77.

Country: Netherlands , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.9 and 75.3. Uncertainty (95%) bounds are between 65.4 and 77.2.

Country: Netherlands , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.7 and 75.4. Uncertainty (95%) bounds are between 65.3 and 77.4.

Country: Netherlands , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.6 and 75.4. Uncertainty (95%) bounds are between 65.2 and 77.3.

Country: Netherlands , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.8 and 75.2. Uncertainty (95%) bounds are between 65.2 and 77.1.

Country: Netherlands , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.7 and 75.1. Uncertainty (95%) bounds are between 65.3 and 76.8.

Country: Netherlands , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.4 and 75. Uncertainty (95%) bounds are between 64.9 and 76.9.

Country: Netherlands , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.1 and 75. Uncertainty (95%) bounds are between 64.6 and 76.9.

Country: Netherlands , Year: 2011

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.8 and 74.8. Uncertainty (95%) bounds are between 64.2 and 76.9.

Country: Netherlands , Year: 2012

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.5 and 74.7. Uncertainty (95%) bounds are between 64.1 and 76.8.

Country: Netherlands , Year: 2013

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.2 and 74.7. Uncertainty (95%) bounds are between 63.8 and 76.8.

Country: Netherlands , Year: 2014

Estimation Method: Projection. Uncertainty (80%) bounds are between 58.8 and 75.1. Uncertainty (95%) bounds are between 63.3 and 77.4.

Country: Netherlands , Year: 2015

Estimation Method: Projection. Uncertainty (80%) bounds are between 58 and 75.6. Uncertainty (95%) bounds are between 62.7 and 78.4.

Country: Netherlands , Year: 2016

Estimation Method: Projection. Uncertainty (80%) bounds are between 57 and 76.3. Uncertainty (95%) bounds are between 62 and 79.3.

Country: Netherlands , Year: 2017

Estimation Method: Projection. Uncertainty (80%) bounds are between 56 and 76.9. Uncertainty (95%) bounds are between 61.4 and 80.1.

Country: Netherlands , Year: 2018

Estimation Method: Projection. Uncertainty (80%) bounds are between 55.1 and 77.4. Uncertainty (95%) bounds are between 60.9 and 80.8.

Country: Netherlands , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 54.4 and 78. Uncertainty (95%) bounds are between 60.4 and 81.5.

Country: Netherlands , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 53.6 and 78.4. Uncertainty (95%) bounds are between 59.7 and 82.3.

Country: Netherlands , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 53.1 and 78.9. Uncertainty (95%) bounds are between 59.3 and 82.8.

Country: Netherlands , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 52.2 and 79.3. Uncertainty (95%) bounds are between 58.9 and 83.5.

Country: New Zealand , Year: 1970

Estimation Method: Projection. Uncertainty (80%) bounds are between 39.6 and 69. Uncertainty (95%) bounds are between 46.7 and 73.7.

Country: New Zealand , Year: 1971

Estimation Method: Projection. Uncertainty (80%) bounds are between 41.1 and 68.8. Uncertainty (95%) bounds are between 47.8 and 73.2.

Country: New Zealand , Year: 1972

Estimation Method: Projection. Uncertainty (80%) bounds are between 42.5 and 68.5. Uncertainty (95%) bounds are between 48.8 and 72.7.

Country: New Zealand , Year: 1973

Estimation Method: Projection. Uncertainty (80%) bounds are between 43.9 and 68.2. Uncertainty (95%) bounds are between 49.9 and 72.3.

Country: New Zealand , Year: 1974

Estimation Method: Projection. Uncertainty (80%) bounds are between 45.2 and 68. Uncertainty (95%) bounds are between 50.9 and 71.8.

Country: New Zealand , Year: 1975

Estimation Method: Projection. Uncertainty (80%) bounds are between 46.7 and 67.8. Uncertainty (95%) bounds are between 51.9 and 71.4.

Country: New Zealand , Year: 1976

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.9 and 67.7. Uncertainty (95%) bounds are between 52.7 and 71.1.

Country: New Zealand , Year: 1977

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.1 and 68.1. Uncertainty (95%) bounds are between 53.1 and 71.6.

Country: New Zealand , Year: 1978

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.5 and 68.5. Uncertainty (95%) bounds are between 53.5 and 72.

Country: New Zealand , Year: 1979

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49 and 69. Uncertainty (95%) bounds are between 53.8 and 72.6.

Country: New Zealand , Year: 1980

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.2 and 69.6. Uncertainty (95%) bounds are between 54 and 73.1.

Country: New Zealand , Year: 1981

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.5 and 69.9. Uncertainty (95%) bounds are between 54.2 and 73.4.

Country: New Zealand , Year: 1982

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.9 and 70.3. Uncertainty (95%) bounds are between 54.6 and 73.8.

Country: New Zealand , Year: 1983

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.3 and 70.5. Uncertainty (95%) bounds are between 54.9 and 74.1.

Country: New Zealand , Year: 1984

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.8 and 70.9. Uncertainty (95%) bounds are between 55.4 and 74.2.

Country: New Zealand , Year: 1985

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.5 and 71.2. Uncertainty (95%) bounds are between 56 and 74.5.

Country: New Zealand , Year: 1986

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.2 and 71.3. Uncertainty (95%) bounds are between 56.6 and 74.6.

Country: New Zealand , Year: 1987

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53 and 71.4. Uncertainty (95%) bounds are between 57.2 and 74.7.

Country: New Zealand , Year: 1988

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.8 and 71.5. Uncertainty (95%) bounds are between 57.9 and 74.7.

Country: New Zealand , Year: 1989

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.7 and 71.5. Uncertainty (95%) bounds are between 58.7 and 74.6.

Country: New Zealand , Year: 1990

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.7 and 71.7. Uncertainty (95%) bounds are between 59.4 and 74.7.

Country: New Zealand , Year: 1991

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.3 and 72.1. Uncertainty (95%) bounds are between 60 and 75.

Country: New Zealand , Year: 1992

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.7 and 72.5. Uncertainty (95%) bounds are between 60.6 and 75.3.

Country: New Zealand , Year: 1993

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.1 and 72.9. Uncertainty (95%) bounds are between 61.2 and 75.6.

Country: New Zealand , Year: 1994

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.7 and 73.4. Uncertainty (95%) bounds are between 61.7 and 75.9.

Country: New Zealand , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.2 and 73.9. Uncertainty (95%) bounds are between 62.3 and 76.4.

Country: New Zealand , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58 and 74.4. Uncertainty (95%) bounds are between 62.3 and 77.1.

Country: New Zealand , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.9 and 75.1. Uncertainty (95%) bounds are between 62.3 and 77.7.

Country: New Zealand , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.8 and 75.6. Uncertainty (95%) bounds are between 62.3 and 78.4.

Country: New Zealand , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.8 and 76.1. Uncertainty (95%) bounds are between 62.4 and 79.1.

Country: New Zealand , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.7 and 76.6. Uncertainty (95%) bounds are between 62.5 and 79.5.

Country: New Zealand , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.8 and 77. Uncertainty (95%) bounds are between 62.6 and 80.

Country: New Zealand , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58 and 77.4. Uncertainty (95%) bounds are between 62.8 and 80.4.

Country: New Zealand , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.1 and 77.7. Uncertainty (95%) bounds are between 63 and 80.8.

Country: New Zealand , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.5 and 78.1. Uncertainty (95%) bounds are between 63.3 and 81.

Country: New Zealand , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.9 and 78.3. Uncertainty (95%) bounds are between 63.7 and 81.3.

Country: New Zealand , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.5 and 78.6. Uncertainty (95%) bounds are between 64.1 and 81.6.

Country: New Zealand , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.8 and 78.7. Uncertainty (95%) bounds are between 64.6 and 81.6.

Country: New Zealand , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.5 and 78.9. Uncertainty (95%) bounds are between 65 and 81.8.

Country: New Zealand , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.3 and 79.1. Uncertainty (95%) bounds are between 65.6 and 81.8.

Country: New Zealand , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.9 and 79.2. Uncertainty (95%) bounds are between 66.2 and 81.9.

Country: New Zealand , Year: 2011

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.7 and 79.3. Uncertainty (95%) bounds are between 66.7 and 81.9.

Country: New Zealand , Year: 2012

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.5 and 79.3. Uncertainty (95%) bounds are between 67.3 and 81.9.

Country: New Zealand , Year: 2013

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.3 and 79.4. Uncertainty (95%) bounds are between 67.9 and 82.

Country: New Zealand , Year: 2014

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.7 and 79.6. Uncertainty (95%) bounds are between 68.4 and 82.1.

Country: New Zealand , Year: 2015

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.8 and 79.8. Uncertainty (95%) bounds are between 68.4 and 82.3.

Country: New Zealand , Year: 2016

Estimation Method: Projection. Uncertainty (80%) bounds are between 64.3 and 80.2. Uncertainty (95%) bounds are between 68.2 and 82.8.

Country: New Zealand , Year: 2017

Estimation Method: Projection. Uncertainty (80%) bounds are between 63.7 and 80.6. Uncertainty (95%) bounds are between 67.8 and 83.3.

Country: New Zealand , Year: 2018

Estimation Method: Projection. Uncertainty (80%) bounds are between 62.8 and 81. Uncertainty (95%) bounds are between 67.4 and 83.8.

Country: New Zealand , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 61.8 and 81.4. Uncertainty (95%) bounds are between 66.9 and 84.3.

Country: New Zealand , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 61 and 81.8. Uncertainty (95%) bounds are between 66.4 and 84.7.

Country: New Zealand , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 60.3 and 82. Uncertainty (95%) bounds are between 65.9 and 85.2.

Country: New Zealand , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 59.7 and 82.4. Uncertainty (95%) bounds are between 65.5 and 85.7.

Country: North Macedonia , Year: 1970

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 1.4 and 5.2. Uncertainty (95%) bounds are between 1.9 and 6.7.

Country: North Macedonia , Year: 1971

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 1.5 and 5.6. Uncertainty (95%) bounds are between 2 and 7.2.

Country: North Macedonia , Year: 1972

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 1.5 and 6. Uncertainty (95%) bounds are between 2 and 7.9.

Country: North Macedonia , Year: 1973

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 1.5 and 6.5. Uncertainty (95%) bounds are between 2.1 and 8.6.

Country: North Macedonia , Year: 1974

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 1.6 and 7. Uncertainty (95%) bounds are between 2.2 and 9.3.

Country: North Macedonia , Year: 1975

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 1.6 and 7.5. Uncertainty (95%) bounds are between 2.3 and 10.1.

Country: North Macedonia , Year: 1976

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 1.7 and 8. Uncertainty (95%) bounds are between 2.4 and 10.8.

Country: North Macedonia , Year: 1977

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 1.7 and 8.5. Uncertainty (95%) bounds are between 2.5 and 11.6.

Country: North Macedonia , Year: 1978

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 1.8 and 9.1. Uncertainty (95%) bounds are between 2.6 and 12.4.

Country: North Macedonia , Year: 1979

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 1.9 and 9.7. Uncertainty (95%) bounds are between 2.7 and 13.1.

Country: North Macedonia , Year: 1980

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 2 and 10.3. Uncertainty (95%) bounds are between 2.8 and 13.9.

Country: North Macedonia , Year: 1981

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 2 and 10.8. Uncertainty (95%) bounds are between 2.9 and 14.7.

Country: North Macedonia , Year: 1982

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 2.1 and 11.4. Uncertainty (95%) bounds are between 3.1 and 15.4.

Country: North Macedonia , Year: 1983

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 2.2 and 12. Uncertainty (95%) bounds are between 3.2 and 16.1.

Country: North Macedonia , Year: 1984

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 2.3 and 12.7. Uncertainty (95%) bounds are between 3.4 and 16.8.

Country: North Macedonia , Year: 1985

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 2.4 and 13.2. Uncertainty (95%) bounds are between 3.6 and 17.7.

Country: North Macedonia , Year: 1986

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 2.6 and 13.8. Uncertainty (95%) bounds are between 3.7 and 18.6.

Country: North Macedonia , Year: 1987

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 2.7 and 14.4. Uncertainty (95%) bounds are between 3.9 and 19.4.

Country: North Macedonia , Year: 1988

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 2.9 and 15. Uncertainty (95%) bounds are between 4.1 and 20.2.

Country: North Macedonia , Year: 1989

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 3 and 15.7. Uncertainty (95%) bounds are between 4.3 and 20.8.

Country: North Macedonia , Year: 1990

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 3.1 and 16.2. Uncertainty (95%) bounds are between 4.5 and 21.4.

Country: North Macedonia , Year: 1991

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 3.2 and 16.5. Uncertainty (95%) bounds are between 4.7 and 22.

Country: North Macedonia , Year: 1992

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 3.3 and 16.9. Uncertainty (95%) bounds are between 4.8 and 22.3.

Country: North Macedonia , Year: 1993

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 3.4 and 17.1. Uncertainty (95%) bounds are between 5 and 22.6.

Country: North Macedonia , Year: 1994

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 3.5 and 17.3. Uncertainty (95%) bounds are between 5.1 and 22.8.

Country: North Macedonia , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 3.7 and 17.6. Uncertainty (95%) bounds are between 5.3 and 23.

Country: North Macedonia , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 3.8 and 17.8. Uncertainty (95%) bounds are between 5.4 and 23.1.

Country: North Macedonia , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 3.9 and 18. Uncertainty (95%) bounds are between 5.6 and 23.2.

Country: North Macedonia , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 4.1 and 18.1. Uncertainty (95%) bounds are between 5.8 and 23.4.

Country: North Macedonia , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 4.2 and 18.2. Uncertainty (95%) bounds are between 6 and 23.4.

Country: North Macedonia , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 4.4 and 18.3. Uncertainty (95%) bounds are between 6.1 and 23.2.

Country: North Macedonia , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 4.6 and 18.4. Uncertainty (95%) bounds are between 6.3 and 23.3.

Country: North Macedonia , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 4.8 and 18.4. Uncertainty (95%) bounds are between 6.5 and 23.3.

Country: North Macedonia , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 4.9 and 18.4. Uncertainty (95%) bounds are between 6.7 and 23.1.

Country: North Macedonia , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 5.2 and 18.3. Uncertainty (95%) bounds are between 6.9 and 22.8.

Country: North Macedonia , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 5.4 and 18.3. Uncertainty (95%) bounds are between 7.1 and 22.5.

Country: North Macedonia , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 5.7 and 18.1. Uncertainty (95%) bounds are between 7.4 and 22.2.

Country: North Macedonia , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 6 and 17.9. Uncertainty (95%) bounds are between 7.7 and 21.7.

Country: North Macedonia , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 6.3 and 17.7. Uncertainty (95%) bounds are between 8 and 21.2.

Country: North Macedonia , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 6.8 and 17.4. Uncertainty (95%) bounds are between 8.4 and 20.5.

Country: North Macedonia , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 7.3 and 17.2. Uncertainty (95%) bounds are between 8.8 and 20.1.

Country: North Macedonia , Year: 2011

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 7.8 and 16.9. Uncertainty (95%) bounds are between 9.3 and 19.5.

Country: North Macedonia , Year: 2012

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 7.9 and 17.7. Uncertainty (95%) bounds are between 9.5 and 20.6.

Country: North Macedonia , Year: 2013

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 8.1 and 18.5. Uncertainty (95%) bounds are between 9.7 and 21.3.

Country: North Macedonia , Year: 2014

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 8.3 and 19.3. Uncertainty (95%) bounds are between 10.1 and 22.4.

Country: North Macedonia , Year: 2015

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 8.6 and 19.9. Uncertainty (95%) bounds are between 10.4 and 23.1.

Country: North Macedonia , Year: 2016

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 9 and 20.5. Uncertainty (95%) bounds are between 10.9 and 23.6.

Country: North Macedonia , Year: 2017

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 9.6 and 21. Uncertainty (95%) bounds are between 11.5 and 24.1.

Country: North Macedonia , Year: 2018

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 10.1 and 21.5. Uncertainty (95%) bounds are between 12.1 and 24.4.

Country: North Macedonia , Year: 2019

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 10.6 and 22.2. Uncertainty (95%) bounds are between 12.6 and 25.4.

Country: North Macedonia , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 10.5 and 23.8. Uncertainty (95%) bounds are between 12.8 and 27.4.

Country: North Macedonia , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 10.5 and 25.4. Uncertainty (95%) bounds are between 13 and 29.3.

Country: North Macedonia , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 10.6 and 26.8. Uncertainty (95%) bounds are between 13.3 and 31.3.

Country: Norway , Year: 1970

Estimation Method: Projection. Uncertainty (80%) bounds are between 29.8 and 67.6. Uncertainty (95%) bounds are between 39.6 and 72.8.

Country: Norway , Year: 1971

Estimation Method: Projection. Uncertainty (80%) bounds are between 31.2 and 67.6. Uncertainty (95%) bounds are between 40.8 and 72.5.

Country: Norway , Year: 1972

Estimation Method: Projection. Uncertainty (80%) bounds are between 32.7 and 67.6. Uncertainty (95%) bounds are between 42 and 72.2.

Country: Norway , Year: 1973

Estimation Method: Projection. Uncertainty (80%) bounds are between 33.9 and 67.5. Uncertainty (95%) bounds are between 43.2 and 71.9.

Country: Norway , Year: 1974

Estimation Method: Projection. Uncertainty (80%) bounds are between 35.1 and 67.5. Uncertainty (95%) bounds are between 44.4 and 71.7.

Country: Norway , Year: 1975

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.6 and 67.4. Uncertainty (95%) bounds are between 45.8 and 71.4.

Country: Norway , Year: 1976

Estimation Method: Projection. Uncertainty (80%) bounds are between 37.7 and 67.5. Uncertainty (95%) bounds are between 47.1 and 71.1.

Country: Norway , Year: 1977

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.7 and 67.5. Uncertainty (95%) bounds are between 48.3 and 71.1.

Country: Norway , Year: 1978

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 39.7 and 67.8. Uncertainty (95%) bounds are between 49 and 71.2.

Country: Norway , Year: 1979

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 40.2 and 68.2. Uncertainty (95%) bounds are between 49.7 and 71.7.

Country: Norway , Year: 1980

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 41 and 68.7. Uncertainty (95%) bounds are between 50.1 and 72.2.

Country: Norway , Year: 1981

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 41.6 and 69.3. Uncertainty (95%) bounds are between 50.7 and 72.7.

Country: Norway , Year: 1982

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42.5 and 69.7. Uncertainty (95%) bounds are between 51.4 and 73.2.

Country: Norway , Year: 1983

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43.5 and 70.1. Uncertainty (95%) bounds are between 52.1 and 73.5.

Country: Norway , Year: 1984

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.3 and 70.5. Uncertainty (95%) bounds are between 52.8 and 73.7.

Country: Norway , Year: 1985

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 45.1 and 70.8. Uncertainty (95%) bounds are between 53.6 and 73.9.

Country: Norway , Year: 1986

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46 and 71. Uncertainty (95%) bounds are between 54.6 and 74.1.

Country: Norway , Year: 1987

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.2 and 71.3. Uncertainty (95%) bounds are between 55.6 and 74.1.

Country: Norway , Year: 1988

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.3 and 71.5. Uncertainty (95%) bounds are between 56.7 and 74.2.

Country: Norway , Year: 1989

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.4 and 71.9. Uncertainty (95%) bounds are between 57.6 and 74.5.

Country: Norway , Year: 1990

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.3 and 72.6. Uncertainty (95%) bounds are between 58.2 and 75.2.

Country: Norway , Year: 1991

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.2 and 73.6. Uncertainty (95%) bounds are between 58.8 and 76.

Country: Norway , Year: 1992

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.8 and 74.5. Uncertainty (95%) bounds are between 59.5 and 77.

Country: Norway , Year: 1993

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.3 and 75.5. Uncertainty (95%) bounds are between 60.2 and 77.9.

Country: Norway , Year: 1994

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.1 and 76.4. Uncertainty (95%) bounds are between 60.9 and 78.7.

Country: Norway , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.8 and 77.2. Uncertainty (95%) bounds are between 61.7 and 79.4.

Country: Norway , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.3 and 78. Uncertainty (95%) bounds are between 62.5 and 80.

Country: Norway , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.9 and 78.6. Uncertainty (95%) bounds are between 63.2 and 80.5.

Country: Norway , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.5 and 79.2. Uncertainty (95%) bounds are between 63.7 and 80.9.

Country: Norway , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56 and 79.9. Uncertainty (95%) bounds are between 64.4 and 81.8.

Country: Norway , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.6 and 80.6. Uncertainty (95%) bounds are between 64.9 and 82.4.

Country: Norway , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.1 and 81.1. Uncertainty (95%) bounds are between 65.4 and 83.

Country: Norway , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.7 and 81.6. Uncertainty (95%) bounds are between 65.9 and 83.5.

Country: Norway , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.5 and 82. Uncertainty (95%) bounds are between 66.6 and 83.8.

Country: Norway , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.1 and 82.3. Uncertainty (95%) bounds are between 67.2 and 84.

Country: Norway , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.8 and 82.6. Uncertainty (95%) bounds are between 67.7 and 84.2.

Country: Norway , Year: 2006

Estimation Method: Projection. Uncertainty (80%) bounds are between 59.7 and 83. Uncertainty (95%) bounds are between 67.7 and 84.8.

Country: Norway , Year: 2007

Estimation Method: Projection. Uncertainty (80%) bounds are between 59.5 and 83.4. Uncertainty (95%) bounds are between 67.7 and 85.4.

Country: Norway , Year: 2008

Estimation Method: Projection. Uncertainty (80%) bounds are between 59.3 and 83.8. Uncertainty (95%) bounds are between 67.8 and 86.1.

Country: Norway , Year: 2009

Estimation Method: Projection. Uncertainty (80%) bounds are between 59.2 and 84.2. Uncertainty (95%) bounds are between 67.7 and 86.6.

Country: Norway , Year: 2010

Estimation Method: Projection. Uncertainty (80%) bounds are between 58.9 and 84.6. Uncertainty (95%) bounds are between 67.5 and 87.

Country: Norway , Year: 2011

Estimation Method: Projection. Uncertainty (80%) bounds are between 58.6 and 85. Uncertainty (95%) bounds are between 67.2 and 87.4.

Country: Norway , Year: 2012

Estimation Method: Projection. Uncertainty (80%) bounds are between 58.6 and 85.3. Uncertainty (95%) bounds are between 67.1 and 87.9.

Country: Norway , Year: 2013

Estimation Method: Projection. Uncertainty (80%) bounds are between 58.2 and 85.6. Uncertainty (95%) bounds are between 67 and 88.2.

Country: Norway , Year: 2014

Estimation Method: Projection. Uncertainty (80%) bounds are between 58.1 and 85.8. Uncertainty (95%) bounds are between 66.7 and 88.6.

Country: Norway , Year: 2015

Estimation Method: Projection. Uncertainty (80%) bounds are between 57.6 and 86.1. Uncertainty (95%) bounds are between 66.6 and 88.9.

Country: Norway , Year: 2016

Estimation Method: Projection. Uncertainty (80%) bounds are between 57.2 and 86.3. Uncertainty (95%) bounds are between 66.2 and 89.2.

Country: Norway , Year: 2017

Estimation Method: Projection. Uncertainty (80%) bounds are between 57.1 and 86.6. Uncertainty (95%) bounds are between 66 and 89.5.

Country: Norway , Year: 2018

Estimation Method: Projection. Uncertainty (80%) bounds are between 56.6 and 86.9. Uncertainty (95%) bounds are between 65.9 and 89.8.

Country: Norway , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 56.3 and 87.1. Uncertainty (95%) bounds are between 65.8 and 90.

Country: Norway , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 56.1 and 87.3. Uncertainty (95%) bounds are between 65.7 and 90.3.

Country: Norway , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 55.7 and 87.5. Uncertainty (95%) bounds are between 65.6 and 90.5.

Country: Norway , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 55.6 and 87.7. Uncertainty (95%) bounds are between 65.2 and 90.7.

Country: Poland , Year: 1970

Estimation Method: Projection. Uncertainty (80%) bounds are between 6.1 and 17.3. Uncertainty (95%) bounds are between 7.8 and 20.8.

Country: Poland , Year: 1971

Estimation Method: Projection. Uncertainty (80%) bounds are between 6.8 and 17.4. Uncertainty (95%) bounds are between 8.5 and 20.5.

Country: Poland , Year: 1972

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 7.6 and 17.5. Uncertainty (95%) bounds are between 9.2 and 20.4.

Country: Poland , Year: 1973

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 8.4 and 19.8. Uncertainty (95%) bounds are between 10.2 and 23.

Country: Poland , Year: 1974

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 9.4 and 22.1. Uncertainty (95%) bounds are between 11.4 and 25.6.

Country: Poland , Year: 1975

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 10.6 and 24.3. Uncertainty (95%) bounds are between 12.8 and 28.2.

Country: Poland , Year: 1976

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 12 and 26.6. Uncertainty (95%) bounds are between 14.6 and 30.4.

Country: Poland , Year: 1977

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 13.9 and 28.8. Uncertainty (95%) bounds are between 16.5 and 32.6.

Country: Poland , Year: 1978

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 13.9 and 30.1. Uncertainty (95%) bounds are between 16.8 and 34.2.

Country: Poland , Year: 1979

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 14.1 and 31.2. Uncertainty (95%) bounds are between 17.1 and 35.6.

Country: Poland , Year: 1980

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 14.3 and 32.2. Uncertainty (95%) bounds are between 17.4 and 36.9.

Country: Poland , Year: 1981

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 14.5 and 33.1. Uncertainty (95%) bounds are between 17.8 and 37.8.

Country: Poland , Year: 1982

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 14.8 and 34. Uncertainty (95%) bounds are between 18.2 and 38.8.

Country: Poland , Year: 1983

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 15.3 and 34.8. Uncertainty (95%) bounds are between 18.7 and 39.5.

Country: Poland , Year: 1984

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 15.8 and 35.4. Uncertainty (95%) bounds are between 19.3 and 40.

Country: Poland , Year: 1985

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 16.3 and 36. Uncertainty (95%) bounds are between 19.9 and 40.8.

Country: Poland , Year: 1986

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 17.1 and 36.5. Uncertainty (95%) bounds are between 20.6 and 41.2.

Country: Poland , Year: 1987

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 17.9 and 36.9. Uncertainty (95%) bounds are between 21.3 and 41.5.

Country: Poland , Year: 1988

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 18.8 and 37.2. Uncertainty (95%) bounds are between 22.2 and 41.7.

Country: Poland , Year: 1989

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 19.8 and 37.4. Uncertainty (95%) bounds are between 23.1 and 41.5.

Country: Poland , Year: 1990

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 21 and 37.5. Uncertainty (95%) bounds are between 24.2 and 41.4.

Country: Poland , Year: 1991

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 22.5 and 37.5. Uncertainty (95%) bounds are between 25.4 and 40.9.

Country: Poland , Year: 1992

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 22.5 and 39.4. Uncertainty (95%) bounds are between 25.6 and 43.

Country: Poland , Year: 1993

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 22.3 and 40.9. Uncertainty (95%) bounds are between 25.9 and 45.1.

Country: Poland , Year: 1994

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 22.4 and 42.4. Uncertainty (95%) bounds are between 26.3 and 46.8.

Country: Poland , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 22.7 and 43.8. Uncertainty (95%) bounds are between 26.8 and 48.2.

Country: Poland , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 23 and 45.1. Uncertainty (95%) bounds are between 27.4 and 49.7.

Country: Poland , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 23.6 and 46.2. Uncertainty (95%) bounds are between 28 and 51.

Country: Poland , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 24 and 47.3. Uncertainty (95%) bounds are between 28.7 and 52.1.

Country: Poland , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 24.8 and 48.2. Uncertainty (95%) bounds are between 29.4 and 53.1.

Country: Poland , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 25.5 and 49.2. Uncertainty (95%) bounds are between 30.1 and 54.

Country: Poland , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 26.3 and 50. Uncertainty (95%) bounds are between 31 and 54.9.

Country: Poland , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 27.2 and 50.8. Uncertainty (95%) bounds are between 31.9 and 55.5.

Country: Poland , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 28 and 51.4. Uncertainty (95%) bounds are between 32.8 and 56.2.

Country: Poland , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 29.2 and 52. Uncertainty (95%) bounds are between 33.8 and 56.5.

Country: Poland , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 30.4 and 52.4. Uncertainty (95%) bounds are between 34.9 and 57.

Country: Poland , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 31.3 and 52.9. Uncertainty (95%) bounds are between 36 and 57.2.

Country: Poland , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 32.8 and 53.3. Uncertainty (95%) bounds are between 37.1 and 57.3.

Country: Poland , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.2 and 53.6. Uncertainty (95%) bounds are between 38.4 and 57.3.

Country: Poland , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 36 and 53.8. Uncertainty (95%) bounds are between 39.9 and 57.2.

Country: Poland , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.2 and 54.2. Uncertainty (95%) bounds are between 41.6 and 57.2.

Country: Poland , Year: 2011

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 39.9 and 54.8. Uncertainty (95%) bounds are between 43.2 and 57.6.

Country: Poland , Year: 2012

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 41.5 and 55.6. Uncertainty (95%) bounds are between 44.8 and 58.3.

Country: Poland , Year: 2013

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43.5 and 56.4. Uncertainty (95%) bounds are between 46.4 and 58.8.

Country: Poland , Year: 2014

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 45.5 and 57.1. Uncertainty (95%) bounds are between 48.1 and 59.2.

Country: Poland , Year: 2015

Estimation Method: Projection. Uncertainty (80%) bounds are between 44.9 and 58.8. Uncertainty (95%) bounds are between 48 and 61.4.

Country: Poland , Year: 2016

Estimation Method: Projection. Uncertainty (80%) bounds are between 44.1 and 60.4. Uncertainty (95%) bounds are between 47.8 and 63.2.

Country: Poland , Year: 2017

Estimation Method: Projection. Uncertainty (80%) bounds are between 43.4 and 61.6. Uncertainty (95%) bounds are between 47.6 and 65.

Country: Poland , Year: 2018

Estimation Method: Projection. Uncertainty (80%) bounds are between 42.8 and 62.9. Uncertainty (95%) bounds are between 47.4 and 66.5.

Country: Poland , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 42.3 and 64.2. Uncertainty (95%) bounds are between 47.3 and 67.9.

Country: Poland , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 41.9 and 65.2. Uncertainty (95%) bounds are between 47.2 and 69.5.

Country: Poland , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 41.5 and 66.2. Uncertainty (95%) bounds are between 47.1 and 70.7.

Country: Poland , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 41.3 and 67.1. Uncertainty (95%) bounds are between 47.1 and 71.6.

Country: Portugal , Year: 1970

Estimation Method: Projection. Uncertainty (80%) bounds are between 9.4 and 40.7. Uncertainty (95%) bounds are between 14 and 48.6.

Country: Portugal , Year: 1971

Estimation Method: Projection. Uncertainty (80%) bounds are between 10.4 and 41.5. Uncertainty (95%) bounds are between 14.9 and 49.1.

Country: Portugal , Year: 1972

Estimation Method: Projection. Uncertainty (80%) bounds are between 11.5 and 42.1. Uncertainty (95%) bounds are between 16.1 and 49.6.

Country: Portugal , Year: 1973

Estimation Method: Projection. Uncertainty (80%) bounds are between 12.5 and 42.8. Uncertainty (95%) bounds are between 17.3 and 49.9.

Country: Portugal , Year: 1974

Estimation Method: Projection. Uncertainty (80%) bounds are between 13.7 and 43.5. Uncertainty (95%) bounds are between 18.6 and 50.5.

Country: Portugal , Year: 1975

Estimation Method: Projection. Uncertainty (80%) bounds are between 15 and 44.1. Uncertainty (95%) bounds are between 19.9 and 50.7.

Country: Portugal , Year: 1976

Estimation Method: Projection. Uncertainty (80%) bounds are between 16.5 and 44.6. Uncertainty (95%) bounds are between 21.3 and 50.9.

Country: Portugal , Year: 1977

Estimation Method: Projection. Uncertainty (80%) bounds are between 18.1 and 45.1. Uncertainty (95%) bounds are between 22.8 and 51.

Country: Portugal , Year: 1978

Estimation Method: Projection. Uncertainty (80%) bounds are between 19.8 and 45.6. Uncertainty (95%) bounds are between 24.6 and 51.3.

Country: Portugal , Year: 1979

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 21.6 and 46.1. Uncertainty (95%) bounds are between 26.2 and 51.6.

Country: Portugal , Year: 1980

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 22.5 and 47.1. Uncertainty (95%) bounds are between 27.3 and 52.3.

Country: Portugal , Year: 1981

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 22.7 and 48.6. Uncertainty (95%) bounds are between 28 and 53.7.

Country: Portugal , Year: 1982

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 23.2 and 49.9. Uncertainty (95%) bounds are between 28.7 and 55.3.

Country: Portugal , Year: 1983

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 23.8 and 51.2. Uncertainty (95%) bounds are between 29.5 and 56.7.

Country: Portugal , Year: 1984

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 24.2 and 52.5. Uncertainty (95%) bounds are between 30.3 and 58.

Country: Portugal , Year: 1985

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 24.8 and 53.6. Uncertainty (95%) bounds are between 31 and 59.1.

Country: Portugal , Year: 1986

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 25.4 and 54.9. Uncertainty (95%) bounds are between 31.8 and 60.5.

Country: Portugal , Year: 1987

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 26.1 and 56.1. Uncertainty (95%) bounds are between 32.6 and 61.5.

Country: Portugal , Year: 1988

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 26.7 and 57.2. Uncertainty (95%) bounds are between 33.5 and 62.2.

Country: Portugal , Year: 1989

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 27.5 and 58.5. Uncertainty (95%) bounds are between 34.4 and 63.2.

Country: Portugal , Year: 1990

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 28.2 and 59.5. Uncertainty (95%) bounds are between 35.6 and 64.2.

Country: Portugal , Year: 1991

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 29 and 60.7. Uncertainty (95%) bounds are between 36.3 and 65.3.

Country: Portugal , Year: 1992

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 29.9 and 61.9. Uncertainty (95%) bounds are between 37.2 and 66.5.

Country: Portugal , Year: 1993

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 30.5 and 63.4. Uncertainty (95%) bounds are between 38.3 and 67.6.

Country: Portugal , Year: 1994

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 31.4 and 64.6. Uncertainty (95%) bounds are between 39.2 and 68.9.

Country: Portugal , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 32.1 and 65.8. Uncertainty (95%) bounds are between 40.3 and 69.8.

Country: Portugal , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 33.3 and 67. Uncertainty (95%) bounds are between 41.3 and 70.8.

Country: Portugal , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 33.8 and 68.1. Uncertainty (95%) bounds are between 42.4 and 71.8.

Country: Portugal , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34 and 69.1. Uncertainty (95%) bounds are between 42.6 and 72.9.

Country: Portugal , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.2 and 70.1. Uncertainty (95%) bounds are between 43.1 and 74.

Country: Portugal , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.4 and 71.1. Uncertainty (95%) bounds are between 43.5 and 74.9.

Country: Portugal , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.8 and 71.9. Uncertainty (95%) bounds are between 44 and 75.8.

Country: Portugal , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.7 and 72.7. Uncertainty (95%) bounds are between 44.4 and 76.6.

Country: Portugal , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 35.1 and 73.5. Uncertainty (95%) bounds are between 44.9 and 77.4.

Country: Portugal , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 35.3 and 74. Uncertainty (95%) bounds are between 45.4 and 77.7.

Country: Portugal , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 35.8 and 74.3. Uncertainty (95%) bounds are between 45.7 and 78.1.

Country: Portugal , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 36.1 and 74.4. Uncertainty (95%) bounds are between 45.7 and 78.1.

Country: Portugal , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 36 and 74.2. Uncertainty (95%) bounds are between 46.1 and 78.

Country: Portugal , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 36 and 73.9. Uncertainty (95%) bounds are between 46.2 and 77.7.

Country: Portugal , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 36.2 and 73.5. Uncertainty (95%) bounds are between 46.2 and 77.2.

Country: Portugal , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 36.4 and 73. Uncertainty (95%) bounds are between 46.3 and 76.7.

Country: Portugal , Year: 2011

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 36.3 and 72.5. Uncertainty (95%) bounds are between 46.3 and 76.1.

Country: Portugal , Year: 2012

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 36.6 and 72. Uncertainty (95%) bounds are between 46.4 and 75.4.

Country: Portugal , Year: 2013

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 36.8 and 71.5. Uncertainty (95%) bounds are between 46.5 and 75.

Country: Portugal , Year: 2014

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 36.9 and 71.1. Uncertainty (95%) bounds are between 46.5 and 74.4.

Country: Portugal , Year: 2015

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.6 and 71.3. Uncertainty (95%) bounds are between 46.8 and 74.6.

Country: Portugal , Year: 2016

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.6 and 71.6. Uncertainty (95%) bounds are between 46.7 and 75.3.

Country: Portugal , Year: 2017

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.6 and 72. Uncertainty (95%) bounds are between 46.7 and 76.

Country: Portugal , Year: 2018

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.7 and 72.5. Uncertainty (95%) bounds are between 46.6 and 76.8.

Country: Portugal , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.6 and 73. Uncertainty (95%) bounds are between 46.6 and 77.3.

Country: Portugal , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.5 and 73.5. Uncertainty (95%) bounds are between 46.6 and 78.

Country: Portugal , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.7 and 74. Uncertainty (95%) bounds are between 46.5 and 78.6.

Country: Portugal , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.5 and 74.5. Uncertainty (95%) bounds are between 46.6 and 79.2.

Country: Republic of Kazakhstan , Year: 1970

Estimation Method: Projection. Uncertainty (80%) bounds are between 6.9 and 53.5. Uncertainty (95%) bounds are between 12.9 and 63.8.

Country: Republic of Kazakhstan , Year: 1971

Estimation Method: Projection. Uncertainty (80%) bounds are between 7.5 and 53.5. Uncertainty (95%) bounds are between 13.7 and 63.5.

Country: Republic of Kazakhstan , Year: 1972

Estimation Method: Projection. Uncertainty (80%) bounds are between 8.3 and 53.5. Uncertainty (95%) bounds are between 14.4 and 63.4.

Country: Republic of Kazakhstan , Year: 1973

Estimation Method: Projection. Uncertainty (80%) bounds are between 9.1 and 53.5. Uncertainty (95%) bounds are between 15.3 and 63.1.

Country: Republic of Kazakhstan , Year: 1974

Estimation Method: Projection. Uncertainty (80%) bounds are between 9.9 and 53.5. Uncertainty (95%) bounds are between 16.2 and 62.8.

Country: Republic of Kazakhstan , Year: 1975

Estimation Method: Projection. Uncertainty (80%) bounds are between 10.7 and 53.5. Uncertainty (95%) bounds are between 17.2 and 62.4.

Country: Republic of Kazakhstan , Year: 1976

Estimation Method: Projection. Uncertainty (80%) bounds are between 11.5 and 53.3. Uncertainty (95%) bounds are between 18.3 and 62.1.

Country: Republic of Kazakhstan , Year: 1977

Estimation Method: Projection. Uncertainty (80%) bounds are between 12.5 and 53.4. Uncertainty (95%) bounds are between 19.2 and 61.8.

Country: Republic of Kazakhstan , Year: 1978

Estimation Method: Projection. Uncertainty (80%) bounds are between 13.6 and 53.5. Uncertainty (95%) bounds are between 20.3 and 61.8.

Country: Republic of Kazakhstan , Year: 1979

Estimation Method: Projection. Uncertainty (80%) bounds are between 14.6 and 53.4. Uncertainty (95%) bounds are between 21.4 and 61.4.

Country: Republic of Kazakhstan , Year: 1980

Estimation Method: Projection. Uncertainty (80%) bounds are between 15.8 and 53.4. Uncertainty (95%) bounds are between 22.4 and 60.9.

Country: Republic of Kazakhstan , Year: 1981

Estimation Method: Projection. Uncertainty (80%) bounds are between 17 and 53.3. Uncertainty (95%) bounds are between 23.5 and 60.5.

Country: Republic of Kazakhstan , Year: 1982

Estimation Method: Projection. Uncertainty (80%) bounds are between 18.3 and 53.1. Uncertainty (95%) bounds are between 24.7 and 60.1.

Country: Republic of Kazakhstan , Year: 1983

Estimation Method: Projection. Uncertainty (80%) bounds are between 19.6 and 52.9. Uncertainty (95%) bounds are between 25.9 and 59.6.

Country: Republic of Kazakhstan , Year: 1984

Estimation Method: Projection. Uncertainty (80%) bounds are between 21 and 52.8. Uncertainty (95%) bounds are between 27.1 and 59.2.

Country: Republic of Kazakhstan , Year: 1985

Estimation Method: Projection. Uncertainty (80%) bounds are between 22.6 and 52.6. Uncertainty (95%) bounds are between 28.4 and 58.7.

Country: Republic of Kazakhstan , Year: 1986

Estimation Method: Projection. Uncertainty (80%) bounds are between 24.1 and 52.3. Uncertainty (95%) bounds are between 29.8 and 58.2.

Country: Republic of Kazakhstan , Year: 1987

Estimation Method: Projection. Uncertainty (80%) bounds are between 25.7 and 52.1. Uncertainty (95%) bounds are between 31.1 and 57.7.

Country: Republic of Kazakhstan , Year: 1988

Estimation Method: Projection. Uncertainty (80%) bounds are between 27.6 and 51.9. Uncertainty (95%) bounds are between 32.5 and 56.9.

Country: Republic of Kazakhstan , Year: 1989

Estimation Method: Projection. Uncertainty (80%) bounds are between 29.5 and 51.6. Uncertainty (95%) bounds are between 34 and 56.1.

Country: Republic of Kazakhstan , Year: 1990

Estimation Method: Projection. Uncertainty (80%) bounds are between 31.5 and 51.2. Uncertainty (95%) bounds are between 35.5 and 55.4.

Country: Republic of Kazakhstan , Year: 1991

Estimation Method: Projection. Uncertainty (80%) bounds are between 33.5 and 51. Uncertainty (95%) bounds are between 37.1 and 54.6.

Country: Republic of Kazakhstan , Year: 1992

Estimation Method: Projection. Uncertainty (80%) bounds are between 35.9 and 50.6. Uncertainty (95%) bounds are between 38.9 and 53.7.

Country: Republic of Kazakhstan , Year: 1993

Estimation Method: Projection. Uncertainty (80%) bounds are between 38.3 and 50.3. Uncertainty (95%) bounds are between 40.7 and 52.8.

Country: Republic of Kazakhstan , Year: 1994

Estimation Method: Projection. Uncertainty (80%) bounds are between 40.8 and 50. Uncertainty (95%) bounds are between 42.7 and 52.

Country: Republic of Kazakhstan , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43.4 and 49.9. Uncertainty (95%) bounds are between 44.8 and 51.4.

Country: Republic of Kazakhstan , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.6 and 52.1. Uncertainty (95%) bounds are between 46.2 and 53.6.

Country: Republic of Kazakhstan , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.2 and 54.2. Uncertainty (95%) bounds are between 48 and 55.8.

Country: Republic of Kazakhstan , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.2 and 55.8. Uncertainty (95%) bounds are between 49.9 and 57.2.

Country: Republic of Kazakhstan , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.2 and 56.7. Uncertainty (95%) bounds are between 51.7 and 57.9.

Country: Republic of Kazakhstan , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.5 and 57.9. Uncertainty (95%) bounds are between 51.4 and 59.6.

Country: Republic of Kazakhstan , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.4 and 58.6. Uncertainty (95%) bounds are between 50.7 and 60.6.

Country: Republic of Kazakhstan , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.2 and 58.8. Uncertainty (95%) bounds are between 49.7 and 61.1.

Country: Republic of Kazakhstan , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.1 and 58.7. Uncertainty (95%) bounds are between 48.8 and 61.2.

Country: Republic of Kazakhstan , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 45.2 and 58.2. Uncertainty (95%) bounds are between 47.9 and 60.9.

Country: Republic of Kazakhstan , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.3 and 57.6. Uncertainty (95%) bounds are between 47.1 and 60.3.

Country: Republic of Kazakhstan , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43.7 and 57. Uncertainty (95%) bounds are between 46.5 and 59.8.

Country: Republic of Kazakhstan , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43.1 and 56.6. Uncertainty (95%) bounds are between 46 and 59.5.

Country: Republic of Kazakhstan , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42.7 and 56.3. Uncertainty (95%) bounds are between 45.5 and 59.2.

Country: Republic of Kazakhstan , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42.5 and 56.1. Uncertainty (95%) bounds are between 45.3 and 58.9.

Country: Republic of Kazakhstan , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42.5 and 55.9. Uncertainty (95%) bounds are between 45.3 and 58.6.

Country: Republic of Kazakhstan , Year: 2011

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42.4 and 55.8. Uncertainty (95%) bounds are between 45.3 and 58.5.

Country: Republic of Kazakhstan , Year: 2012

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42.5 and 55.7. Uncertainty (95%) bounds are between 45.2 and 58.5.

Country: Republic of Kazakhstan , Year: 2013

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42.6 and 55.6. Uncertainty (95%) bounds are between 45.4 and 58.3.

Country: Republic of Kazakhstan , Year: 2014

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43.1 and 55.4. Uncertainty (95%) bounds are between 45.6 and 57.9.

Country: Republic of Kazakhstan , Year: 2015

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43.4 and 55. Uncertainty (95%) bounds are between 45.9 and 57.4.

Country: Republic of Kazakhstan , Year: 2016

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43.5 and 54.4. Uncertainty (95%) bounds are between 45.8 and 56.7.

Country: Republic of Kazakhstan , Year: 2017

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43.4 and 53.9. Uncertainty (95%) bounds are between 45.7 and 55.9.

Country: Republic of Kazakhstan , Year: 2018

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43.2 and 53.6. Uncertainty (95%) bounds are between 45.6 and 55.7.

Country: Republic of Kazakhstan , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 42.1 and 54.4. Uncertainty (95%) bounds are between 44.9 and 56.9.

Country: Republic of Kazakhstan , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 41 and 55.6. Uncertainty (95%) bounds are between 44.2 and 58.5.

Country: Republic of Kazakhstan , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 39.9 and 56.9. Uncertainty (95%) bounds are between 43.6 and 60.2.

Country: Republic of Kazakhstan , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 38.9 and 58.1. Uncertainty (95%) bounds are between 43.1 and 61.9.

Country: Republic of Korea , Year: 1970

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 13.1 and 20.8. Uncertainty (95%) bounds are between 14.5 and 22.7.

Country: Republic of Korea , Year: 1971

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 14.5 and 22.3. Uncertainty (95%) bounds are between 16 and 24.2.

Country: Republic of Korea , Year: 1972

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 16.2 and 24.6. Uncertainty (95%) bounds are between 17.8 and 26.6.

Country: Republic of Korea , Year: 1973

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 18.2 and 27.3. Uncertainty (95%) bounds are between 20 and 29.4.

Country: Republic of Korea , Year: 1974

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 20.6 and 30.1. Uncertainty (95%) bounds are between 22.4 and 32.4.

Country: Republic of Korea , Year: 1975

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 22.8 and 33.1. Uncertainty (95%) bounds are between 24.8 and 35.5.

Country: Republic of Korea , Year: 1976

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 25 and 36.1. Uncertainty (95%) bounds are between 27.3 and 38.6.

Country: Republic of Korea , Year: 1977

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 27.2 and 39. Uncertainty (95%) bounds are between 29.6 and 41.6.

Country: Republic of Korea , Year: 1978

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 29.5 and 41.6. Uncertainty (95%) bounds are between 32 and 44.4.

Country: Republic of Korea , Year: 1979

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 32 and 44. Uncertainty (95%) bounds are between 34.4 and 46.6.

Country: Republic of Korea , Year: 1980

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 33.5 and 46.4. Uncertainty (95%) bounds are between 36.2 and 49.1.

Country: Republic of Korea , Year: 1981

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 35.3 and 48.6. Uncertainty (95%) bounds are between 38.1 and 51.3.

Country: Republic of Korea , Year: 1982

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.4 and 50.7. Uncertainty (95%) bounds are between 40.2 and 53.4.

Country: Republic of Korea , Year: 1983

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 39.5 and 53.8. Uncertainty (95%) bounds are between 42.7 and 56.7.

Country: Republic of Korea , Year: 1984

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 41.9 and 57.1. Uncertainty (95%) bounds are between 45.3 and 60.

Country: Republic of Korea , Year: 1985

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.3 and 60. Uncertainty (95%) bounds are between 47.9 and 62.9.

Country: Republic of Korea , Year: 1986

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.6 and 62.6. Uncertainty (95%) bounds are between 50.2 and 65.5.

Country: Republic of Korea , Year: 1987

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.8 and 64.8. Uncertainty (95%) bounds are between 52.5 and 67.5.

Country: Republic of Korea , Year: 1988

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.9 and 66.6. Uncertainty (95%) bounds are between 54.6 and 69.3.

Country: Republic of Korea , Year: 1989

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.5 and 68. Uncertainty (95%) bounds are between 56.1 and 70.6.

Country: Republic of Korea , Year: 1990

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54 and 69. Uncertainty (95%) bounds are between 57.6 and 71.5.

Country: Republic of Korea , Year: 1991

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.4 and 69.7. Uncertainty (95%) bounds are between 58.9 and 72.2.

Country: Republic of Korea , Year: 1992

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.1 and 70.4. Uncertainty (95%) bounds are between 58.9 and 72.9.

Country: Republic of Korea , Year: 1993

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.6 and 70.9. Uncertainty (95%) bounds are between 58.8 and 73.4.

Country: Republic of Korea , Year: 1994

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.4 and 71.4. Uncertainty (95%) bounds are between 58.7 and 73.9.

Country: Republic of Korea , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.4 and 72. Uncertainty (95%) bounds are between 59 and 74.5.

Country: Republic of Korea , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.7 and 72.6. Uncertainty (95%) bounds are between 59.3 and 75.1.

Country: Republic of Korea , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.7 and 73.1. Uncertainty (95%) bounds are between 59.6 and 75.6.

Country: Republic of Korea , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.7 and 73.5. Uncertainty (95%) bounds are between 59.8 and 76.1.

Country: Republic of Korea , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.6 and 74. Uncertainty (95%) bounds are between 59.9 and 76.5.

Country: Republic of Korea , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.8 and 74.4. Uncertainty (95%) bounds are between 60.2 and 76.9.

Country: Republic of Korea , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.2 and 74.9. Uncertainty (95%) bounds are between 60.7 and 77.5.

Country: Republic of Korea , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.4 and 75.6. Uncertainty (95%) bounds are between 61.3 and 78.

Country: Republic of Korea , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.7 and 75.9. Uncertainty (95%) bounds are between 61.6 and 78.2.

Country: Republic of Korea , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.5 and 75.8. Uncertainty (95%) bounds are between 61.5 and 78.

Country: Republic of Korea , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.1 and 75.5. Uncertainty (95%) bounds are between 61.3 and 77.8.

Country: Republic of Korea , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.4 and 75.2. Uncertainty (95%) bounds are between 60.9 and 77.5.

Country: Republic of Korea , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.1 and 75.1. Uncertainty (95%) bounds are between 60.6 and 77.5.

Country: Republic of Korea , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54 and 74.9. Uncertainty (95%) bounds are between 60.5 and 77.3.

Country: Republic of Korea , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54 and 74.8. Uncertainty (95%) bounds are between 60.4 and 77.1.

Country: Republic of Korea , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.9 and 74.8. Uncertainty (95%) bounds are between 60.3 and 77.

Country: Republic of Korea , Year: 2011

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.6 and 74.7. Uncertainty (95%) bounds are between 60.3 and 77.

Country: Republic of Korea , Year: 2012

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54 and 74.9. Uncertainty (95%) bounds are between 60.5 and 77.1.

Country: Republic of Korea , Year: 2013

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.2 and 75.3. Uncertainty (95%) bounds are between 60.8 and 77.4.

Country: Republic of Korea , Year: 2014

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.5 and 75.8. Uncertainty (95%) bounds are between 61.3 and 77.9.

Country: Republic of Korea , Year: 2015

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55 and 76.3. Uncertainty (95%) bounds are between 61.8 and 78.4.

Country: Republic of Korea , Year: 2016

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.4 and 76.9. Uncertainty (95%) bounds are between 62.4 and 79.

Country: Republic of Korea , Year: 2017

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56 and 77.5. Uncertainty (95%) bounds are between 63 and 79.6.

Country: Republic of Korea , Year: 2018

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.3 and 78.1. Uncertainty (95%) bounds are between 63.5 and 80.2.

Country: Republic of Korea , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 56.7 and 78.7. Uncertainty (95%) bounds are between 63.7 and 81.

Country: Republic of Korea , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 56.7 and 79.2. Uncertainty (95%) bounds are between 63.8 and 81.7.

Country: Republic of Korea , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 56.5 and 79.7. Uncertainty (95%) bounds are between 63.8 and 82.3.

Country: Republic of Korea , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 56.6 and 80.2. Uncertainty (95%) bounds are between 63.8 and 82.9.

Country: Republic of Moldova , Year: 1970

Estimation Method: Projection. Uncertainty (80%) bounds are between 5 and 41.3. Uncertainty (95%) bounds are between 9.2 and 51.6.

Country: Republic of Moldova , Year: 1971

Estimation Method: Projection. Uncertainty (80%) bounds are between 5.3 and 41.7. Uncertainty (95%) bounds are between 9.8 and 52.

Country: Republic of Moldova , Year: 1972

Estimation Method: Projection. Uncertainty (80%) bounds are between 5.9 and 42.4. Uncertainty (95%) bounds are between 10.4 and 52.3.

Country: Republic of Moldova , Year: 1973

Estimation Method: Projection. Uncertainty (80%) bounds are between 6.4 and 42.8. Uncertainty (95%) bounds are between 11.1 and 52.8.

Country: Republic of Moldova , Year: 1974

Estimation Method: Projection. Uncertainty (80%) bounds are between 7 and 43.3. Uncertainty (95%) bounds are between 11.7 and 53.2.

Country: Republic of Moldova , Year: 1975

Estimation Method: Projection. Uncertainty (80%) bounds are between 7.4 and 43.8. Uncertainty (95%) bounds are between 12.4 and 53.4.

Country: Republic of Moldova , Year: 1976

Estimation Method: Projection. Uncertainty (80%) bounds are between 8 and 44.4. Uncertainty (95%) bounds are between 13.2 and 53.7.

Country: Republic of Moldova , Year: 1977

Estimation Method: Projection. Uncertainty (80%) bounds are between 8.7 and 45. Uncertainty (95%) bounds are between 14.1 and 53.9.

Country: Republic of Moldova , Year: 1978

Estimation Method: Projection. Uncertainty (80%) bounds are between 9.2 and 45.4. Uncertainty (95%) bounds are between 14.9 and 54.1.

Country: Republic of Moldova , Year: 1979

Estimation Method: Projection. Uncertainty (80%) bounds are between 10.1 and 45.9. Uncertainty (95%) bounds are between 15.7 and 54.5.

Country: Republic of Moldova , Year: 1980

Estimation Method: Projection. Uncertainty (80%) bounds are between 10.9 and 46.4. Uncertainty (95%) bounds are between 16.5 and 54.4.

Country: Republic of Moldova , Year: 1981

Estimation Method: Projection. Uncertainty (80%) bounds are between 11.8 and 46.9. Uncertainty (95%) bounds are between 17.4 and 54.7.

Country: Republic of Moldova , Year: 1982

Estimation Method: Projection. Uncertainty (80%) bounds are between 12.7 and 47.4. Uncertainty (95%) bounds are between 18.4 and 54.8.

Country: Republic of Moldova , Year: 1983

Estimation Method: Projection. Uncertainty (80%) bounds are between 13.7 and 47.8. Uncertainty (95%) bounds are between 19.5 and 54.9.

Country: Republic of Moldova , Year: 1984

Estimation Method: Projection. Uncertainty (80%) bounds are between 14.9 and 48.3. Uncertainty (95%) bounds are between 20.6 and 55.4.

Country: Republic of Moldova , Year: 1985

Estimation Method: Projection. Uncertainty (80%) bounds are between 15.7 and 48.6. Uncertainty (95%) bounds are between 21.7 and 55.5.

Country: Republic of Moldova , Year: 1986

Estimation Method: Projection. Uncertainty (80%) bounds are between 16.9 and 49. Uncertainty (95%) bounds are between 22.8 and 55.5.

Country: Republic of Moldova , Year: 1987

Estimation Method: Projection. Uncertainty (80%) bounds are between 18.1 and 49.2. Uncertainty (95%) bounds are between 24.1 and 55.5.

Country: Republic of Moldova , Year: 1988

Estimation Method: Projection. Uncertainty (80%) bounds are between 19.4 and 49.6. Uncertainty (95%) bounds are between 25.1 and 55.5.

Country: Republic of Moldova , Year: 1989

Estimation Method: Projection. Uncertainty (80%) bounds are between 20.8 and 49.9. Uncertainty (95%) bounds are between 26.4 and 55.6.

Country: Republic of Moldova , Year: 1990

Estimation Method: Projection. Uncertainty (80%) bounds are between 22.2 and 50.2. Uncertainty (95%) bounds are between 27.7 and 55.6.

Country: Republic of Moldova , Year: 1991

Estimation Method: Projection. Uncertainty (80%) bounds are between 23.6 and 50.5. Uncertainty (95%) bounds are between 29 and 55.7.

Country: Republic of Moldova , Year: 1992

Estimation Method: Projection. Uncertainty (80%) bounds are between 25 and 50.9. Uncertainty (95%) bounds are between 30.4 and 55.6.

Country: Republic of Moldova , Year: 1993

Estimation Method: Projection. Uncertainty (80%) bounds are between 26.6 and 51. Uncertainty (95%) bounds are between 31.7 and 55.5.

Country: Republic of Moldova , Year: 1994

Estimation Method: Projection. Uncertainty (80%) bounds are between 28.3 and 51.1. Uncertainty (95%) bounds are between 33 and 55.5.

Country: Republic of Moldova , Year: 1995

Estimation Method: Projection. Uncertainty (80%) bounds are between 30.1 and 51.2. Uncertainty (95%) bounds are between 34.5 and 55.2.

Country: Republic of Moldova , Year: 1996

Estimation Method: Projection. Uncertainty (80%) bounds are between 32 and 51.1. Uncertainty (95%) bounds are between 36 and 54.8.

Country: Republic of Moldova , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 33.8 and 50.9. Uncertainty (95%) bounds are between 37.4 and 54.4.

Country: Republic of Moldova , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.1 and 50.7. Uncertainty (95%) bounds are between 37.6 and 53.8.

Country: Republic of Moldova , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.4 and 50.3. Uncertainty (95%) bounds are between 37.9 and 53.3.

Country: Republic of Moldova , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 35.3 and 49.8. Uncertainty (95%) bounds are between 38.3 and 52.7.

Country: Republic of Moldova , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 35.4 and 49.7. Uncertainty (95%) bounds are between 38.5 and 52.7.

Country: Republic of Moldova , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 35.9 and 49.6. Uncertainty (95%) bounds are between 38.9 and 52.4.

Country: Republic of Moldova , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 36.7 and 49.3. Uncertainty (95%) bounds are between 39.5 and 51.7.

Country: Republic of Moldova , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.1 and 48.7. Uncertainty (95%) bounds are between 40.5 and 50.7.

Country: Republic of Moldova , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 39.8 and 47.8. Uncertainty (95%) bounds are between 41.6 and 49.1.

Country: Republic of Moldova , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.4 and 48.9. Uncertainty (95%) bounds are between 40.7 and 50.7.

Country: Republic of Moldova , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.3 and 49.6. Uncertainty (95%) bounds are between 40 and 51.9.

Country: Republic of Moldova , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 36.3 and 50.1. Uncertainty (95%) bounds are between 39.3 and 52.6.

Country: Republic of Moldova , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 35.9 and 50.4. Uncertainty (95%) bounds are between 39 and 53.1.

Country: Republic of Moldova , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 35.5 and 50.4. Uncertainty (95%) bounds are between 38.7 and 53.3.

Country: Republic of Moldova , Year: 2011

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 35.4 and 50.3. Uncertainty (95%) bounds are between 38.6 and 53.3.

Country: Republic of Moldova , Year: 2012

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 35.5 and 50.2. Uncertainty (95%) bounds are between 38.6 and 53.3.

Country: Republic of Moldova , Year: 2013

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 35 and 50.6. Uncertainty (95%) bounds are between 38.3 and 53.8.

Country: Republic of Moldova , Year: 2014

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.7 and 50.9. Uncertainty (95%) bounds are between 38.1 and 54.2.

Country: Republic of Moldova , Year: 2015

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.5 and 51.2. Uncertainty (95%) bounds are between 38 and 54.6.

Country: Republic of Moldova , Year: 2016

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.4 and 51.3. Uncertainty (95%) bounds are between 38 and 54.8.

Country: Republic of Moldova , Year: 2017

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.4 and 51.3. Uncertainty (95%) bounds are between 38 and 54.7.

Country: Republic of Moldova , Year: 2018

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.7 and 51.3. Uncertainty (95%) bounds are between 38.2 and 54.7.

Country: Republic of Moldova , Year: 2019

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 35.3 and 51.3. Uncertainty (95%) bounds are between 38.5 and 54.7.

Country: Republic of Moldova , Year: 2020

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 35.6 and 51.4. Uncertainty (95%) bounds are between 38.8 and 54.9.

Country: Republic of Moldova , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 34.9 and 52.3. Uncertainty (95%) bounds are between 38.5 and 56.1.

Country: Republic of Moldova , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 34.3 and 53.3. Uncertainty (95%) bounds are between 38.3 and 57.3.

Country: Romania , Year: 1970

Estimation Method: Projection. Uncertainty (80%) bounds are between 1 and 8.1. Uncertainty (95%) bounds are between 1.6 and 11.8.

Country: Romania , Year: 1971

Estimation Method: Projection. Uncertainty (80%) bounds are between 1.1 and 8.3. Uncertainty (95%) bounds are between 1.8 and 11.6.

Country: Romania , Year: 1972

Estimation Method: Projection. Uncertainty (80%) bounds are between 1.3 and 8.4. Uncertainty (95%) bounds are between 2 and 11.6.

Country: Romania , Year: 1973

Estimation Method: Projection. Uncertainty (80%) bounds are between 1.5 and 8.4. Uncertainty (95%) bounds are between 2.2 and 11.7.

Country: Romania , Year: 1974

Estimation Method: Projection. Uncertainty (80%) bounds are between 1.7 and 8.6. Uncertainty (95%) bounds are between 2.5 and 11.5.

Country: Romania , Year: 1975

Estimation Method: Projection. Uncertainty (80%) bounds are between 2 and 8.7. Uncertainty (95%) bounds are between 2.8 and 11.4.

Country: Romania , Year: 1976

Estimation Method: Projection. Uncertainty (80%) bounds are between 2.3 and 8.8. Uncertainty (95%) bounds are between 3.2 and 11.3.

Country: Romania , Year: 1977

Estimation Method: Projection. Uncertainty (80%) bounds are between 2.7 and 8.9. Uncertainty (95%) bounds are between 3.5 and 11.1.

Country: Romania , Year: 1978

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 3.2 and 9. Uncertainty (95%) bounds are between 4 and 11.

Country: Romania , Year: 1979

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 3.3 and 10. Uncertainty (95%) bounds are between 4.3 and 12.2.

Country: Romania , Year: 1980

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 3.6 and 11. Uncertainty (95%) bounds are between 4.6 and 13.5.

Country: Romania , Year: 1981

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 3.8 and 12. Uncertainty (95%) bounds are between 5 and 14.9.

Country: Romania , Year: 1982

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 4.1 and 13.1. Uncertainty (95%) bounds are between 5.4 and 16.2.

Country: Romania , Year: 1983

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 4.5 and 14.2. Uncertainty (95%) bounds are between 5.8 and 17.6.

Country: Romania , Year: 1984

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 4.9 and 15.3. Uncertainty (95%) bounds are between 6.4 and 18.9.

Country: Romania , Year: 1985

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 5.3 and 16.4. Uncertainty (95%) bounds are between 6.9 and 20.4.

Country: Romania , Year: 1986

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 5.9 and 17.6. Uncertainty (95%) bounds are between 7.5 and 21.6.

Country: Romania , Year: 1987

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 6.4 and 18.7. Uncertainty (95%) bounds are between 8.2 and 22.9.

Country: Romania , Year: 1988

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 7.1 and 19.8. Uncertainty (95%) bounds are between 9 and 24.1.

Country: Romania , Year: 1989

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 7.8 and 21. Uncertainty (95%) bounds are between 9.8 and 25.1.

Country: Romania , Year: 1990

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 8.7 and 22. Uncertainty (95%) bounds are between 10.7 and 26.

Country: Romania , Year: 1991

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 9.6 and 22.8. Uncertainty (95%) bounds are between 11.6 and 26.6.

Country: Romania , Year: 1992

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 10.5 and 23.7. Uncertainty (95%) bounds are between 12.6 and 27.3.

Country: Romania , Year: 1993

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 11.7 and 24.4. Uncertainty (95%) bounds are between 13.8 and 28.

Country: Romania , Year: 1994

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 12.7 and 26.9. Uncertainty (95%) bounds are between 15.1 and 30.7.

Country: Romania , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 14 and 29.5. Uncertainty (95%) bounds are between 16.6 and 33.6.

Country: Romania , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 15.6 and 32. Uncertainty (95%) bounds are between 18.4 and 36.1.

Country: Romania , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 17.3 and 34.4. Uncertainty (95%) bounds are between 20.4 and 38.8.

Country: Romania , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 19.6 and 36.8. Uncertainty (95%) bounds are between 22.8 and 40.9.

Country: Romania , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 22.1 and 39. Uncertainty (95%) bounds are between 25.3 and 43.

Country: Romania , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 23.1 and 41.1. Uncertainty (95%) bounds are between 26.6 and 45.1.

Country: Romania , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 24.6 and 43. Uncertainty (95%) bounds are between 28.2 and 46.9.

Country: Romania , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 26.3 and 44.7. Uncertainty (95%) bounds are between 30.1 and 48.6.

Country: Romania , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 28.4 and 46.3. Uncertainty (95%) bounds are between 32.1 and 50.1.

Country: Romania , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 30.5 and 47.8. Uncertainty (95%) bounds are between 34.2 and 51.3.

Country: Romania , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 31.8 and 49.6. Uncertainty (95%) bounds are between 36 and 53.1.

Country: Romania , Year: 2006

Estimation Method: Projection. Uncertainty (80%) bounds are between 31.8 and 51.7. Uncertainty (95%) bounds are between 36.3 and 55.5.

Country: Romania , Year: 2007

Estimation Method: Projection. Uncertainty (80%) bounds are between 31.9 and 53.6. Uncertainty (95%) bounds are between 36.6 and 57.8.

Country: Romania , Year: 2008

Estimation Method: Projection. Uncertainty (80%) bounds are between 31.8 and 55.4. Uncertainty (95%) bounds are between 36.9 and 59.9.

Country: Romania , Year: 2009

Estimation Method: Projection. Uncertainty (80%) bounds are between 31.6 and 57. Uncertainty (95%) bounds are between 37.2 and 61.9.

Country: Romania , Year: 2010

Estimation Method: Projection. Uncertainty (80%) bounds are between 31.7 and 58.7. Uncertainty (95%) bounds are between 37.6 and 63.7.

Country: Romania , Year: 2011

Estimation Method: Projection. Uncertainty (80%) bounds are between 31.6 and 60.1. Uncertainty (95%) bounds are between 37.7 and 65.4.

Country: Romania , Year: 2012

Estimation Method: Projection. Uncertainty (80%) bounds are between 31.8 and 61.6. Uncertainty (95%) bounds are between 38 and 67.2.

Country: Romania , Year: 2013

Estimation Method: Projection. Uncertainty (80%) bounds are between 31.4 and 62.9. Uncertainty (95%) bounds are between 38.4 and 68.6.

Country: Romania , Year: 2014

Estimation Method: Projection. Uncertainty (80%) bounds are between 31.8 and 64.2. Uncertainty (95%) bounds are between 38.9 and 69.9.

Country: Romania , Year: 2015

Estimation Method: Projection. Uncertainty (80%) bounds are between 32.2 and 65.3. Uncertainty (95%) bounds are between 39.2 and 71.2.

Country: Romania , Year: 2016

Estimation Method: Projection. Uncertainty (80%) bounds are between 32.1 and 66.4. Uncertainty (95%) bounds are between 39.6 and 72.2.

Country: Romania , Year: 2017

Estimation Method: Projection. Uncertainty (80%) bounds are between 32 and 67.4. Uncertainty (95%) bounds are between 39.9 and 73.4.

Country: Romania , Year: 2018

Estimation Method: Projection. Uncertainty (80%) bounds are between 31.9 and 68.3. Uncertainty (95%) bounds are between 40.2 and 74.2.

Country: Romania , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 32.3 and 69.3. Uncertainty (95%) bounds are between 40.6 and 75.

Country: Romania , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 32.7 and 70.2. Uncertainty (95%) bounds are between 40.9 and 76.1.

Country: Romania , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 32.6 and 71.1. Uncertainty (95%) bounds are between 41.1 and 77.1.

Country: Romania , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 32.9 and 71.8. Uncertainty (95%) bounds are between 41.5 and 77.8.

Country: Russian Federation , Year: 1970

Estimation Method: Projection. Uncertainty (80%) bounds are between 5.9 and 40.8. Uncertainty (95%) bounds are between 10.3 and 50.9.

Country: Russian Federation , Year: 1971

Estimation Method: Projection. Uncertainty (80%) bounds are between 6.5 and 41.3. Uncertainty (95%) bounds are between 11 and 51.

Country: Russian Federation , Year: 1972

Estimation Method: Projection. Uncertainty (80%) bounds are between 7.1 and 41.9. Uncertainty (95%) bounds are between 11.8 and 51.4.

Country: Russian Federation , Year: 1973

Estimation Method: Projection. Uncertainty (80%) bounds are between 7.8 and 42.3. Uncertainty (95%) bounds are between 12.7 and 51.7.

Country: Russian Federation , Year: 1974

Estimation Method: Projection. Uncertainty (80%) bounds are between 8.5 and 43. Uncertainty (95%) bounds are between 13.6 and 51.9.

Country: Russian Federation , Year: 1975

Estimation Method: Projection. Uncertainty (80%) bounds are between 9.5 and 43.6. Uncertainty (95%) bounds are between 14.4 and 52.3.

Country: Russian Federation , Year: 1976

Estimation Method: Projection. Uncertainty (80%) bounds are between 10.2 and 44.1. Uncertainty (95%) bounds are between 15.4 and 52.4.

Country: Russian Federation , Year: 1977

Estimation Method: Projection. Uncertainty (80%) bounds are between 11.1 and 44.7. Uncertainty (95%) bounds are between 16.4 and 52.5.

Country: Russian Federation , Year: 1978

Estimation Method: Projection. Uncertainty (80%) bounds are between 12 and 45.1. Uncertainty (95%) bounds are between 17.5 and 52.9.

Country: Russian Federation , Year: 1979

Estimation Method: Projection. Uncertainty (80%) bounds are between 13.2 and 45.6. Uncertainty (95%) bounds are between 18.7 and 53.1.

Country: Russian Federation , Year: 1980

Estimation Method: Projection. Uncertainty (80%) bounds are between 14.4 and 46.1. Uncertainty (95%) bounds are between 19.8 and 53.4.

Country: Russian Federation , Year: 1981

Estimation Method: Projection. Uncertainty (80%) bounds are between 15.5 and 46.6. Uncertainty (95%) bounds are between 21.1 and 53.7.

Country: Russian Federation , Year: 1982

Estimation Method: Projection. Uncertainty (80%) bounds are between 16.9 and 46.9. Uncertainty (95%) bounds are between 22.4 and 53.6.

Country: Russian Federation , Year: 1983

Estimation Method: Projection. Uncertainty (80%) bounds are between 18.3 and 47.3. Uncertainty (95%) bounds are between 23.7 and 53.7.

Country: Russian Federation , Year: 1984

Estimation Method: Projection. Uncertainty (80%) bounds are between 19.8 and 47.6. Uncertainty (95%) bounds are between 25.2 and 53.7.

Country: Russian Federation , Year: 1985

Estimation Method: Projection. Uncertainty (80%) bounds are between 21.4 and 47.9. Uncertainty (95%) bounds are between 26.7 and 53.7.

Country: Russian Federation , Year: 1986

Estimation Method: Projection. Uncertainty (80%) bounds are between 23 and 48.2. Uncertainty (95%) bounds are between 28.1 and 53.3.

Country: Russian Federation , Year: 1987

Estimation Method: Projection. Uncertainty (80%) bounds are between 24.9 and 48.3. Uncertainty (95%) bounds are between 29.7 and 53.1.

Country: Russian Federation , Year: 1988

Estimation Method: Projection. Uncertainty (80%) bounds are between 26.7 and 48.4. Uncertainty (95%) bounds are between 31.3 and 52.6.

Country: Russian Federation , Year: 1989

Estimation Method: Projection. Uncertainty (80%) bounds are between 28.7 and 48.5. Uncertainty (95%) bounds are between 32.9 and 52.3.

Country: Russian Federation , Year: 1990

Estimation Method: Projection. Uncertainty (80%) bounds are between 30.5 and 48.2. Uncertainty (95%) bounds are between 34.6 and 51.7.

Country: Russian Federation , Year: 1991

Estimation Method: Projection. Uncertainty (80%) bounds are between 32.6 and 48. Uncertainty (95%) bounds are between 36.2 and 50.8.

Country: Russian Federation , Year: 1992

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.7 and 47.5. Uncertainty (95%) bounds are between 37.8 and 49.9.

Country: Russian Federation , Year: 1993

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 36.2 and 48.1. Uncertainty (95%) bounds are between 39.3 and 50.1.

Country: Russian Federation , Year: 1994

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.1 and 48.8. Uncertainty (95%) bounds are between 41 and 50.5.

Country: Russian Federation , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.4 and 49.1. Uncertainty (95%) bounds are between 41.3 and 50.9.

Country: Russian Federation , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.6 and 49.8. Uncertainty (95%) bounds are between 41.6 and 51.6.

Country: Russian Federation , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.2 and 51.1. Uncertainty (95%) bounds are between 41.5 and 53.3.

Country: Russian Federation , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38 and 52.3. Uncertainty (95%) bounds are between 41.5 and 54.8.

Country: Russian Federation , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.3 and 53.2. Uncertainty (95%) bounds are between 41.9 and 56.

Country: Russian Federation , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.6 and 54. Uncertainty (95%) bounds are between 42.4 and 57.

Country: Russian Federation , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 39.3 and 54.7. Uncertainty (95%) bounds are between 43 and 57.5.

Country: Russian Federation , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 40.4 and 55.2. Uncertainty (95%) bounds are between 43.9 and 57.8.

Country: Russian Federation , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 41.4 and 55.4. Uncertainty (95%) bounds are between 44.8 and 57.9.

Country: Russian Federation , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42.8 and 55.3. Uncertainty (95%) bounds are between 46 and 57.5.

Country: Russian Federation , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43 and 55.7. Uncertainty (95%) bounds are between 46.2 and 58.

Country: Russian Federation , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43.5 and 55.9. Uncertainty (95%) bounds are between 46.6 and 58.

Country: Russian Federation , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.2 and 55.8. Uncertainty (95%) bounds are between 47.3 and 57.9.

Country: Russian Federation , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44.4 and 56.3. Uncertainty (95%) bounds are between 47.5 and 58.4.

Country: Russian Federation , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 45 and 56.6. Uncertainty (95%) bounds are between 48 and 58.6.

Country: Russian Federation , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46 and 56.7. Uncertainty (95%) bounds are between 48.8 and 58.8.

Country: Russian Federation , Year: 2011

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46 and 57.6. Uncertainty (95%) bounds are between 48.9 and 59.7.

Country: Russian Federation , Year: 2012

Estimation Method: Projection. Uncertainty (80%) bounds are between 45.1 and 58.9. Uncertainty (95%) bounds are between 48.2 and 61.5.

Country: Russian Federation , Year: 2013

Estimation Method: Projection. Uncertainty (80%) bounds are between 44.2 and 60.2. Uncertainty (95%) bounds are between 47.8 and 63.2.

Country: Russian Federation , Year: 2014

Estimation Method: Projection. Uncertainty (80%) bounds are between 43.4 and 61.3. Uncertainty (95%) bounds are between 47.4 and 64.6.

Country: Russian Federation , Year: 2015

Estimation Method: Projection. Uncertainty (80%) bounds are between 42.3 and 62.3. Uncertainty (95%) bounds are between 47 and 66.1.

Country: Russian Federation , Year: 2016

Estimation Method: Projection. Uncertainty (80%) bounds are between 41.7 and 63.4. Uncertainty (95%) bounds are between 46.7 and 67.3.

Country: Russian Federation , Year: 2017

Estimation Method: Projection. Uncertainty (80%) bounds are between 40.9 and 64.3. Uncertainty (95%) bounds are between 46.3 and 68.6.

Country: Russian Federation , Year: 2018

Estimation Method: Projection. Uncertainty (80%) bounds are between 40.2 and 65.3. Uncertainty (95%) bounds are between 46 and 69.7.

Country: Russian Federation , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 39.9 and 66. Uncertainty (95%) bounds are between 45.8 and 70.7.

Country: Russian Federation , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 39.3 and 66.8. Uncertainty (95%) bounds are between 45.5 and 71.8.

Country: Russian Federation , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 38.9 and 67.5. Uncertainty (95%) bounds are between 45.4 and 72.7.

Country: Russian Federation , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 38.4 and 68.3. Uncertainty (95%) bounds are between 45.1 and 73.4.

Country: Serbia , Year: 1970

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 2.2 and 6.7. Uncertainty (95%) bounds are between 2.8 and 8.5.

Country: Serbia , Year: 1971

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 2.3 and 7.4. Uncertainty (95%) bounds are between 3 and 9.4.

Country: Serbia , Year: 1972

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 2.4 and 8.1. Uncertainty (95%) bounds are between 3.1 and 10.2.

Country: Serbia , Year: 1973

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 2.5 and 8.9. Uncertainty (95%) bounds are between 3.3 and 11.2.

Country: Serbia , Year: 1974

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 2.6 and 9.7. Uncertainty (95%) bounds are between 3.5 and 12.3.

Country: Serbia , Year: 1975

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 2.7 and 10.5. Uncertainty (95%) bounds are between 3.7 and 13.4.

Country: Serbia , Year: 1976

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 2.9 and 11.3. Uncertainty (95%) bounds are between 3.9 and 14.6.

Country: Serbia , Year: 1977

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 3.1 and 12.2. Uncertainty (95%) bounds are between 4.2 and 15.9.

Country: Serbia , Year: 1978

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 3.3 and 13.2. Uncertainty (95%) bounds are between 4.5 and 16.9.

Country: Serbia , Year: 1979

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 3.4 and 14.1. Uncertainty (95%) bounds are between 4.8 and 18.1.

Country: Serbia , Year: 1980

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 3.7 and 15. Uncertainty (95%) bounds are between 5.1 and 19.4.

Country: Serbia , Year: 1981

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 4 and 16.1. Uncertainty (95%) bounds are between 5.4 and 20.5.

Country: Serbia , Year: 1982

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 4.2 and 17.2. Uncertainty (95%) bounds are between 5.9 and 21.8.

Country: Serbia , Year: 1983

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 4.6 and 18.3. Uncertainty (95%) bounds are between 6.2 and 23.2.

Country: Serbia , Year: 1984

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 5 and 19.3. Uncertainty (95%) bounds are between 6.8 and 24.4.

Country: Serbia , Year: 1985

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 5.3 and 20.3. Uncertainty (95%) bounds are between 7.2 and 25.7.

Country: Serbia , Year: 1986

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 5.8 and 21.4. Uncertainty (95%) bounds are between 7.8 and 26.9.

Country: Serbia , Year: 1987

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 6.1 and 22.5. Uncertainty (95%) bounds are between 8.4 and 28.2.

Country: Serbia , Year: 1988

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 6.7 and 23.5. Uncertainty (95%) bounds are between 9 and 29.1.

Country: Serbia , Year: 1989

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 7.2 and 24.5. Uncertainty (95%) bounds are between 9.7 and 30.

Country: Serbia , Year: 1990

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 7.8 and 25.6. Uncertainty (95%) bounds are between 10.4 and 31.

Country: Serbia , Year: 1991

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 8.5 and 26.5. Uncertainty (95%) bounds are between 11 and 31.7.

Country: Serbia , Year: 1992

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 9.1 and 27.2. Uncertainty (95%) bounds are between 11.7 and 32.3.

Country: Serbia , Year: 1993

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 9.7 and 27.9. Uncertainty (95%) bounds are between 12.5 and 33.

Country: Serbia , Year: 1994

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 10.4 and 28.5. Uncertainty (95%) bounds are between 13.3 and 33.7.

Country: Serbia , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 11.3 and 29. Uncertainty (95%) bounds are between 14.2 and 34.2.

Country: Serbia , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 12.2 and 29.7. Uncertainty (95%) bounds are between 15.1 and 34.6.

Country: Serbia , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 13.4 and 30.2. Uncertainty (95%) bounds are between 16.2 and 34.6.

Country: Serbia , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 14.5 and 30.5. Uncertainty (95%) bounds are between 17.4 and 34.7.

Country: Serbia , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 15.9 and 30.7. Uncertainty (95%) bounds are between 18.6 and 34.4.

Country: Serbia , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 17.3 and 30.7. Uncertainty (95%) bounds are between 19.8 and 34.

Country: Serbia , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 16.6 and 30.2. Uncertainty (95%) bounds are between 19.1 and 33.6.

Country: Serbia , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 16 and 29.5. Uncertainty (95%) bounds are between 18.5 and 32.8.

Country: Serbia , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 15.5 and 28.6. Uncertainty (95%) bounds are between 17.9 and 31.8.

Country: Serbia , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 15.3 and 27.7. Uncertainty (95%) bounds are between 17.5 and 30.8.

Country: Serbia , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 15.2 and 26.6. Uncertainty (95%) bounds are between 17.3 and 29.6.

Country: Serbia , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 15.2 and 26.8. Uncertainty (95%) bounds are between 17.3 and 29.8.

Country: Serbia , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 15.3 and 27.2. Uncertainty (95%) bounds are between 17.5 and 30.3.

Country: Serbia , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 15.7 and 27.7. Uncertainty (95%) bounds are between 17.8 and 30.6.

Country: Serbia , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 16.2 and 28. Uncertainty (95%) bounds are between 18.3 and 30.8.

Country: Serbia , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 17 and 28. Uncertainty (95%) bounds are between 19 and 30.7.

Country: Serbia , Year: 2011

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 16.3 and 28.1. Uncertainty (95%) bounds are between 18.5 and 31.

Country: Serbia , Year: 2012

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 16 and 28. Uncertainty (95%) bounds are between 18.3 and 30.9.

Country: Serbia , Year: 2013

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 15.9 and 27.8. Uncertainty (95%) bounds are between 18 and 30.6.

Country: Serbia , Year: 2014

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 16 and 27.5. Uncertainty (95%) bounds are between 18 and 30.3.

Country: Serbia , Year: 2015

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 15.8 and 28.4. Uncertainty (95%) bounds are between 18.1 and 31.4.

Country: Serbia , Year: 2016

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 15.8 and 29.2. Uncertainty (95%) bounds are between 18.3 and 32.4.

Country: Serbia , Year: 2017

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 16 and 29.8. Uncertainty (95%) bounds are between 18.6 and 33.2.

Country: Serbia , Year: 2018

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 16.5 and 30.5. Uncertainty (95%) bounds are between 19 and 34.

Country: Serbia , Year: 2019

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 17 and 31.1. Uncertainty (95%) bounds are between 19.5 and 34.7.

Country: Serbia , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 16.8 and 32.8. Uncertainty (95%) bounds are between 19.7 and 36.8.

Country: Serbia , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 16.7 and 34.4. Uncertainty (95%) bounds are between 19.8 and 38.7.

Country: Serbia , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 16.7 and 35.9. Uncertainty (95%) bounds are between 20.1 and 40.8.

Country: Slovakia , Year: 1970

Estimation Method: Projection. Uncertainty (80%) bounds are between 3.2 and 38.1. Uncertainty (95%) bounds are between 7.1 and 48.1.

Country: Slovakia , Year: 1971

Estimation Method: Projection. Uncertainty (80%) bounds are between 3.6 and 38.7. Uncertainty (95%) bounds are between 7.7 and 48.5.

Country: Slovakia , Year: 1972

Estimation Method: Projection. Uncertainty (80%) bounds are between 4.1 and 39.4. Uncertainty (95%) bounds are between 8.5 and 49.2.

Country: Slovakia , Year: 1973

Estimation Method: Projection. Uncertainty (80%) bounds are between 4.7 and 39.9. Uncertainty (95%) bounds are between 9.2 and 49.6.

Country: Slovakia , Year: 1974

Estimation Method: Projection. Uncertainty (80%) bounds are between 5.2 and 40.6. Uncertainty (95%) bounds are between 9.8 and 50.1.

Country: Slovakia , Year: 1975

Estimation Method: Projection. Uncertainty (80%) bounds are between 5.9 and 41.3. Uncertainty (95%) bounds are between 10.7 and 50.2.

Country: Slovakia , Year: 1976

Estimation Method: Projection. Uncertainty (80%) bounds are between 6.6 and 41.9. Uncertainty (95%) bounds are between 11.5 and 50.9.

Country: Slovakia , Year: 1977

Estimation Method: Projection. Uncertainty (80%) bounds are between 7.3 and 42.4. Uncertainty (95%) bounds are between 12.3 and 51.2.

Country: Slovakia , Year: 1978

Estimation Method: Projection. Uncertainty (80%) bounds are between 8.2 and 43. Uncertainty (95%) bounds are between 13.3 and 51.4.

Country: Slovakia , Year: 1979

Estimation Method: Projection. Uncertainty (80%) bounds are between 9.1 and 43.5. Uncertainty (95%) bounds are between 14.4 and 51.9.

Country: Slovakia , Year: 1980

Estimation Method: Projection. Uncertainty (80%) bounds are between 10.1 and 44.2. Uncertainty (95%) bounds are between 15.5 and 52.2.

Country: Slovakia , Year: 1981

Estimation Method: Projection. Uncertainty (80%) bounds are between 11 and 44.8. Uncertainty (95%) bounds are between 16.7 and 52.4.

Country: Slovakia , Year: 1982

Estimation Method: Projection. Uncertainty (80%) bounds are between 12.3 and 45.4. Uncertainty (95%) bounds are between 17.8 and 52.6.

Country: Slovakia , Year: 1983

Estimation Method: Projection. Uncertainty (80%) bounds are between 13.7 and 46. Uncertainty (95%) bounds are between 19.1 and 52.8.

Country: Slovakia , Year: 1984

Estimation Method: Projection. Uncertainty (80%) bounds are between 14.8 and 46.4. Uncertainty (95%) bounds are between 20.4 and 53.

Country: Slovakia , Year: 1985

Estimation Method: Projection. Uncertainty (80%) bounds are between 16.3 and 46.8. Uncertainty (95%) bounds are between 21.8 and 53.1.

Country: Slovakia , Year: 1986

Estimation Method: Projection. Uncertainty (80%) bounds are between 17.9 and 47.4. Uncertainty (95%) bounds are between 23.3 and 53.5.

Country: Slovakia , Year: 1987

Estimation Method: Projection. Uncertainty (80%) bounds are between 19.4 and 47.7. Uncertainty (95%) bounds are between 24.7 and 53.4.

Country: Slovakia , Year: 1988

Estimation Method: Projection. Uncertainty (80%) bounds are between 20.9 and 48.1. Uncertainty (95%) bounds are between 26.2 and 53.6.

Country: Slovakia , Year: 1989

Estimation Method: Projection. Uncertainty (80%) bounds are between 22.8 and 48.6. Uncertainty (95%) bounds are between 27.9 and 53.7.

Country: Slovakia , Year: 1990

Estimation Method: Projection. Uncertainty (80%) bounds are between 24.6 and 49.1. Uncertainty (95%) bounds are between 29.4 and 53.9.

Country: Slovakia , Year: 1991

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 26.6 and 49.7. Uncertainty (95%) bounds are between 31.1 and 54.3.

Country: Slovakia , Year: 1992

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 27.8 and 52. Uncertainty (95%) bounds are between 32.7 and 56.6.

Country: Slovakia , Year: 1993

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 29 and 54.3. Uncertainty (95%) bounds are between 34.3 and 58.9.

Country: Slovakia , Year: 1994

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 30.2 and 56.5. Uncertainty (95%) bounds are between 35.9 and 61.2.

Country: Slovakia , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 31.8 and 58.7. Uncertainty (95%) bounds are between 37.7 and 63.4.

Country: Slovakia , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 33.3 and 60.7. Uncertainty (95%) bounds are between 39.3 and 65.4.

Country: Slovakia , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.6 and 62.6. Uncertainty (95%) bounds are between 40.8 and 67.2.

Country: Slovakia , Year: 1998

Estimation Method: Projection. Uncertainty (80%) bounds are between 34.5 and 63.9. Uncertainty (95%) bounds are between 41.2 and 68.8.

Country: Slovakia , Year: 1999

Estimation Method: Projection. Uncertainty (80%) bounds are between 34.7 and 65.2. Uncertainty (95%) bounds are between 41.5 and 70.4.

Country: Slovakia , Year: 2000

Estimation Method: Projection. Uncertainty (80%) bounds are between 34.8 and 66.3. Uncertainty (95%) bounds are between 41.7 and 71.8.

Country: Slovakia , Year: 2001

Estimation Method: Projection. Uncertainty (80%) bounds are between 34.8 and 67.4. Uncertainty (95%) bounds are between 42 and 72.9.

Country: Slovakia , Year: 2002

Estimation Method: Projection. Uncertainty (80%) bounds are between 34.9 and 68.4. Uncertainty (95%) bounds are between 42.2 and 74.

Country: Slovakia , Year: 2003

Estimation Method: Projection. Uncertainty (80%) bounds are between 35 and 69.2. Uncertainty (95%) bounds are between 42.6 and 74.8.

Country: Slovakia , Year: 2004

Estimation Method: Projection. Uncertainty (80%) bounds are between 35.1 and 70.2. Uncertainty (95%) bounds are between 42.8 and 75.8.

Country: Slovakia , Year: 2005

Estimation Method: Projection. Uncertainty (80%) bounds are between 34.9 and 71. Uncertainty (95%) bounds are between 42.8 and 76.7.

Country: Slovakia , Year: 2006

Estimation Method: Projection. Uncertainty (80%) bounds are between 34.9 and 71.9. Uncertainty (95%) bounds are between 43.1 and 77.3.

Country: Slovakia , Year: 2007

Estimation Method: Projection. Uncertainty (80%) bounds are between 35 and 72.6. Uncertainty (95%) bounds are between 43.4 and 78.2.

Country: Slovakia , Year: 2008

Estimation Method: Projection. Uncertainty (80%) bounds are between 35.1 and 73.4. Uncertainty (95%) bounds are between 43.6 and 78.8.

Country: Slovakia , Year: 2009

Estimation Method: Projection. Uncertainty (80%) bounds are between 35.3 and 73.9. Uncertainty (95%) bounds are between 44 and 79.5.

Country: Slovakia , Year: 2010

Estimation Method: Projection. Uncertainty (80%) bounds are between 35.1 and 74.7. Uncertainty (95%) bounds are between 44.2 and 80.2.

Country: Slovakia , Year: 2011

Estimation Method: Projection. Uncertainty (80%) bounds are between 35.4 and 75.3. Uncertainty (95%) bounds are between 44.4 and 80.9.

Country: Slovakia , Year: 2012

Estimation Method: Projection. Uncertainty (80%) bounds are between 35.5 and 76. Uncertainty (95%) bounds are between 44.7 and 81.6.

Country: Slovakia , Year: 2013

Estimation Method: Projection. Uncertainty (80%) bounds are between 35.3 and 76.5. Uncertainty (95%) bounds are between 44.8 and 82.2.

Country: Slovakia , Year: 2014

Estimation Method: Projection. Uncertainty (80%) bounds are between 35.6 and 77.1. Uncertainty (95%) bounds are between 44.9 and 82.8.

Country: Slovakia , Year: 2015

Estimation Method: Projection. Uncertainty (80%) bounds are between 35.3 and 77.6. Uncertainty (95%) bounds are between 45.1 and 83.3.

Country: Slovakia , Year: 2016

Estimation Method: Projection. Uncertainty (80%) bounds are between 35.3 and 78.2. Uncertainty (95%) bounds are between 45.4 and 83.9.

Country: Slovakia , Year: 2017

Estimation Method: Projection. Uncertainty (80%) bounds are between 36 and 78.6. Uncertainty (95%) bounds are between 45.5 and 84.4.

Country: Slovakia , Year: 2018

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.3 and 79.1. Uncertainty (95%) bounds are between 45.7 and 84.8.

Country: Slovakia , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.4 and 79.5. Uncertainty (95%) bounds are between 46 and 85.2.

Country: Slovakia , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.3 and 80. Uncertainty (95%) bounds are between 46.2 and 85.6.

Country: Slovakia , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.2 and 80.4. Uncertainty (95%) bounds are between 46.4 and 86.1.

Country: Slovakia , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 36 and 80.8. Uncertainty (95%) bounds are between 46.5 and 86.5.

Country: Slovenia , Year: 1970

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 7.1 and 21.3. Uncertainty (95%) bounds are between 9.2 and 26.

Country: Slovenia , Year: 1971

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 7.4 and 23. Uncertainty (95%) bounds are between 9.7 and 28.

Country: Slovenia , Year: 1972

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 7.9 and 24.8. Uncertainty (95%) bounds are between 10.3 and 30.

Country: Slovenia , Year: 1973

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 8.3 and 26.6. Uncertainty (95%) bounds are between 11 and 31.8.

Country: Slovenia , Year: 1974

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 8.8 and 28.3. Uncertainty (95%) bounds are between 11.7 and 34.1.

Country: Slovenia , Year: 1975

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 9.3 and 30.1. Uncertainty (95%) bounds are between 12.5 and 36.3.

Country: Slovenia , Year: 1976

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 9.9 and 32. Uncertainty (95%) bounds are between 13.3 and 38.2.

Country: Slovenia , Year: 1977

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 10.5 and 33.9. Uncertainty (95%) bounds are between 14.1 and 40.1.

Country: Slovenia , Year: 1978

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 11.5 and 35.9. Uncertainty (95%) bounds are between 15.2 and 42.

Country: Slovenia , Year: 1979

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 12.2 and 37.6. Uncertainty (95%) bounds are between 16.2 and 43.9.

Country: Slovenia , Year: 1980

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 13.1 and 39.5. Uncertainty (95%) bounds are between 17.2 and 45.9.

Country: Slovenia , Year: 1981

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 14 and 41.4. Uncertainty (95%) bounds are between 18.5 and 47.7.

Country: Slovenia , Year: 1982

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 15 and 42.9. Uncertainty (95%) bounds are between 19.7 and 49.6.

Country: Slovenia , Year: 1983

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 16.1 and 44.6. Uncertainty (95%) bounds are between 21 and 51.3.

Country: Slovenia , Year: 1984

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 17.4 and 46.4. Uncertainty (95%) bounds are between 22.4 and 52.5.

Country: Slovenia , Year: 1985

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 18.6 and 48. Uncertainty (95%) bounds are between 23.9 and 54.1.

Country: Slovenia , Year: 1986

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 20 and 49.5. Uncertainty (95%) bounds are between 25.7 and 55.4.

Country: Slovenia , Year: 1987

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 21.8 and 51. Uncertainty (95%) bounds are between 27.4 and 56.7.

Country: Slovenia , Year: 1988

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 23.6 and 52.5. Uncertainty (95%) bounds are between 29.2 and 58.

Country: Slovenia , Year: 1989

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 25.6 and 53.9. Uncertainty (95%) bounds are between 31.2 and 59.3.

Country: Slovenia , Year: 1990

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 27.6 and 55.5. Uncertainty (95%) bounds are between 33.3 and 60.6.

Country: Slovenia , Year: 1991

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 30 and 57.2. Uncertainty (95%) bounds are between 35.4 and 62.1.

Country: Slovenia , Year: 1992

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 32.2 and 58.6. Uncertainty (95%) bounds are between 37.7 and 63.5.

Country: Slovenia , Year: 1993

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.5 and 60.1. Uncertainty (95%) bounds are between 40 and 64.9.

Country: Slovenia , Year: 1994

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.2 and 61.7. Uncertainty (95%) bounds are between 42.3 and 66.2.

Country: Slovenia , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 39.3 and 63.1. Uncertainty (95%) bounds are between 44.6 and 67.4.

Country: Slovenia , Year: 1996

Estimation Method: Projection. Uncertainty (80%) bounds are between 39 and 64.2. Uncertainty (95%) bounds are between 44.6 and 68.8.

Country: Slovenia , Year: 1997

Estimation Method: Projection. Uncertainty (80%) bounds are between 38.6 and 65.3. Uncertainty (95%) bounds are between 44.6 and 70.1.

Country: Slovenia , Year: 1998

Estimation Method: Projection. Uncertainty (80%) bounds are between 38.4 and 66.5. Uncertainty (95%) bounds are between 44.7 and 71.2.

Country: Slovenia , Year: 1999

Estimation Method: Projection. Uncertainty (80%) bounds are between 38.2 and 67.5. Uncertainty (95%) bounds are between 44.7 and 72.5.

Country: Slovenia , Year: 2000

Estimation Method: Projection. Uncertainty (80%) bounds are between 37.9 and 68.5. Uncertainty (95%) bounds are between 44.8 and 73.6.

Country: Slovenia , Year: 2001

Estimation Method: Projection. Uncertainty (80%) bounds are between 37.7 and 69.5. Uncertainty (95%) bounds are between 45 and 74.5.

Country: Slovenia , Year: 2002

Estimation Method: Projection. Uncertainty (80%) bounds are between 37.5 and 70.2. Uncertainty (95%) bounds are between 44.7 and 75.4.

Country: Slovenia , Year: 2003

Estimation Method: Projection. Uncertainty (80%) bounds are between 37.3 and 71.1. Uncertainty (95%) bounds are between 44.8 and 76.3.

Country: Slovenia , Year: 2004

Estimation Method: Projection. Uncertainty (80%) bounds are between 37.2 and 71.8. Uncertainty (95%) bounds are between 44.7 and 77.3.

Country: Slovenia , Year: 2005

Estimation Method: Projection. Uncertainty (80%) bounds are between 37 and 72.6. Uncertainty (95%) bounds are between 44.8 and 78.1.

Country: Slovenia , Year: 2006

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.9 and 73.3. Uncertainty (95%) bounds are between 44.8 and 78.9.

Country: Slovenia , Year: 2007

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.9 and 74. Uncertainty (95%) bounds are between 44.9 and 79.6.

Country: Slovenia , Year: 2008

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.8 and 74.7. Uncertainty (95%) bounds are between 45 and 80.2.

Country: Slovenia , Year: 2009

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.7 and 75.2. Uncertainty (95%) bounds are between 45.3 and 80.9.

Country: Slovenia , Year: 2010

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.4 and 75.8. Uncertainty (95%) bounds are between 45.3 and 81.5.

Country: Slovenia , Year: 2011

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.6 and 76.3. Uncertainty (95%) bounds are between 45.5 and 82.1.

Country: Slovenia , Year: 2012

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.6 and 76.8. Uncertainty (95%) bounds are between 45.6 and 82.6.

Country: Slovenia , Year: 2013

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.6 and 77.4. Uncertainty (95%) bounds are between 45.8 and 83.2.

Country: Slovenia , Year: 2014

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.8 and 77.9. Uncertainty (95%) bounds are between 45.9 and 83.7.

Country: Slovenia , Year: 2015

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.6 and 78.4. Uncertainty (95%) bounds are between 46 and 84.2.

Country: Slovenia , Year: 2016

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.7 and 78.9. Uncertainty (95%) bounds are between 46.2 and 84.7.

Country: Slovenia , Year: 2017

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.6 and 79.4. Uncertainty (95%) bounds are between 46.4 and 85.1.

Country: Slovenia , Year: 2018

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.9 and 79.8. Uncertainty (95%) bounds are between 46.6 and 85.6.

Country: Slovenia , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.7 and 80.3. Uncertainty (95%) bounds are between 46.7 and 85.9.

Country: Slovenia , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.9 and 80.7. Uncertainty (95%) bounds are between 46.6 and 86.4.

Country: Slovenia , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.8 and 81. Uncertainty (95%) bounds are between 46.9 and 86.8.

Country: Slovenia , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.6 and 81.5. Uncertainty (95%) bounds are between 47 and 87.2.

Country: Spain , Year: 1970

Estimation Method: Projection. Uncertainty (80%) bounds are between 4.5 and 20.1. Uncertainty (95%) bounds are between 6.4 and 25.6.

Country: Spain , Year: 1971

Estimation Method: Projection. Uncertainty (80%) bounds are between 5.2 and 20.9. Uncertainty (95%) bounds are between 7.3 and 26.3.

Country: Spain , Year: 1972

Estimation Method: Projection. Uncertainty (80%) bounds are between 6.1 and 21.6. Uncertainty (95%) bounds are between 8.3 and 26.5.

Country: Spain , Year: 1973

Estimation Method: Projection. Uncertainty (80%) bounds are between 7.2 and 22.2. Uncertainty (95%) bounds are between 9.4 and 26.8.

Country: Spain , Year: 1974

Estimation Method: Projection. Uncertainty (80%) bounds are between 8.4 and 22.9. Uncertainty (95%) bounds are between 10.6 and 27.2.

Country: Spain , Year: 1975

Estimation Method: Projection. Uncertainty (80%) bounds are between 9.8 and 23.7. Uncertainty (95%) bounds are between 12 and 27.5.

Country: Spain , Year: 1976

Estimation Method: Projection. Uncertainty (80%) bounds are between 11.4 and 24.3. Uncertainty (95%) bounds are between 13.7 and 27.7.

Country: Spain , Year: 1977

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 13.4 and 25. Uncertainty (95%) bounds are between 15.5 and 28.1.

Country: Spain , Year: 1978

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 14.6 and 27.5. Uncertainty (95%) bounds are between 17 and 30.6.

Country: Spain , Year: 1979

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 16 and 30. Uncertainty (95%) bounds are between 18.7 and 33.2.

Country: Spain , Year: 1980

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 17.9 and 32.5. Uncertainty (95%) bounds are between 20.8 and 35.8.

Country: Spain , Year: 1981

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 20 and 35.1. Uncertainty (95%) bounds are between 23 and 38.4.

Country: Spain , Year: 1982

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 22.5 and 37.6. Uncertainty (95%) bounds are between 25.5 and 40.6.

Country: Spain , Year: 1983

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 25.2 and 39.9. Uncertainty (95%) bounds are between 28.4 and 42.7.

Country: Spain , Year: 1984

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 28.4 and 42. Uncertainty (95%) bounds are between 31.4 and 44.5.

Country: Spain , Year: 1985

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 31.9 and 44. Uncertainty (95%) bounds are between 34.7 and 46.2.

Country: Spain , Year: 1986

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 33.5 and 47. Uncertainty (95%) bounds are between 36.5 and 49.4.

Country: Spain , Year: 1987

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 35.3 and 50. Uncertainty (95%) bounds are between 38.5 and 52.7.

Country: Spain , Year: 1988

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.1 and 52.7. Uncertainty (95%) bounds are between 40.6 and 55.6.

Country: Spain , Year: 1989

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 39.1 and 55.3. Uncertainty (95%) bounds are between 42.8 and 58.3.

Country: Spain , Year: 1990

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 41.5 and 57.6. Uncertainty (95%) bounds are between 45.2 and 60.5.

Country: Spain , Year: 1991

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 44 and 59.8. Uncertainty (95%) bounds are between 47.5 and 62.6.

Country: Spain , Year: 1992

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 46.3 and 61.6. Uncertainty (95%) bounds are between 49.9 and 64.5.

Country: Spain , Year: 1993

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49 and 63.3. Uncertainty (95%) bounds are between 52.2 and 65.9.

Country: Spain , Year: 1994

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.5 and 64.7. Uncertainty (95%) bounds are between 54.5 and 67.1.

Country: Spain , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.9 and 65.7. Uncertainty (95%) bounds are between 56.5 and 68.

Country: Spain , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.4 and 66.8. Uncertainty (95%) bounds are between 57.9 and 68.9.

Country: Spain , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.8 and 67.4. Uncertainty (95%) bounds are between 59.2 and 69.4.

Country: Spain , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.3 and 67.7. Uncertainty (95%) bounds are between 60.4 and 69.4.

Country: Spain , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.5 and 67.8. Uncertainty (95%) bounds are between 61.4 and 69.4.

Country: Spain , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.2 and 68.1. Uncertainty (95%) bounds are between 61.1 and 69.8.

Country: Spain , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.7 and 68.4. Uncertainty (95%) bounds are between 60.8 and 70.2.

Country: Spain , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.3 and 68.5. Uncertainty (95%) bounds are between 60.5 and 70.4.

Country: Spain , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.2 and 68.4. Uncertainty (95%) bounds are between 60.4 and 70.2.

Country: Spain , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.4 and 68. Uncertainty (95%) bounds are between 60.6 and 69.8.

Country: Spain , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.1 and 67.6. Uncertainty (95%) bounds are between 61 and 69.2.

Country: Spain , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.1 and 67.3. Uncertainty (95%) bounds are between 61.7 and 68.7.

Country: Spain , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.9 and 67.9. Uncertainty (95%) bounds are between 62.4 and 69.3.

Country: Spain , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.5 and 68.5. Uncertainty (95%) bounds are between 63.1 and 69.9.

Country: Spain , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.3 and 69. Uncertainty (95%) bounds are between 62.9 and 70.5.

Country: Spain , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.3 and 69.3. Uncertainty (95%) bounds are between 62.3 and 71.

Country: Spain , Year: 2011

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.3 and 69.3. Uncertainty (95%) bounds are between 61.6 and 71.2.

Country: Spain , Year: 2012

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.6 and 69.1. Uncertainty (95%) bounds are between 61 and 71.

Country: Spain , Year: 2013

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.1 and 68.6. Uncertainty (95%) bounds are between 60.5 and 70.6.

Country: Spain , Year: 2014

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.8 and 68. Uncertainty (95%) bounds are between 60.1 and 69.9.

Country: Spain , Year: 2015

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.2 and 67.3. Uncertainty (95%) bounds are between 59.4 and 69.4.

Country: Spain , Year: 2016

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.7 and 66.6. Uncertainty (95%) bounds are between 58.9 and 68.5.

Country: Spain , Year: 2017

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.4 and 65.8. Uncertainty (95%) bounds are between 58.5 and 67.7.

Country: Spain , Year: 2018

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.2 and 65.2. Uncertainty (95%) bounds are between 58.2 and 67.1.

Country: Spain , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 55.1 and 65.8. Uncertainty (95%) bounds are between 57.4 and 67.9.

Country: Spain , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 53.6 and 66.6. Uncertainty (95%) bounds are between 56.5 and 69.2.

Country: Spain , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 52.3 and 67.6. Uncertainty (95%) bounds are between 55.5 and 70.6.

Country: Spain , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 50.8 and 68.5. Uncertainty (95%) bounds are between 54.7 and 71.8.

Country: Sweden , Year: 1970

Estimation Method: Projection. Uncertainty (80%) bounds are between 35.1 and 71.6. Uncertainty (95%) bounds are between 44.1 and 77.

Country: Sweden , Year: 1971

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.9 and 71.7. Uncertainty (95%) bounds are between 45.3 and 76.8.

Country: Sweden , Year: 1972

Estimation Method: Projection. Uncertainty (80%) bounds are between 38.4 and 71.9. Uncertainty (95%) bounds are between 46.5 and 76.7.

Country: Sweden , Year: 1973

Estimation Method: Projection. Uncertainty (80%) bounds are between 40.1 and 72. Uncertainty (95%) bounds are between 47.7 and 76.7.

Country: Sweden , Year: 1974

Estimation Method: Projection. Uncertainty (80%) bounds are between 41.5 and 72. Uncertainty (95%) bounds are between 49.1 and 76.5.

Country: Sweden , Year: 1975

Estimation Method: Projection. Uncertainty (80%) bounds are between 43.2 and 72. Uncertainty (95%) bounds are between 50.3 and 76.1.

Country: Sweden , Year: 1976

Estimation Method: Projection. Uncertainty (80%) bounds are between 44.9 and 72. Uncertainty (95%) bounds are between 51.6 and 76.

Country: Sweden , Year: 1977

Estimation Method: Projection. Uncertainty (80%) bounds are between 46.7 and 72. Uncertainty (95%) bounds are between 52.8 and 75.9.

Country: Sweden , Year: 1978

Estimation Method: Projection. Uncertainty (80%) bounds are between 48.1 and 71.9. Uncertainty (95%) bounds are between 54 and 75.5.

Country: Sweden , Year: 1979

Estimation Method: Projection. Uncertainty (80%) bounds are between 49.6 and 71.9. Uncertainty (95%) bounds are between 55.2 and 75.3.

Country: Sweden , Year: 1980

Estimation Method: Projection. Uncertainty (80%) bounds are between 51.2 and 71.8. Uncertainty (95%) bounds are between 56.4 and 74.9.

Country: Sweden , Year: 1981

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.4 and 71.7. Uncertainty (95%) bounds are between 57.5 and 74.6.

Country: Sweden , Year: 1982

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.2 and 71.7. Uncertainty (95%) bounds are between 57.3 and 74.6.

Country: Sweden , Year: 1983

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52 and 71.6. Uncertainty (95%) bounds are between 57.2 and 74.5.

Country: Sweden , Year: 1984

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.7 and 71.5. Uncertainty (95%) bounds are between 57 and 74.6.

Country: Sweden , Year: 1985

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.7 and 71.4. Uncertainty (95%) bounds are between 56.7 and 74.4.

Country: Sweden , Year: 1986

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.6 and 71.1. Uncertainty (95%) bounds are between 56.6 and 74.1.

Country: Sweden , Year: 1987

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.6 and 70.9. Uncertainty (95%) bounds are between 56.5 and 73.8.

Country: Sweden , Year: 1988

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.7 and 70.5. Uncertainty (95%) bounds are between 56.4 and 73.4.

Country: Sweden , Year: 1989

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.7 and 70.1. Uncertainty (95%) bounds are between 56.6 and 72.9.

Country: Sweden , Year: 1990

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52 and 69.8. Uncertainty (95%) bounds are between 56.7 and 72.6.

Country: Sweden , Year: 1991

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.1 and 69.6. Uncertainty (95%) bounds are between 56.7 and 72.4.

Country: Sweden , Year: 1992

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.3 and 69.3. Uncertainty (95%) bounds are between 56.8 and 72.1.

Country: Sweden , Year: 1993

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.4 and 69.1. Uncertainty (95%) bounds are between 57 and 71.8.

Country: Sweden , Year: 1994

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.6 and 68.8. Uncertainty (95%) bounds are between 57.1 and 71.3.

Country: Sweden , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.9 and 68.5. Uncertainty (95%) bounds are between 57.3 and 70.7.

Country: Sweden , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.9 and 68.3. Uncertainty (95%) bounds are between 57.5 and 70.4.

Country: Sweden , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.3 and 68.9. Uncertainty (95%) bounds are between 57.5 and 71.1.

Country: Sweden , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.9 and 69.6. Uncertainty (95%) bounds are between 57.4 and 72.

Country: Sweden , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.8 and 70.3. Uncertainty (95%) bounds are between 57.4 and 72.9.

Country: Sweden , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.9 and 70.8. Uncertainty (95%) bounds are between 57.4 and 73.8.

Country: Sweden , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.8 and 71.4. Uncertainty (95%) bounds are between 57.4 and 74.6.

Country: Sweden , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.8 and 71.9. Uncertainty (95%) bounds are between 57.3 and 75.1.

Country: Sweden , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.8 and 72.4. Uncertainty (95%) bounds are between 57.5 and 75.6.

Country: Sweden , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53 and 72.7. Uncertainty (95%) bounds are between 57.7 and 76.1.

Country: Sweden , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.2 and 73. Uncertainty (95%) bounds are between 57.9 and 76.3.

Country: Sweden , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.6 and 73.2. Uncertainty (95%) bounds are between 58.2 and 76.5.

Country: Sweden , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54 and 73.4. Uncertainty (95%) bounds are between 58.5 and 76.5.

Country: Sweden , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.5 and 73.5. Uncertainty (95%) bounds are between 59 and 76.6.

Country: Sweden , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.1 and 73.5. Uncertainty (95%) bounds are between 59.4 and 76.4.

Country: Sweden , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.5 and 73.4. Uncertainty (95%) bounds are between 59.8 and 76.4.

Country: Sweden , Year: 2011

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.2 and 73.3. Uncertainty (95%) bounds are between 60.4 and 76.3.

Country: Sweden , Year: 2012

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.9 and 73.3. Uncertainty (95%) bounds are between 60.8 and 76.1.

Country: Sweden , Year: 2013

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.4 and 73.3. Uncertainty (95%) bounds are between 61.2 and 76.1.

Country: Sweden , Year: 2014

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.2 and 73.3. Uncertainty (95%) bounds are between 61.1 and 76.2.

Country: Sweden , Year: 2015

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.1 and 73.4. Uncertainty (95%) bounds are between 61 and 76.3.

Country: Sweden , Year: 2016

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.3 and 73.4. Uncertainty (95%) bounds are between 60.9 and 76.4.

Country: Sweden , Year: 2017

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.1 and 73.5. Uncertainty (95%) bounds are between 60.9 and 76.4.

Country: Sweden , Year: 2018

Estimation Method: Projection. Uncertainty (80%) bounds are between 56.5 and 73.8. Uncertainty (95%) bounds are between 60.6 and 76.8.

Country: Sweden , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 55.7 and 74.3. Uncertainty (95%) bounds are between 60 and 77.5.

Country: Sweden , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 54.6 and 74.9. Uncertainty (95%) bounds are between 59.4 and 78.2.

Country: Sweden , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 53.7 and 75.4. Uncertainty (95%) bounds are between 58.7 and 79.

Country: Sweden , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 52.8 and 76. Uncertainty (95%) bounds are between 58.2 and 79.8.

Country: Switzerland , Year: 1970

Estimation Method: Projection. Uncertainty (80%) bounds are between 23.8 and 68.3. Uncertainty (95%) bounds are between 33.5 and 75.2.

Country: Switzerland , Year: 1971

Estimation Method: Projection. Uncertainty (80%) bounds are between 26.2 and 68.8. Uncertainty (95%) bounds are between 35.8 and 75.2.

Country: Switzerland , Year: 1972

Estimation Method: Projection. Uncertainty (80%) bounds are between 28.9 and 69.3. Uncertainty (95%) bounds are between 38.1 and 75.6.

Country: Switzerland , Year: 1973

Estimation Method: Projection. Uncertainty (80%) bounds are between 31.3 and 69.8. Uncertainty (95%) bounds are between 40.1 and 75.6.

Country: Switzerland , Year: 1974

Estimation Method: Projection. Uncertainty (80%) bounds are between 34 and 70.1. Uncertainty (95%) bounds are between 42.3 and 75.7.

Country: Switzerland , Year: 1975

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.2 and 70.4. Uncertainty (95%) bounds are between 44.3 and 75.7.

Country: Switzerland , Year: 1976

Estimation Method: Projection. Uncertainty (80%) bounds are between 38.6 and 70.5. Uncertainty (95%) bounds are between 46.2 and 75.7.

Country: Switzerland , Year: 1977

Estimation Method: Projection. Uncertainty (80%) bounds are between 40.8 and 70.8. Uncertainty (95%) bounds are between 48 and 75.7.

Country: Switzerland , Year: 1978

Estimation Method: Projection. Uncertainty (80%) bounds are between 43.2 and 71. Uncertainty (95%) bounds are between 49.7 and 75.5.

Country: Switzerland , Year: 1979

Estimation Method: Projection. Uncertainty (80%) bounds are between 45.4 and 71.2. Uncertainty (95%) bounds are between 51.3 and 75.4.

Country: Switzerland , Year: 1980

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.2 and 71.3. Uncertainty (95%) bounds are between 52.8 and 75.3.

Country: Switzerland , Year: 1981

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.2 and 71.6. Uncertainty (95%) bounds are between 53.7 and 75.5.

Country: Switzerland , Year: 1982

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.1 and 71.8. Uncertainty (95%) bounds are between 54.3 and 75.5.

Country: Switzerland , Year: 1983

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.9 and 72. Uncertainty (95%) bounds are between 55 and 75.7.

Country: Switzerland , Year: 1984

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.6 and 72.3. Uncertainty (95%) bounds are between 55.7 and 75.9.

Country: Switzerland , Year: 1985

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 51.5 and 72.5. Uncertainty (95%) bounds are between 56.5 and 76.1.

Country: Switzerland , Year: 1986

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.3 and 72.7. Uncertainty (95%) bounds are between 57.2 and 76.2.

Country: Switzerland , Year: 1987

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.4 and 72.8. Uncertainty (95%) bounds are between 58 and 76.2.

Country: Switzerland , Year: 1988

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.3 and 73. Uncertainty (95%) bounds are between 58.8 and 76.2.

Country: Switzerland , Year: 1989

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.2 and 73. Uncertainty (95%) bounds are between 59.6 and 76.2.

Country: Switzerland , Year: 1990

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56 and 73.2. Uncertainty (95%) bounds are between 60.4 and 76.2.

Country: Switzerland , Year: 1991

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.1 and 73.6. Uncertainty (95%) bounds are between 61.1 and 76.4.

Country: Switzerland , Year: 1992

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.8 and 74.1. Uncertainty (95%) bounds are between 61.9 and 76.8.

Country: Switzerland , Year: 1993

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.5 and 74.5. Uncertainty (95%) bounds are between 62.6 and 77.2.

Country: Switzerland , Year: 1994

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.3 and 75. Uncertainty (95%) bounds are between 63.3 and 77.5.

Country: Switzerland , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.3 and 75.4. Uncertainty (95%) bounds are between 63.6 and 77.8.

Country: Switzerland , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.1 and 75.7. Uncertainty (95%) bounds are between 63.5 and 78.3.

Country: Switzerland , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.8 and 76. Uncertainty (95%) bounds are between 63.3 and 78.6.

Country: Switzerland , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.4 and 76.1. Uncertainty (95%) bounds are between 63 and 79.

Country: Switzerland , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.2 and 76.2. Uncertainty (95%) bounds are between 62.8 and 79.

Country: Switzerland , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.1 and 76.3. Uncertainty (95%) bounds are between 62.6 and 79.

Country: Switzerland , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.1 and 76.2. Uncertainty (95%) bounds are between 62.6 and 79.

Country: Switzerland , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.2 and 76.2. Uncertainty (95%) bounds are between 62.6 and 79.

Country: Switzerland , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.2 and 76. Uncertainty (95%) bounds are between 62.6 and 79.

Country: Switzerland , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.5 and 75.8. Uncertainty (95%) bounds are between 62.7 and 78.8.

Country: Switzerland , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.8 and 75.6. Uncertainty (95%) bounds are between 62.8 and 78.4.

Country: Switzerland , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.2 and 75.3. Uncertainty (95%) bounds are between 63 and 78.

Country: Switzerland , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.8 and 75. Uncertainty (95%) bounds are between 63.3 and 77.6.

Country: Switzerland , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.4 and 74.5. Uncertainty (95%) bounds are between 63.6 and 76.9.

Country: Switzerland , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.3 and 73.9. Uncertainty (95%) bounds are between 64.1 and 76.1.

Country: Switzerland , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.3 and 73.3. Uncertainty (95%) bounds are between 64.8 and 75.3.

Country: Switzerland , Year: 2011

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.3 and 72.6. Uncertainty (95%) bounds are between 65.4 and 74.3.

Country: Switzerland , Year: 2012

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.1 and 71.9. Uncertainty (95%) bounds are between 65.8 and 73.4.

Country: Switzerland , Year: 2013

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.7 and 71.8. Uncertainty (95%) bounds are between 65.5 and 73.4.

Country: Switzerland , Year: 2014

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.2 and 71.8. Uncertainty (95%) bounds are between 65.2 and 73.3.

Country: Switzerland , Year: 2015

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63 and 71.6. Uncertainty (95%) bounds are between 64.9 and 73.1.

Country: Switzerland , Year: 2016

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63 and 71.3. Uncertainty (95%) bounds are between 64.9 and 72.9.

Country: Switzerland , Year: 2017

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63 and 71.2. Uncertainty (95%) bounds are between 64.8 and 72.8.

Country: Switzerland , Year: 2018

Estimation Method: Projection. Uncertainty (80%) bounds are between 61.8 and 71.8. Uncertainty (95%) bounds are between 64.1 and 73.6.

Country: Switzerland , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 60.4 and 72.6. Uncertainty (95%) bounds are between 63.3 and 74.7.

Country: Switzerland , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 59.1 and 73.4. Uncertainty (95%) bounds are between 62.4 and 75.8.

Country: Switzerland , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 58 and 74.1. Uncertainty (95%) bounds are between 61.6 and 76.9.

Country: Switzerland , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 56.9 and 74.8. Uncertainty (95%) bounds are between 61 and 77.8.

Country: Tajikistan , Year: 1970

Estimation Method: Projection. Uncertainty (80%) bounds are between 2.5 and 34.3. Uncertainty (95%) bounds are between 5 and 48.4.

Country: Tajikistan , Year: 1971

Estimation Method: Projection. Uncertainty (80%) bounds are between 2.7 and 34.8. Uncertainty (95%) bounds are between 5.3 and 48.3.

Country: Tajikistan , Year: 1972

Estimation Method: Projection. Uncertainty (80%) bounds are between 2.9 and 35.2. Uncertainty (95%) bounds are between 5.7 and 48.

Country: Tajikistan , Year: 1973

Estimation Method: Projection. Uncertainty (80%) bounds are between 3.2 and 35.4. Uncertainty (95%) bounds are between 6.1 and 48.2.

Country: Tajikistan , Year: 1974

Estimation Method: Projection. Uncertainty (80%) bounds are between 3.5 and 35.7. Uncertainty (95%) bounds are between 6.5 and 47.9.

Country: Tajikistan , Year: 1975

Estimation Method: Projection. Uncertainty (80%) bounds are between 3.8 and 35.9. Uncertainty (95%) bounds are between 6.9 and 48.1.

Country: Tajikistan , Year: 1976

Estimation Method: Projection. Uncertainty (80%) bounds are between 4.2 and 36.1. Uncertainty (95%) bounds are between 7.4 and 48.2.

Country: Tajikistan , Year: 1977

Estimation Method: Projection. Uncertainty (80%) bounds are between 4.5 and 36.3. Uncertainty (95%) bounds are between 7.9 and 48.

Country: Tajikistan , Year: 1978

Estimation Method: Projection. Uncertainty (80%) bounds are between 4.9 and 36.6. Uncertainty (95%) bounds are between 8.3 and 48.

Country: Tajikistan , Year: 1979

Estimation Method: Projection. Uncertainty (80%) bounds are between 5.3 and 36.7. Uncertainty (95%) bounds are between 8.9 and 47.9.

Country: Tajikistan , Year: 1980

Estimation Method: Projection. Uncertainty (80%) bounds are between 5.8 and 36.9. Uncertainty (95%) bounds are between 9.5 and 47.8.

Country: Tajikistan , Year: 1981

Estimation Method: Projection. Uncertainty (80%) bounds are between 6.3 and 37. Uncertainty (95%) bounds are between 10 and 47.5.

Country: Tajikistan , Year: 1982

Estimation Method: Projection. Uncertainty (80%) bounds are between 7 and 37.2. Uncertainty (95%) bounds are between 10.6 and 47.2.

Country: Tajikistan , Year: 1983

Estimation Method: Projection. Uncertainty (80%) bounds are between 7.6 and 37.3. Uncertainty (95%) bounds are between 11.3 and 46.9.

Country: Tajikistan , Year: 1984

Estimation Method: Projection. Uncertainty (80%) bounds are between 8.2 and 37.4. Uncertainty (95%) bounds are between 12 and 46.5.

Country: Tajikistan , Year: 1985

Estimation Method: Projection. Uncertainty (80%) bounds are between 8.9 and 37.6. Uncertainty (95%) bounds are between 12.7 and 46.5.

Country: Tajikistan , Year: 1986

Estimation Method: Projection. Uncertainty (80%) bounds are between 9.6 and 37.8. Uncertainty (95%) bounds are between 13.5 and 46.5.

Country: Tajikistan , Year: 1987

Estimation Method: Projection. Uncertainty (80%) bounds are between 10.4 and 37.8. Uncertainty (95%) bounds are between 14.2 and 46.2.

Country: Tajikistan , Year: 1988

Estimation Method: Projection. Uncertainty (80%) bounds are between 11.1 and 37.9. Uncertainty (95%) bounds are between 15.1 and 45.9.

Country: Tajikistan , Year: 1989

Estimation Method: Projection. Uncertainty (80%) bounds are between 12 and 37.9. Uncertainty (95%) bounds are between 15.9 and 45.3.

Country: Tajikistan , Year: 1990

Estimation Method: Projection. Uncertainty (80%) bounds are between 12.8 and 38. Uncertainty (95%) bounds are between 16.7 and 45.

Country: Tajikistan , Year: 1991

Estimation Method: Projection. Uncertainty (80%) bounds are between 13.6 and 37.9. Uncertainty (95%) bounds are between 17.4 and 44.4.

Country: Tajikistan , Year: 1992

Estimation Method: Projection. Uncertainty (80%) bounds are between 14.4 and 37.9. Uncertainty (95%) bounds are between 18.1 and 44.

Country: Tajikistan , Year: 1993

Estimation Method: Projection. Uncertainty (80%) bounds are between 15.3 and 37.8. Uncertainty (95%) bounds are between 18.9 and 43.5.

Country: Tajikistan , Year: 1994

Estimation Method: Projection. Uncertainty (80%) bounds are between 16 and 37.5. Uncertainty (95%) bounds are between 19.6 and 43.

Country: Tajikistan , Year: 1995

Estimation Method: Projection. Uncertainty (80%) bounds are between 17 and 37.2. Uncertainty (95%) bounds are between 20.3 and 42.4.

Country: Tajikistan , Year: 1996

Estimation Method: Projection. Uncertainty (80%) bounds are between 17.9 and 36.8. Uncertainty (95%) bounds are between 21.1 and 41.8.

Country: Tajikistan , Year: 1997

Estimation Method: Projection. Uncertainty (80%) bounds are between 18.8 and 36.5. Uncertainty (95%) bounds are between 21.9 and 40.9.

Country: Tajikistan , Year: 1998

Estimation Method: Projection. Uncertainty (80%) bounds are between 19.8 and 36.2. Uncertainty (95%) bounds are between 22.7 and 40.2.

Country: Tajikistan , Year: 1999

Estimation Method: Projection. Uncertainty (80%) bounds are between 20.8 and 35.8. Uncertainty (95%) bounds are between 23.6 and 39.4.

Country: Tajikistan , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 21.8 and 35.4. Uncertainty (95%) bounds are between 24.4 and 38.6.

Country: Tajikistan , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 22.3 and 35.4. Uncertainty (95%) bounds are between 24.9 and 38.6.

Country: Tajikistan , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 23 and 35.5. Uncertainty (95%) bounds are between 25.4 and 38.6.

Country: Tajikistan , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 23.5 and 35.5. Uncertainty (95%) bounds are between 25.8 and 38.2.

Country: Tajikistan , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 24 and 35.3. Uncertainty (95%) bounds are between 26.2 and 37.8.

Country: Tajikistan , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 24.4 and 34.9. Uncertainty (95%) bounds are between 26.5 and 37.2.

Country: Tajikistan , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 24.2 and 34.3. Uncertainty (95%) bounds are between 26.3 and 36.6.

Country: Tajikistan , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 24 and 33.4. Uncertainty (95%) bounds are between 25.9 and 35.6.

Country: Tajikistan , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 23.6 and 32.7. Uncertainty (95%) bounds are between 25.4 and 34.8.

Country: Tajikistan , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 23.3 and 31.6. Uncertainty (95%) bounds are between 24.9 and 33.6.

Country: Tajikistan , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 23.2 and 30.4. Uncertainty (95%) bounds are between 24.6 and 32.1.

Country: Tajikistan , Year: 2011

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 23.5 and 29.1. Uncertainty (95%) bounds are between 24.6 and 30.5.

Country: Tajikistan , Year: 2012

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 23.8 and 28.1. Uncertainty (95%) bounds are between 24.7 and 29.2.

Country: Tajikistan , Year: 2013

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 23.1 and 28.4. Uncertainty (95%) bounds are between 24.2 and 29.6.

Country: Tajikistan , Year: 2014

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 22.7 and 28.8. Uncertainty (95%) bounds are between 24 and 30.2.

Country: Tajikistan , Year: 2015

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 22.9 and 29. Uncertainty (95%) bounds are between 24.2 and 30.4.

Country: Tajikistan , Year: 2016

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 23.7 and 29. Uncertainty (95%) bounds are between 24.8 and 30.2.

Country: Tajikistan , Year: 2017

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 24.5 and 29. Uncertainty (95%) bounds are between 25.5 and 30.1.

Country: Tajikistan , Year: 2018

Estimation Method: Projection. Uncertainty (80%) bounds are between 23.8 and 30.4. Uncertainty (95%) bounds are between 25.1 and 31.9.

Country: Tajikistan , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 22.9 and 32.1. Uncertainty (95%) bounds are between 24.6 and 34.2.

Country: Tajikistan , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 22.1 and 33.7. Uncertainty (95%) bounds are between 24.2 and 36.5.

Country: Tajikistan , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 21.3 and 35.3. Uncertainty (95%) bounds are between 23.9 and 38.6.

Country: Tajikistan , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 20.7 and 36.9. Uncertainty (95%) bounds are between 23.7 and 40.8.

Country: Turkmenistan , Year: 1970

Estimation Method: Projection. Uncertainty (80%) bounds are between 4.4 and 51.3. Uncertainty (95%) bounds are between 9.4 and 62.9.

Country: Turkmenistan , Year: 1971

Estimation Method: Projection. Uncertainty (80%) bounds are between 4.9 and 51.5. Uncertainty (95%) bounds are between 10 and 62.5.

Country: Turkmenistan , Year: 1972

Estimation Method: Projection. Uncertainty (80%) bounds are between 5.4 and 51.4. Uncertainty (95%) bounds are between 10.7 and 62.3.

Country: Turkmenistan , Year: 1973

Estimation Method: Projection. Uncertainty (80%) bounds are between 5.9 and 51.8. Uncertainty (95%) bounds are between 11.4 and 62.3.

Country: Turkmenistan , Year: 1974

Estimation Method: Projection. Uncertainty (80%) bounds are between 6.6 and 52. Uncertainty (95%) bounds are between 12 and 62.4.

Country: Turkmenistan , Year: 1975

Estimation Method: Projection. Uncertainty (80%) bounds are between 7.2 and 52. Uncertainty (95%) bounds are between 12.9 and 62.2.

Country: Turkmenistan , Year: 1976

Estimation Method: Projection. Uncertainty (80%) bounds are between 7.9 and 52.1. Uncertainty (95%) bounds are between 13.6 and 61.9.

Country: Turkmenistan , Year: 1977

Estimation Method: Projection. Uncertainty (80%) bounds are between 8.6 and 52.2. Uncertainty (95%) bounds are between 14.6 and 61.8.

Country: Turkmenistan , Year: 1978

Estimation Method: Projection. Uncertainty (80%) bounds are between 9.4 and 52.3. Uncertainty (95%) bounds are between 15.4 and 61.5.

Country: Turkmenistan , Year: 1979

Estimation Method: Projection. Uncertainty (80%) bounds are between 10.4 and 52.4. Uncertainty (95%) bounds are between 16.4 and 61.5.

Country: Turkmenistan , Year: 1980

Estimation Method: Projection. Uncertainty (80%) bounds are between 11.3 and 52.4. Uncertainty (95%) bounds are between 17.2 and 61.1.

Country: Turkmenistan , Year: 1981

Estimation Method: Projection. Uncertainty (80%) bounds are between 12.2 and 52.3. Uncertainty (95%) bounds are between 18.3 and 61.1.

Country: Turkmenistan , Year: 1982

Estimation Method: Projection. Uncertainty (80%) bounds are between 13.3 and 52.3. Uncertainty (95%) bounds are between 19.5 and 60.9.

Country: Turkmenistan , Year: 1983

Estimation Method: Projection. Uncertainty (80%) bounds are between 14.3 and 52.2. Uncertainty (95%) bounds are between 20.5 and 60.4.

Country: Turkmenistan , Year: 1984

Estimation Method: Projection. Uncertainty (80%) bounds are between 15.5 and 52.1. Uncertainty (95%) bounds are between 21.6 and 59.9.

Country: Turkmenistan , Year: 1985

Estimation Method: Projection. Uncertainty (80%) bounds are between 16.7 and 52.1. Uncertainty (95%) bounds are between 22.8 and 59.4.

Country: Turkmenistan , Year: 1986

Estimation Method: Projection. Uncertainty (80%) bounds are between 17.9 and 51.9. Uncertainty (95%) bounds are between 23.9 and 59.3.

Country: Turkmenistan , Year: 1987

Estimation Method: Projection. Uncertainty (80%) bounds are between 19.3 and 52. Uncertainty (95%) bounds are between 25.1 and 58.9.

Country: Turkmenistan , Year: 1988

Estimation Method: Projection. Uncertainty (80%) bounds are between 20.7 and 51.9. Uncertainty (95%) bounds are between 26.4 and 58.4.

Country: Turkmenistan , Year: 1989

Estimation Method: Projection. Uncertainty (80%) bounds are between 22.1 and 51.7. Uncertainty (95%) bounds are between 27.6 and 58.

Country: Turkmenistan , Year: 1990

Estimation Method: Projection. Uncertainty (80%) bounds are between 23.7 and 51.6. Uncertainty (95%) bounds are between 28.8 and 57.6.

Country: Turkmenistan , Year: 1991

Estimation Method: Projection. Uncertainty (80%) bounds are between 25.2 and 51.5. Uncertainty (95%) bounds are between 30.1 and 57.3.

Country: Turkmenistan , Year: 1992

Estimation Method: Projection. Uncertainty (80%) bounds are between 26.7 and 51.5. Uncertainty (95%) bounds are between 31.4 and 56.9.

Country: Turkmenistan , Year: 1993

Estimation Method: Projection. Uncertainty (80%) bounds are between 28.2 and 51.3. Uncertainty (95%) bounds are between 32.7 and 56.2.

Country: Turkmenistan , Year: 1994

Estimation Method: Projection. Uncertainty (80%) bounds are between 29.8 and 51.1. Uncertainty (95%) bounds are between 34.1 and 55.6.

Country: Turkmenistan , Year: 1995

Estimation Method: Projection. Uncertainty (80%) bounds are between 31.8 and 50.8. Uncertainty (95%) bounds are between 35.6 and 54.8.

Country: Turkmenistan , Year: 1996

Estimation Method: Projection. Uncertainty (80%) bounds are between 33.6 and 50.4. Uncertainty (95%) bounds are between 37.1 and 53.9.

Country: Turkmenistan , Year: 1997

Estimation Method: Projection. Uncertainty (80%) bounds are between 35.8 and 50. Uncertainty (95%) bounds are between 38.7 and 53.

Country: Turkmenistan , Year: 1998

Estimation Method: Projection. Uncertainty (80%) bounds are between 38 and 49.4. Uncertainty (95%) bounds are between 40.4 and 51.8.

Country: Turkmenistan , Year: 1999

Estimation Method: Projection. Uncertainty (80%) bounds are between 40.2 and 48.7. Uncertainty (95%) bounds are between 42.1 and 50.4.

Country: Turkmenistan , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42 and 48. Uncertainty (95%) bounds are between 43.4 and 49.4.

Country: Turkmenistan , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 41.4 and 49. Uncertainty (95%) bounds are between 43 and 50.7.

Country: Turkmenistan , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 40.4 and 50.1. Uncertainty (95%) bounds are between 42.4 and 52.1.

Country: Turkmenistan , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 39.6 and 50.8. Uncertainty (95%) bounds are between 41.9 and 53.2.

Country: Turkmenistan , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.9 and 51.2. Uncertainty (95%) bounds are between 41.5 and 53.9.

Country: Turkmenistan , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.6 and 51.5. Uncertainty (95%) bounds are between 41.2 and 54.4.

Country: Turkmenistan , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.3 and 51.8. Uncertainty (95%) bounds are between 41.1 and 54.8.

Country: Turkmenistan , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.8 and 52.3. Uncertainty (95%) bounds are between 40.8 and 55.4.

Country: Turkmenistan , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.5 and 52.7. Uncertainty (95%) bounds are between 40.6 and 56.

Country: Turkmenistan , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.2 and 53.2. Uncertainty (95%) bounds are between 40.4 and 56.7.

Country: Turkmenistan , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.1 and 53.6. Uncertainty (95%) bounds are between 40.4 and 57.1.

Country: Turkmenistan , Year: 2011

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.2 and 53.8. Uncertainty (95%) bounds are between 40.5 and 57.3.

Country: Turkmenistan , Year: 2012

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.3 and 53.8. Uncertainty (95%) bounds are between 40.7 and 57.2.

Country: Turkmenistan , Year: 2013

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.8 and 53.7. Uncertainty (95%) bounds are between 41 and 57.1.

Country: Turkmenistan , Year: 2014

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.2 and 53.6. Uncertainty (95%) bounds are between 41.4 and 56.9.

Country: Turkmenistan , Year: 2015

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.7 and 53.7. Uncertainty (95%) bounds are between 41.8 and 56.7.

Country: Turkmenistan , Year: 2016

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.9 and 53.8. Uncertainty (95%) bounds are between 41.9 and 56.8.

Country: Turkmenistan , Year: 2017

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.9 and 54.2. Uncertainty (95%) bounds are between 42 and 57.2.

Country: Turkmenistan , Year: 2018

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.9 and 54.6. Uncertainty (95%) bounds are between 42.1 and 57.8.

Country: Turkmenistan , Year: 2019

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.8 and 55.1. Uncertainty (95%) bounds are between 42.2 and 58.5.

Country: Turkmenistan , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 38.2 and 56. Uncertainty (95%) bounds are between 41.9 and 59.6.

Country: Turkmenistan , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 37.5 and 57. Uncertainty (95%) bounds are between 41.6 and 60.9.

Country: Turkmenistan , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.9 and 58.1. Uncertainty (95%) bounds are between 41.2 and 62.2.

Country: Türkiye , Year: 1970

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 6.6 and 15. Uncertainty (95%) bounds are between 8 and 17.2.

Country: Türkiye , Year: 1971

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 7.1 and 14.9. Uncertainty (95%) bounds are between 8.4 and 17.

Country: Türkiye , Year: 1972

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 7.9 and 14.8. Uncertainty (95%) bounds are between 9 and 16.6.

Country: Türkiye , Year: 1973

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 8.6 and 14.6. Uncertainty (95%) bounds are between 9.7 and 16.3.

Country: Türkiye , Year: 1974

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 9 and 15.9. Uncertainty (95%) bounds are between 10.2 and 17.7.

Country: Türkiye , Year: 1975

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 9.5 and 17.2. Uncertainty (95%) bounds are between 10.9 and 19.2.

Country: Türkiye , Year: 1976

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 10.3 and 18.4. Uncertainty (95%) bounds are between 11.7 and 20.6.

Country: Türkiye , Year: 1977

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 11.2 and 19.6. Uncertainty (95%) bounds are between 12.8 and 21.6.

Country: Türkiye , Year: 1978

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 12.3 and 20.6. Uncertainty (95%) bounds are between 13.9 and 22.6.

Country: Türkiye , Year: 1979

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 13 and 22.2. Uncertainty (95%) bounds are between 14.7 and 24.5.

Country: Türkiye , Year: 1980

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 13.7 and 23.8. Uncertainty (95%) bounds are between 15.6 and 26.2.

Country: Türkiye , Year: 1981

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 14.7 and 25.1. Uncertainty (95%) bounds are between 16.7 and 27.7.

Country: Türkiye , Year: 1982

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 16.1 and 26.4. Uncertainty (95%) bounds are between 18 and 29.

Country: Türkiye , Year: 1983

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 17.6 and 27.5. Uncertainty (95%) bounds are between 19.5 and 30.

Country: Türkiye , Year: 1984

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 18.4 and 29.6. Uncertainty (95%) bounds are between 20.6 and 32.3.

Country: Türkiye , Year: 1985

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 19.5 and 31.6. Uncertainty (95%) bounds are between 21.8 and 34.3.

Country: Türkiye , Year: 1986

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 21 and 33.3. Uncertainty (95%) bounds are between 23.3 and 36.1.

Country: Türkiye , Year: 1987

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 22.6 and 34.8. Uncertainty (95%) bounds are between 25 and 37.6.

Country: Türkiye , Year: 1988

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 24.5 and 36. Uncertainty (95%) bounds are between 26.8 and 38.5.

Country: Türkiye , Year: 1989

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 24.9 and 36.9. Uncertainty (95%) bounds are between 27.3 and 39.5.

Country: Türkiye , Year: 1990

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 25.5 and 37.6. Uncertainty (95%) bounds are between 27.9 and 40.1.

Country: Türkiye , Year: 1991

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 26.5 and 37.9. Uncertainty (95%) bounds are between 28.9 and 40.2.

Country: Türkiye , Year: 1992

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 28 and 37.8. Uncertainty (95%) bounds are between 30.1 and 39.7.

Country: Türkiye , Year: 1993

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 30.3 and 37.3. Uncertainty (95%) bounds are between 31.8 and 38.7.

Country: Türkiye , Year: 1994

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 29.3 and 38.9. Uncertainty (95%) bounds are between 31.3 and 40.8.

Country: Türkiye , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 29.1 and 39.9. Uncertainty (95%) bounds are between 31.3 and 42.1.

Country: Türkiye , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 29.5 and 40.4. Uncertainty (95%) bounds are between 31.8 and 42.6.

Country: Türkiye , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 30.7 and 40.6. Uncertainty (95%) bounds are between 32.9 and 42.6.

Country: Türkiye , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 32.9 and 40.4. Uncertainty (95%) bounds are between 34.5 and 42.

Country: Türkiye , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 32.3 and 42.6. Uncertainty (95%) bounds are between 34.5 and 44.6.

Country: Türkiye , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 32.4 and 44.5. Uncertainty (95%) bounds are between 34.9 and 46.9.

Country: Türkiye , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 33 and 46. Uncertainty (95%) bounds are between 35.9 and 48.5.

Country: Türkiye , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.4 and 47.2. Uncertainty (95%) bounds are between 37.1 and 49.7.

Country: Türkiye , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 36 and 48. Uncertainty (95%) bounds are between 38.6 and 50.4.

Country: Türkiye , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.5 and 48.7. Uncertainty (95%) bounds are between 40 and 50.9.

Country: Türkiye , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.3 and 49.8. Uncertainty (95%) bounds are between 40.1 and 52.2.

Country: Türkiye , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.6 and 50.5. Uncertainty (95%) bounds are between 40.4 and 53.1.

Country: Türkiye , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.3 and 51. Uncertainty (95%) bounds are between 41 and 53.3.

Country: Türkiye , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 39.4 and 50.9. Uncertainty (95%) bounds are between 42 and 53.1.

Country: Türkiye , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.8 and 51.9. Uncertainty (95%) bounds are between 41.7 and 54.2.

Country: Türkiye , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.7 and 52.5. Uncertainty (95%) bounds are between 41.6 and 55.1.

Country: Türkiye , Year: 2011

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.9 and 52.8. Uncertainty (95%) bounds are between 42 and 55.4.

Country: Türkiye , Year: 2012

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 39.6 and 52.9. Uncertainty (95%) bounds are between 42.5 and 55.3.

Country: Türkiye , Year: 2013

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 40.6 and 52.6. Uncertainty (95%) bounds are between 43.3 and 54.9.

Country: Türkiye , Year: 2014

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 40 and 53.1. Uncertainty (95%) bounds are between 43 and 55.4.

Country: Türkiye , Year: 2015

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 39.3 and 53.4. Uncertainty (95%) bounds are between 42.6 and 56.

Country: Türkiye , Year: 2016

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 39.1 and 53.5. Uncertainty (95%) bounds are between 42.5 and 56.

Country: Türkiye , Year: 2017

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 39.4 and 53.3. Uncertainty (95%) bounds are between 42.6 and 55.7.

Country: Türkiye , Year: 2018

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 39.8 and 52.9. Uncertainty (95%) bounds are between 43 and 55.3.

Country: Türkiye , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 39.3 and 53.5. Uncertainty (95%) bounds are between 42.7 and 56.1.

Country: Türkiye , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 38.3 and 54.6. Uncertainty (95%) bounds are between 42 and 57.5.

Country: Türkiye , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 37.4 and 55.6. Uncertainty (95%) bounds are between 41.5 and 58.9.

Country: Türkiye , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.6 and 56.6. Uncertainty (95%) bounds are between 41.1 and 60.2.

Country: Ukraine , Year: 1970

Estimation Method: Projection. Uncertainty (80%) bounds are between 3.5 and 40.3. Uncertainty (95%) bounds are between 7.3 and 51.1.

Country: Ukraine , Year: 1971

Estimation Method: Projection. Uncertainty (80%) bounds are between 3.8 and 40.8. Uncertainty (95%) bounds are between 7.8 and 51.8.

Country: Ukraine , Year: 1972

Estimation Method: Projection. Uncertainty (80%) bounds are between 4.1 and 41.5. Uncertainty (95%) bounds are between 8.5 and 51.9.

Country: Ukraine , Year: 1973

Estimation Method: Projection. Uncertainty (80%) bounds are between 4.6 and 42.1. Uncertainty (95%) bounds are between 9 and 52.1.

Country: Ukraine , Year: 1974

Estimation Method: Projection. Uncertainty (80%) bounds are between 5 and 42.7. Uncertainty (95%) bounds are between 9.7 and 52.8.

Country: Ukraine , Year: 1975

Estimation Method: Projection. Uncertainty (80%) bounds are between 5.5 and 43.4. Uncertainty (95%) bounds are between 10.3 and 53.1.

Country: Ukraine , Year: 1976

Estimation Method: Projection. Uncertainty (80%) bounds are between 6 and 44. Uncertainty (95%) bounds are between 11 and 53.5.

Country: Ukraine , Year: 1977

Estimation Method: Projection. Uncertainty (80%) bounds are between 6.6 and 44.5. Uncertainty (95%) bounds are between 11.7 and 54.

Country: Ukraine , Year: 1978

Estimation Method: Projection. Uncertainty (80%) bounds are between 7.1 and 45.2. Uncertainty (95%) bounds are between 12.5 and 54.2.

Country: Ukraine , Year: 1979

Estimation Method: Projection. Uncertainty (80%) bounds are between 7.9 and 45.7. Uncertainty (95%) bounds are between 13.3 and 54.5.

Country: Ukraine , Year: 1980

Estimation Method: Projection. Uncertainty (80%) bounds are between 8.5 and 46. Uncertainty (95%) bounds are between 14.2 and 54.7.

Country: Ukraine , Year: 1981

Estimation Method: Projection. Uncertainty (80%) bounds are between 9.1 and 46.6. Uncertainty (95%) bounds are between 15 and 55.1.

Country: Ukraine , Year: 1982

Estimation Method: Projection. Uncertainty (80%) bounds are between 10 and 47.2. Uncertainty (95%) bounds are between 16 and 55.3.

Country: Ukraine , Year: 1983

Estimation Method: Projection. Uncertainty (80%) bounds are between 10.9 and 47.6. Uncertainty (95%) bounds are between 16.9 and 55.2.

Country: Ukraine , Year: 1984

Estimation Method: Projection. Uncertainty (80%) bounds are between 11.8 and 48. Uncertainty (95%) bounds are between 17.9 and 55.8.

Country: Ukraine , Year: 1985

Estimation Method: Projection. Uncertainty (80%) bounds are between 12.7 and 48.4. Uncertainty (95%) bounds are between 19 and 55.8.

Country: Ukraine , Year: 1986

Estimation Method: Projection. Uncertainty (80%) bounds are between 14 and 48.8. Uncertainty (95%) bounds are between 20.1 and 55.8.

Country: Ukraine , Year: 1987

Estimation Method: Projection. Uncertainty (80%) bounds are between 15.2 and 49.2. Uncertainty (95%) bounds are between 21.3 and 55.8.

Country: Ukraine , Year: 1988

Estimation Method: Projection. Uncertainty (80%) bounds are between 16.3 and 49.7. Uncertainty (95%) bounds are between 22.5 and 56.1.

Country: Ukraine , Year: 1989

Estimation Method: Projection. Uncertainty (80%) bounds are between 17.4 and 49.9. Uncertainty (95%) bounds are between 23.6 and 56.1.

Country: Ukraine , Year: 1990

Estimation Method: Projection. Uncertainty (80%) bounds are between 18.7 and 50.3. Uncertainty (95%) bounds are between 24.9 and 56.2.

Country: Ukraine , Year: 1991

Estimation Method: Projection. Uncertainty (80%) bounds are between 19.9 and 50.7. Uncertainty (95%) bounds are between 26.3 and 56.6.

Country: Ukraine , Year: 1992

Estimation Method: Projection. Uncertainty (80%) bounds are between 21.7 and 51.2. Uncertainty (95%) bounds are between 27.5 and 56.6.

Country: Ukraine , Year: 1993

Estimation Method: Projection. Uncertainty (80%) bounds are between 22.8 and 51.5. Uncertainty (95%) bounds are between 29 and 56.8.

Country: Ukraine , Year: 1994

Estimation Method: Projection. Uncertainty (80%) bounds are between 24.5 and 51.8. Uncertainty (95%) bounds are between 30.4 and 56.7.

Country: Ukraine , Year: 1995

Estimation Method: Projection. Uncertainty (80%) bounds are between 26.2 and 52. Uncertainty (95%) bounds are between 31.8 and 56.9.

Country: Ukraine , Year: 1996

Estimation Method: Projection. Uncertainty (80%) bounds are between 28 and 52.3. Uncertainty (95%) bounds are between 33.3 and 56.7.

Country: Ukraine , Year: 1997

Estimation Method: Projection. Uncertainty (80%) bounds are between 29.9 and 52.5. Uncertainty (95%) bounds are between 34.8 and 56.5.

Country: Ukraine , Year: 1998

Estimation Method: Projection. Uncertainty (80%) bounds are between 32.1 and 52.5. Uncertainty (95%) bounds are between 36.6 and 56.2.

Country: Ukraine , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 34.2 and 52.6. Uncertainty (95%) bounds are between 38.2 and 55.9.

Country: Ukraine , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 36.1 and 53.7. Uncertainty (95%) bounds are between 40.2 and 56.9.

Country: Ukraine , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 37.2 and 54.3. Uncertainty (95%) bounds are between 41.1 and 57.3.

Country: Ukraine , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 38.4 and 54.5. Uncertainty (95%) bounds are between 42 and 57.5.

Country: Ukraine , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 39.4 and 54.5. Uncertainty (95%) bounds are between 42.8 and 57.3.

Country: Ukraine , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 40.8 and 54.3. Uncertainty (95%) bounds are between 43.8 and 56.9.

Country: Ukraine , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42.4 and 53.8. Uncertainty (95%) bounds are between 45 and 56.

Country: Ukraine , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 42.5 and 52.6. Uncertainty (95%) bounds are between 44.8 and 54.5.

Country: Ukraine , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 43.1 and 51.2. Uncertainty (95%) bounds are between 45 and 52.9.

Country: Ukraine , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 41.7 and 52.4. Uncertainty (95%) bounds are between 44.2 and 54.4.

Country: Ukraine , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 40.8 and 53.4. Uncertainty (95%) bounds are between 43.7 and 55.8.

Country: Ukraine , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 40.3 and 54.5. Uncertainty (95%) bounds are between 43.5 and 57.2.

Country: Ukraine , Year: 2011

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 40.1 and 55.4. Uncertainty (95%) bounds are between 43.5 and 58.4.

Country: Ukraine , Year: 2012

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 40.1 and 56.3. Uncertainty (95%) bounds are between 43.6 and 59.6.

Country: Ukraine , Year: 2013

Estimation Method: Projection. Uncertainty (80%) bounds are between 39.5 and 57.5. Uncertainty (95%) bounds are between 43.4 and 61.1.

Country: Ukraine , Year: 2014

Estimation Method: Projection. Uncertainty (80%) bounds are between 38.7 and 58.7. Uncertainty (95%) bounds are between 43 and 62.7.

Country: Ukraine , Year: 2015

Estimation Method: Projection. Uncertainty (80%) bounds are between 38.2 and 59.8. Uncertainty (95%) bounds are between 42.8 and 64.

Country: Ukraine , Year: 2016

Estimation Method: Projection. Uncertainty (80%) bounds are between 37.5 and 60.7. Uncertainty (95%) bounds are between 42.7 and 65.3.

Country: Ukraine , Year: 2017

Estimation Method: Projection. Uncertainty (80%) bounds are between 37.1 and 61.7. Uncertainty (95%) bounds are between 42.7 and 66.6.

Country: Ukraine , Year: 2018

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.9 and 62.7. Uncertainty (95%) bounds are between 42.5 and 67.9.

Country: Ukraine , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.4 and 63.7. Uncertainty (95%) bounds are between 42.3 and 68.8.

Country: Ukraine , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 35.9 and 64.7. Uncertainty (95%) bounds are between 42.3 and 69.8.

Country: Ukraine , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 35.9 and 65.4. Uncertainty (95%) bounds are between 42.2 and 70.7.

Country: Ukraine , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 35.3 and 66.2. Uncertainty (95%) bounds are between 42.1 and 71.5.

Country: United Kingdom , Year: 1970

Estimation Method: Projection. Uncertainty (80%) bounds are between 31.8 and 73.7. Uncertainty (95%) bounds are between 41.8 and 79.3.

Country: United Kingdom , Year: 1971

Estimation Method: Projection. Uncertainty (80%) bounds are between 33.1 and 73.9. Uncertainty (95%) bounds are between 43 and 79.4.

Country: United Kingdom , Year: 1972

Estimation Method: Projection. Uncertainty (80%) bounds are between 34.6 and 74.1. Uncertainty (95%) bounds are between 44.2 and 79.5.

Country: United Kingdom , Year: 1973

Estimation Method: Projection. Uncertainty (80%) bounds are between 35.9 and 74.2. Uncertainty (95%) bounds are between 45.3 and 79.4.

Country: United Kingdom , Year: 1974

Estimation Method: Projection. Uncertainty (80%) bounds are between 37.5 and 74.5. Uncertainty (95%) bounds are between 46.5 and 79.4.

Country: United Kingdom , Year: 1975

Estimation Method: Projection. Uncertainty (80%) bounds are between 38.9 and 74.4. Uncertainty (95%) bounds are between 47.7 and 79.5.

Country: United Kingdom , Year: 1976

Estimation Method: Projection. Uncertainty (80%) bounds are between 40.5 and 74.6. Uncertainty (95%) bounds are between 48.9 and 79.4.

Country: United Kingdom , Year: 1977

Estimation Method: Projection. Uncertainty (80%) bounds are between 42 and 74.8. Uncertainty (95%) bounds are between 50 and 79.3.

Country: United Kingdom , Year: 1978

Estimation Method: Projection. Uncertainty (80%) bounds are between 43.2 and 74.9. Uncertainty (95%) bounds are between 51.1 and 79.2.

Country: United Kingdom , Year: 1979

Estimation Method: Projection. Uncertainty (80%) bounds are between 44.4 and 75.1. Uncertainty (95%) bounds are between 52.2 and 79.1.

Country: United Kingdom , Year: 1980

Estimation Method: Projection. Uncertainty (80%) bounds are between 45.9 and 75.1. Uncertainty (95%) bounds are between 53.3 and 79.1.

Country: United Kingdom , Year: 1981

Estimation Method: Projection. Uncertainty (80%) bounds are between 47 and 75.1. Uncertainty (95%) bounds are between 54.4 and 79.

Country: United Kingdom , Year: 1982

Estimation Method: Projection. Uncertainty (80%) bounds are between 48.8 and 75. Uncertainty (95%) bounds are between 55.5 and 78.9.

Country: United Kingdom , Year: 1983

Estimation Method: Projection. Uncertainty (80%) bounds are between 50.1 and 75. Uncertainty (95%) bounds are between 56.5 and 78.6.

Country: United Kingdom , Year: 1984

Estimation Method: Projection. Uncertainty (80%) bounds are between 51.7 and 75. Uncertainty (95%) bounds are between 57.7 and 78.2.

Country: United Kingdom , Year: 1985

Estimation Method: Projection. Uncertainty (80%) bounds are between 52.9 and 74.8. Uncertainty (95%) bounds are between 58.5 and 77.9.

Country: United Kingdom , Year: 1986

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.2 and 74.5. Uncertainty (95%) bounds are between 59.2 and 77.5.

Country: United Kingdom , Year: 1987

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.4 and 74.2. Uncertainty (95%) bounds are between 59.3 and 77.2.

Country: United Kingdom , Year: 1988

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.3 and 73.9. Uncertainty (95%) bounds are between 59.3 and 76.7.

Country: United Kingdom , Year: 1989

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.8 and 73.6. Uncertainty (95%) bounds are between 59.4 and 76.4.

Country: United Kingdom , Year: 1990

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.4 and 73.7. Uncertainty (95%) bounds are between 59.9 and 76.5.

Country: United Kingdom , Year: 1991

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.5 and 74.2. Uncertainty (95%) bounds are between 60.8 and 76.9.

Country: United Kingdom , Year: 1992

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58 and 74.9. Uncertainty (95%) bounds are between 62.1 and 77.7.

Country: United Kingdom , Year: 1993

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.5 and 75.7. Uncertainty (95%) bounds are between 63.4 and 78.3.

Country: United Kingdom , Year: 1994

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.4 and 76.2. Uncertainty (95%) bounds are between 64.2 and 78.9.

Country: United Kingdom , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.3 and 76.6. Uncertainty (95%) bounds are between 65 and 79.1.

Country: United Kingdom , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.5 and 76.6. Uncertainty (95%) bounds are between 65.2 and 79.1.

Country: United Kingdom , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.5 and 76.6. Uncertainty (95%) bounds are between 65.3 and 79.

Country: United Kingdom , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.8 and 76.4. Uncertainty (95%) bounds are between 65.5 and 78.8.

Country: United Kingdom , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 61.1 and 76.1. Uncertainty (95%) bounds are between 64.8 and 78.5.

Country: United Kingdom , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62 and 76.8. Uncertainty (95%) bounds are between 65.7 and 79.1.

Country: United Kingdom , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63 and 77.4. Uncertainty (95%) bounds are between 66.7 and 79.7.

Country: United Kingdom , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.9 and 77.9. Uncertainty (95%) bounds are between 67.3 and 80.1.

Country: United Kingdom , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.2 and 78.1. Uncertainty (95%) bounds are between 67.6 and 80.4.

Country: United Kingdom , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.8 and 77.9. Uncertainty (95%) bounds are between 67.2 and 80.1.

Country: United Kingdom , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.1 and 77.5. Uncertainty (95%) bounds are between 66.6 and 79.9.

Country: United Kingdom , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.6 and 77.5. Uncertainty (95%) bounds are between 66.3 and 79.8.

Country: United Kingdom , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.3 and 77.4. Uncertainty (95%) bounds are between 66.1 and 79.8.

Country: United Kingdom , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 62.3 and 77.2. Uncertainty (95%) bounds are between 66 and 79.6.

Country: United Kingdom , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.9 and 76.6. Uncertainty (95%) bounds are between 64.8 and 79.1.

Country: United Kingdom , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.7 and 75.8. Uncertainty (95%) bounds are between 63.7 and 78.4.

Country: United Kingdom , Year: 2011

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.5 and 75. Uncertainty (95%) bounds are between 62.6 and 77.8.

Country: United Kingdom , Year: 2012

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.4 and 74.8. Uncertainty (95%) bounds are between 61.7 and 77.7.

Country: United Kingdom , Year: 2013

Estimation Method: Projection. Uncertainty (80%) bounds are between 56.6 and 75. Uncertainty (95%) bounds are between 60.9 and 78.1.

Country: United Kingdom , Year: 2014

Estimation Method: Projection. Uncertainty (80%) bounds are between 55.7 and 75.4. Uncertainty (95%) bounds are between 60.4 and 78.6.

Country: United Kingdom , Year: 2015

Estimation Method: Projection. Uncertainty (80%) bounds are between 54.9 and 75.8. Uncertainty (95%) bounds are between 59.9 and 79.2.

Country: United Kingdom , Year: 2016

Estimation Method: Projection. Uncertainty (80%) bounds are between 54.1 and 76.3. Uncertainty (95%) bounds are between 59.4 and 79.8.

Country: United Kingdom , Year: 2017

Estimation Method: Projection. Uncertainty (80%) bounds are between 53.3 and 76.7. Uncertainty (95%) bounds are between 59 and 80.4.

Country: United Kingdom , Year: 2018

Estimation Method: Projection. Uncertainty (80%) bounds are between 52.5 and 77.1. Uncertainty (95%) bounds are between 58.6 and 81.

Country: United Kingdom , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 52.1 and 77.6. Uncertainty (95%) bounds are between 58.2 and 81.5.

Country: United Kingdom , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 51.3 and 78.1. Uncertainty (95%) bounds are between 57.9 and 82.1.

Country: United Kingdom , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 50.8 and 78.5. Uncertainty (95%) bounds are between 57.5 and 82.6.

Country: United Kingdom , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 50.4 and 78.9. Uncertainty (95%) bounds are between 57.2 and 83.

Country: United States of America , Year: 1970

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 47.2 and 60.8. Uncertainty (95%) bounds are between 50.1 and 63.4.

Country: United States of America , Year: 1971

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.9 and 62.5. Uncertainty (95%) bounds are between 51.9 and 65.2.

Country: United States of America , Year: 1972

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.9 and 64.3. Uncertainty (95%) bounds are between 53.9 and 66.8.

Country: United States of America , Year: 1973

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.2 and 65.8. Uncertainty (95%) bounds are between 56 and 68.2.

Country: United States of America , Year: 1974

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.8 and 67.3. Uncertainty (95%) bounds are between 57.7 and 69.6.

Country: United States of America , Year: 1975

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.1 and 68.1. Uncertainty (95%) bounds are between 58.9 and 70.3.

Country: United States of America , Year: 1976

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.7 and 67.3. Uncertainty (95%) bounds are between 57.6 and 69.7.

Country: United States of America , Year: 1977

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.6 and 67.4. Uncertainty (95%) bounds are between 56.9 and 70.1.

Country: United States of America , Year: 1978

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.9 and 67.7. Uncertainty (95%) bounds are between 56.3 and 70.4.

Country: United States of America , Year: 1979

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.3 and 67.7. Uncertainty (95%) bounds are between 55.9 and 70.5.

Country: United States of America , Year: 1980

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.3 and 67.7. Uncertainty (95%) bounds are between 55.8 and 70.7.

Country: United States of America , Year: 1981

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.2 and 67.8. Uncertainty (95%) bounds are between 55.7 and 70.5.

Country: United States of America , Year: 1982

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.3 and 67.8. Uncertainty (95%) bounds are between 55.8 and 70.6.

Country: United States of America , Year: 1983

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.3 and 68.1. Uncertainty (95%) bounds are between 56 and 71.

Country: United States of America , Year: 1984

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.3 and 68.6. Uncertainty (95%) bounds are between 56.1 and 71.4.

Country: United States of America , Year: 1985

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.7 and 68.9. Uncertainty (95%) bounds are between 56.4 and 71.7.

Country: United States of America , Year: 1986

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52.9 and 69.1. Uncertainty (95%) bounds are between 56.8 and 71.9.

Country: United States of America , Year: 1987

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.6 and 69.2. Uncertainty (95%) bounds are between 57.3 and 72.

Country: United States of America , Year: 1988

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.1 and 69.3. Uncertainty (95%) bounds are between 57.7 and 71.9.

Country: United States of America , Year: 1989

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.8 and 69.1. Uncertainty (95%) bounds are between 57.5 and 71.5.

Country: United States of America , Year: 1990

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.7 and 69. Uncertainty (95%) bounds are between 57.4 and 71.5.

Country: United States of America , Year: 1991

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.7 and 69.3. Uncertainty (95%) bounds are between 57.4 and 72.1.

Country: United States of America , Year: 1992

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.9 and 69.9. Uncertainty (95%) bounds are between 57.8 and 72.7.

Country: United States of America , Year: 1993

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.4 and 70.5. Uncertainty (95%) bounds are between 58.3 and 73.2.

Country: United States of America , Year: 1994

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.8 and 70.9. Uncertainty (95%) bounds are between 58.8 and 73.5.

Country: United States of America , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.6 and 71.1. Uncertainty (95%) bounds are between 59.3 and 73.7.

Country: United States of America , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.2 and 71.2. Uncertainty (95%) bounds are between 59.1 and 73.9.

Country: United States of America , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55 and 71.2. Uncertainty (95%) bounds are between 58.9 and 73.9.

Country: United States of America , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.8 and 70.9. Uncertainty (95%) bounds are between 58.6 and 73.8.

Country: United States of America , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.7 and 70.6. Uncertainty (95%) bounds are between 58.5 and 73.4.

Country: United States of America , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55 and 70.1. Uncertainty (95%) bounds are between 58.6 and 72.9.

Country: United States of America , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.5 and 69.8. Uncertainty (95%) bounds are between 58.8 and 72.3.

Country: United States of America , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56 and 69.5. Uncertainty (95%) bounds are between 59.1 and 71.9.

Country: United States of America , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56 and 69.9. Uncertainty (95%) bounds are between 59.4 and 72.3.

Country: United States of America , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.5 and 70.5. Uncertainty (95%) bounds are between 59.7 and 72.9.

Country: United States of America , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.1 and 71. Uncertainty (95%) bounds are between 60.3 and 73.4.

Country: United States of America , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.5 and 71.3. Uncertainty (95%) bounds are between 60.8 and 73.7.

Country: United States of America , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.7 and 71.5. Uncertainty (95%) bounds are between 60.9 and 73.9.

Country: United States of America , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.5 and 71.4. Uncertainty (95%) bounds are between 60.7 and 73.9.

Country: United States of America , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.2 and 71.2. Uncertainty (95%) bounds are between 60.5 and 73.7.

Country: United States of America , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.1 and 70.8. Uncertainty (95%) bounds are between 60.2 and 73.4.

Country: United States of America , Year: 2011

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.1 and 70.4. Uncertainty (95%) bounds are between 60.1 and 72.9.

Country: United States of America , Year: 2012

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57 and 69.8. Uncertainty (95%) bounds are between 59.8 and 72.1.

Country: United States of America , Year: 2013

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.8 and 69.1. Uncertainty (95%) bounds are between 59.6 and 71.3.

Country: United States of America , Year: 2014

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 57.4 and 68.9. Uncertainty (95%) bounds are between 60 and 71.1.

Country: United States of America , Year: 2015

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 58.4 and 69.2. Uncertainty (95%) bounds are between 61 and 71.2.

Country: United States of America , Year: 2016

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.6 and 69.3. Uncertainty (95%) bounds are between 61.9 and 71.1.

Country: United States of America , Year: 2017

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.3 and 69.4. Uncertainty (95%) bounds are between 62.5 and 71.1.

Country: United States of America , Year: 2018

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 60.4 and 69.9. Uncertainty (95%) bounds are between 62.5 and 71.7.

Country: United States of America , Year: 2019

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 59.3 and 70.8. Uncertainty (95%) bounds are between 61.9 and 72.8.

Country: United States of America , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 58.1 and 71.6. Uncertainty (95%) bounds are between 61.3 and 73.9.

Country: United States of America , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 57 and 72.4. Uncertainty (95%) bounds are between 60.7 and 74.9.

Country: United States of America , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 56 and 73.1. Uncertainty (95%) bounds are between 60.1 and 75.9.

Country: Uruguay , Year: 1970

Estimation Method: Projection. Uncertainty (80%) bounds are between 32.2 and 75.7. Uncertainty (95%) bounds are between 43.8 and 81.

Country: Uruguay , Year: 1971

Estimation Method: Projection. Uncertainty (80%) bounds are between 34.6 and 76. Uncertainty (95%) bounds are between 45.6 and 81.

Country: Uruguay , Year: 1972

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.7 and 76.3. Uncertainty (95%) bounds are between 47.3 and 81.

Country: Uruguay , Year: 1973

Estimation Method: Projection. Uncertainty (80%) bounds are between 38.8 and 76.6. Uncertainty (95%) bounds are between 49.1 and 81.2.

Country: Uruguay , Year: 1974

Estimation Method: Projection. Uncertainty (80%) bounds are between 40.9 and 76.8. Uncertainty (95%) bounds are between 50.9 and 81.2.

Country: Uruguay , Year: 1975

Estimation Method: Projection. Uncertainty (80%) bounds are between 43.3 and 76.9. Uncertainty (95%) bounds are between 52.5 and 81.2.

Country: Uruguay , Year: 1976

Estimation Method: Projection. Uncertainty (80%) bounds are between 45.3 and 77. Uncertainty (95%) bounds are between 54.2 and 81.1.

Country: Uruguay , Year: 1977

Estimation Method: Projection. Uncertainty (80%) bounds are between 47.9 and 77.2. Uncertainty (95%) bounds are between 55.8 and 81.1.

Country: Uruguay , Year: 1978

Estimation Method: Projection. Uncertainty (80%) bounds are between 49.8 and 77.4. Uncertainty (95%) bounds are between 57.5 and 81.

Country: Uruguay , Year: 1979

Estimation Method: Projection. Uncertainty (80%) bounds are between 52.2 and 77.4. Uncertainty (95%) bounds are between 59 and 80.8.

Country: Uruguay , Year: 1980

Estimation Method: Projection. Uncertainty (80%) bounds are between 54.4 and 77.5. Uncertainty (95%) bounds are between 60.6 and 80.7.

Country: Uruguay , Year: 1981

Estimation Method: Projection. Uncertainty (80%) bounds are between 56.5 and 77.5. Uncertainty (95%) bounds are between 62.2 and 80.5.

Country: Uruguay , Year: 1982

Estimation Method: Projection. Uncertainty (80%) bounds are between 58.6 and 77.5. Uncertainty (95%) bounds are between 63.7 and 80.2.

Country: Uruguay , Year: 1983

Estimation Method: Projection. Uncertainty (80%) bounds are between 60.8 and 77.3. Uncertainty (95%) bounds are between 65.2 and 79.8.

Country: Uruguay , Year: 1984

Estimation Method: Projection. Uncertainty (80%) bounds are between 62.6 and 77.2. Uncertainty (95%) bounds are between 66.6 and 79.4.

Country: Uruguay , Year: 1985

Estimation Method: Projection. Uncertainty (80%) bounds are between 64.6 and 77. Uncertainty (95%) bounds are between 67.8 and 78.8.

Country: Uruguay , Year: 1986

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.2 and 76.8. Uncertainty (95%) bounds are between 68.9 and 78.5.

Country: Uruguay , Year: 1987

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66 and 77.1. Uncertainty (95%) bounds are between 68.9 and 78.9.

Country: Uruguay , Year: 1988

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.7 and 77.5. Uncertainty (95%) bounds are between 68.7 and 79.3.

Country: Uruguay , Year: 1989

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.2 and 77.8. Uncertainty (95%) bounds are between 68.3 and 79.7.

Country: Uruguay , Year: 1990

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.8 and 78.1. Uncertainty (95%) bounds are between 67.9 and 80.2.

Country: Uruguay , Year: 1991

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.3 and 78.4. Uncertainty (95%) bounds are between 67.7 and 80.7.

Country: Uruguay , Year: 1992

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.1 and 78.8. Uncertainty (95%) bounds are between 67.5 and 81.1.

Country: Uruguay , Year: 1993

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.8 and 79.1. Uncertainty (95%) bounds are between 67.4 and 81.5.

Country: Uruguay , Year: 1994

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.6 and 79.3. Uncertainty (95%) bounds are between 67.4 and 81.8.

Country: Uruguay , Year: 1995

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.4 and 79.5. Uncertainty (95%) bounds are between 67.4 and 82.1.

Country: Uruguay , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.4 and 79.7. Uncertainty (95%) bounds are between 67.4 and 82.3.

Country: Uruguay , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.5 and 79.9. Uncertainty (95%) bounds are between 67.4 and 82.4.

Country: Uruguay , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 63.8 and 79.8. Uncertainty (95%) bounds are between 67.7 and 82.5.

Country: Uruguay , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.2 and 79.8. Uncertainty (95%) bounds are between 67.9 and 82.4.

Country: Uruguay , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 64.7 and 79.8. Uncertainty (95%) bounds are between 68.1 and 82.4.

Country: Uruguay , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.1 and 79.7. Uncertainty (95%) bounds are between 68.5 and 82.2.

Country: Uruguay , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.7 and 79.5. Uncertainty (95%) bounds are between 68.8 and 81.9.

Country: Uruguay , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.1 and 79.4. Uncertainty (95%) bounds are between 69.2 and 81.6.

Country: Uruguay , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.6 and 79.3. Uncertainty (95%) bounds are between 69.5 and 81.5.

Country: Uruguay , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.4 and 79.5. Uncertainty (95%) bounds are between 69.5 and 81.8.

Country: Uruguay , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66 and 79.9. Uncertainty (95%) bounds are between 69.2 and 82.3.

Country: Uruguay , Year: 2007

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.7 and 80.3. Uncertainty (95%) bounds are between 69.1 and 82.8.

Country: Uruguay , Year: 2008

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.5 and 80.6. Uncertainty (95%) bounds are between 69.1 and 83.2.

Country: Uruguay , Year: 2009

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.4 and 80.9. Uncertainty (95%) bounds are between 69 and 83.5.

Country: Uruguay , Year: 2010

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.4 and 81.2. Uncertainty (95%) bounds are between 69.1 and 83.7.

Country: Uruguay , Year: 2011

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.4 and 81.4. Uncertainty (95%) bounds are between 69.2 and 83.9.

Country: Uruguay , Year: 2012

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.6 and 81.6. Uncertainty (95%) bounds are between 69.4 and 84.

Country: Uruguay , Year: 2013

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 65.7 and 81.7. Uncertainty (95%) bounds are between 69.7 and 84.2.

Country: Uruguay , Year: 2014

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66 and 81.9. Uncertainty (95%) bounds are between 69.9 and 84.3.

Country: Uruguay , Year: 2015

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 66.1 and 82.1. Uncertainty (95%) bounds are between 70.1 and 84.6.

Country: Uruguay , Year: 2016

Estimation Method: Projection. Uncertainty (80%) bounds are between 66 and 82.3. Uncertainty (95%) bounds are between 70.1 and 84.8.

Country: Uruguay , Year: 2017

Estimation Method: Projection. Uncertainty (80%) bounds are between 65.4 and 82.7. Uncertainty (95%) bounds are between 69.7 and 85.3.

Country: Uruguay , Year: 2018

Estimation Method: Projection. Uncertainty (80%) bounds are between 64.7 and 83. Uncertainty (95%) bounds are between 69.3 and 85.8.

Country: Uruguay , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 63.9 and 83.5. Uncertainty (95%) bounds are between 68.9 and 86.3.

Country: Uruguay , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 63.3 and 83.8. Uncertainty (95%) bounds are between 68.5 and 86.8.

Country: Uruguay , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 62.6 and 84.2. Uncertainty (95%) bounds are between 68.1 and 87.3.

Country: Uruguay , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 61.8 and 84.6. Uncertainty (95%) bounds are between 67.6 and 87.7.

Country: Uzbekistan , Year: 1970

Estimation Method: Projection. Uncertainty (80%) bounds are between 4.6 and 53.9. Uncertainty (95%) bounds are between 10.5 and 65.2.

Country: Uzbekistan , Year: 1971

Estimation Method: Projection. Uncertainty (80%) bounds are between 5.2 and 54.2. Uncertainty (95%) bounds are between 11.3 and 65.1.

Country: Uzbekistan , Year: 1972

Estimation Method: Projection. Uncertainty (80%) bounds are between 5.9 and 54.4. Uncertainty (95%) bounds are between 12.3 and 64.9.

Country: Uzbekistan , Year: 1973

Estimation Method: Projection. Uncertainty (80%) bounds are between 6.5 and 54.5. Uncertainty (95%) bounds are between 13.1 and 64.7.

Country: Uzbekistan , Year: 1974

Estimation Method: Projection. Uncertainty (80%) bounds are between 7.2 and 54.7. Uncertainty (95%) bounds are between 14.1 and 64.7.

Country: Uzbekistan , Year: 1975

Estimation Method: Projection. Uncertainty (80%) bounds are between 8.1 and 55. Uncertainty (95%) bounds are between 15.1 and 64.4.

Country: Uzbekistan , Year: 1976

Estimation Method: Projection. Uncertainty (80%) bounds are between 9 and 55.2. Uncertainty (95%) bounds are between 16.1 and 64.3.

Country: Uzbekistan , Year: 1977

Estimation Method: Projection. Uncertainty (80%) bounds are between 10.1 and 55.3. Uncertainty (95%) bounds are between 17.1 and 64.3.

Country: Uzbekistan , Year: 1978

Estimation Method: Projection. Uncertainty (80%) bounds are between 11.3 and 55.2. Uncertainty (95%) bounds are between 18.4 and 64.1.

Country: Uzbekistan , Year: 1979

Estimation Method: Projection. Uncertainty (80%) bounds are between 12.4 and 55.4. Uncertainty (95%) bounds are between 19.6 and 64.

Country: Uzbekistan , Year: 1980

Estimation Method: Projection. Uncertainty (80%) bounds are between 13.6 and 55.6. Uncertainty (95%) bounds are between 20.9 and 63.8.

Country: Uzbekistan , Year: 1981

Estimation Method: Projection. Uncertainty (80%) bounds are between 14.9 and 55.7. Uncertainty (95%) bounds are between 22.1 and 63.6.

Country: Uzbekistan , Year: 1982

Estimation Method: Projection. Uncertainty (80%) bounds are between 16.4 and 55.7. Uncertainty (95%) bounds are between 23.5 and 63.3.

Country: Uzbekistan , Year: 1983

Estimation Method: Projection. Uncertainty (80%) bounds are between 18.1 and 55.6. Uncertainty (95%) bounds are between 25 and 62.9.

Country: Uzbekistan , Year: 1984

Estimation Method: Projection. Uncertainty (80%) bounds are between 19.7 and 55.6. Uncertainty (95%) bounds are between 26.5 and 62.6.

Country: Uzbekistan , Year: 1985

Estimation Method: Projection. Uncertainty (80%) bounds are between 21.4 and 55.5. Uncertainty (95%) bounds are between 28.1 and 62.2.

Country: Uzbekistan , Year: 1986

Estimation Method: Projection. Uncertainty (80%) bounds are between 23.2 and 55.4. Uncertainty (95%) bounds are between 29.7 and 61.5.

Country: Uzbekistan , Year: 1987

Estimation Method: Projection. Uncertainty (80%) bounds are between 25.1 and 55.3. Uncertainty (95%) bounds are between 31.4 and 61.

Country: Uzbekistan , Year: 1988

Estimation Method: Projection. Uncertainty (80%) bounds are between 27.2 and 55.1. Uncertainty (95%) bounds are between 33.1 and 60.6.

Country: Uzbekistan , Year: 1989

Estimation Method: Projection. Uncertainty (80%) bounds are between 29.3 and 55. Uncertainty (95%) bounds are between 34.8 and 59.9.

Country: Uzbekistan , Year: 1990

Estimation Method: Projection. Uncertainty (80%) bounds are between 31.6 and 54.8. Uncertainty (95%) bounds are between 36.7 and 59.3.

Country: Uzbekistan , Year: 1991

Estimation Method: Projection. Uncertainty (80%) bounds are between 34 and 54.6. Uncertainty (95%) bounds are between 38.5 and 58.9.

Country: Uzbekistan , Year: 1992

Estimation Method: Projection. Uncertainty (80%) bounds are between 36.6 and 54.5. Uncertainty (95%) bounds are between 40.4 and 58.2.

Country: Uzbekistan , Year: 1993

Estimation Method: Projection. Uncertainty (80%) bounds are between 39.3 and 54.4. Uncertainty (95%) bounds are between 42.5 and 57.5.

Country: Uzbekistan , Year: 1994

Estimation Method: Projection. Uncertainty (80%) bounds are between 42.3 and 54.1. Uncertainty (95%) bounds are between 44.7 and 56.6.

Country: Uzbekistan , Year: 1995

Estimation Method: Projection. Uncertainty (80%) bounds are between 45.3 and 54.1. Uncertainty (95%) bounds are between 47.1 and 55.9.

Country: Uzbekistan , Year: 1996

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 48.2 and 54.4. Uncertainty (95%) bounds are between 49.5 and 55.9.

Country: Uzbekistan , Year: 1997

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 49.2 and 56.5. Uncertainty (95%) bounds are between 50.8 and 58.

Country: Uzbekistan , Year: 1998

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 50.3 and 58.8. Uncertainty (95%) bounds are between 52.2 and 60.6.

Country: Uzbekistan , Year: 1999

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 52 and 60.8. Uncertainty (95%) bounds are between 53.9 and 62.6.

Country: Uzbekistan , Year: 2000

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 53.9 and 62.5. Uncertainty (95%) bounds are between 55.8 and 64.2.

Country: Uzbekistan , Year: 2001

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.5 and 63.6. Uncertainty (95%) bounds are between 57.3 and 65.2.

Country: Uzbekistan , Year: 2002

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.7 and 64.5. Uncertainty (95%) bounds are between 58.5 and 66.

Country: Uzbekistan , Year: 2003

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56.6 and 65.5. Uncertainty (95%) bounds are between 58.5 and 67.3.

Country: Uzbekistan , Year: 2004

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 56 and 66.4. Uncertainty (95%) bounds are between 58.2 and 68.3.

Country: Uzbekistan , Year: 2005

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 55.4 and 67.1. Uncertainty (95%) bounds are between 57.9 and 69.3.

Country: Uzbekistan , Year: 2006

Estimation Method: Interpolation. Uncertainty (80%) bounds are between 54.8 and 67.8. Uncertainty (95%) bounds are between 57.6 and 70.3.

Country: Uzbekistan , Year: 2007

Estimation Method: Projection. Uncertainty (80%) bounds are between 53.8 and 68.6. Uncertainty (95%) bounds are between 57 and 71.4.

Country: Uzbekistan , Year: 2008

Estimation Method: Projection. Uncertainty (80%) bounds are between 52.7 and 69.5. Uncertainty (95%) bounds are between 56.5 and 72.6.

Country: Uzbekistan , Year: 2009

Estimation Method: Projection. Uncertainty (80%) bounds are between 51.8 and 70.4. Uncertainty (95%) bounds are between 55.8 and 73.7.

Country: Uzbekistan , Year: 2010

Estimation Method: Projection. Uncertainty (80%) bounds are between 50.9 and 71.2. Uncertainty (95%) bounds are between 55.4 and 74.9.

Country: Uzbekistan , Year: 2011

Estimation Method: Projection. Uncertainty (80%) bounds are between 50.1 and 71.9. Uncertainty (95%) bounds are between 54.8 and 75.8.

Country: Uzbekistan , Year: 2012

Estimation Method: Projection. Uncertainty (80%) bounds are between 49.5 and 72.6. Uncertainty (95%) bounds are between 54.4 and 76.6.

Country: Uzbekistan , Year: 2013

Estimation Method: Projection. Uncertainty (80%) bounds are between 48.8 and 73.3. Uncertainty (95%) bounds are between 54 and 77.3.

Country: Uzbekistan , Year: 2014

Estimation Method: Projection. Uncertainty (80%) bounds are between 48.1 and 73.8. Uncertainty (95%) bounds are between 53.7 and 78.1.

Country: Uzbekistan , Year: 2015

Estimation Method: Projection. Uncertainty (80%) bounds are between 47.7 and 74.3. Uncertainty (95%) bounds are between 53.5 and 78.7.

Country: Uzbekistan , Year: 2016

Estimation Method: Projection. Uncertainty (80%) bounds are between 47.2 and 74.8. Uncertainty (95%) bounds are between 53.2 and 79.4.

Country: Uzbekistan , Year: 2017

Estimation Method: Projection. Uncertainty (80%) bounds are between 46.7 and 75.3. Uncertainty (95%) bounds are between 53 and 79.9.

Country: Uzbekistan , Year: 2018

Estimation Method: Projection. Uncertainty (80%) bounds are between 46.2 and 75.7. Uncertainty (95%) bounds are between 52.8 and 80.5.

Country: Uzbekistan , Year: 2019

Estimation Method: Projection. Uncertainty (80%) bounds are between 45.8 and 76.2. Uncertainty (95%) bounds are between 52.6 and 81.

Country: Uzbekistan , Year: 2020

Estimation Method: Projection. Uncertainty (80%) bounds are between 45.4 and 76.6. Uncertainty (95%) bounds are between 52.4 and 81.5.

Country: Uzbekistan , Year: 2021

Estimation Method: Projection. Uncertainty (80%) bounds are between 45 and 77. Uncertainty (95%) bounds are between 52.1 and 82.

Country: Uzbekistan , Year: 2022

Estimation Method: Projection. Uncertainty (80%) bounds are between 44.6 and 77.4. Uncertainty (95%) bounds are between 52 and 82.5.